Plumbing Permit in New Orleans, Louisiana
Permit required
Yes, a permit is required
Before removing or replacing any water piping or plumbing fixture.
By Mario Bailey, verified against official sources
Quick answer
New Orleans requires a plumbing permit to remove or replace any water piping or plumbing fixture, with no size or cost threshold published. The permit is a jurisdictional handoff: it is issued by the Sewerage and Water Board, not by the Department of Safety and Permits, and only an Orleans Parish licensed master plumber may apply for it. A homeowner cannot pull this permit in their own name. The fee is separate from the building permit fee.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
When a permit is usually needed
Before removing or replacing any water piping or plumbing fixture.
What a plumbing permit costs in New Orleans
How to apply in New Orleans
You apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit.
What most plumbing permit applications include:
- A permit is required before any owner or authorized agent constructs, alters, repairs, removes, converts, or replaces a plumbing system regulated by the code (IRC R105.1).
- The application must identify and describe the work, describe the site, state the intended use and occupancy, and be signed by the applicant or an authorized agent (IRC R105.3).
- Two or more sets of construction documents must accompany the application, drawn with enough clarity to show the location, nature, and extent of the proposed plumbing work and how it will conform to code (IRC R106.1, R106.1.1).
- Minor plumbing repairs, such as clearing a stoppage or removing and resetting a water closet without rearranging pipes or fixtures, are exempt from permit (IRC R105.2).
- Once issued, a permit is only valid for a limited window, commonly 180 days, and becomes invalid if the work is not started or is abandoned within that time, though extensions can be requested (IRC R105.3.2, R105.5).
General submittal guidance from 2021 International Residential Code (IRC), Chapter 1 Scope and Administration, Sections R105 Permits and R106 Construction Documents. Source. City of New Orleans Department of Safety and Permits sets the exact checklist for New Orleans.
Where to apply in New Orleans:
City of New Orleans Department of Safety and Permits
- 1340 Poydras Street, Suite 800, New Orleans, LA 70112
- Phone: (504) 658-7200
- Email: permitinfo@nola.gov
Inspections and closing out your permit
Plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.
- Piping and equipment placed under a slab or floor must be in place and inspected before any concrete is poured or floor sheathing is installed over it (IRC R109.1.1.1).
- Rough plumbing, along with the mechanical, gas, and electrical rough-in, must be inspected prior to covering or concealment and before fixtures or appliances are set (IRC R109.1.2).
- Rough drain, waste, and vent (DWV) piping is tested with water, air, or (for plastic piping) a vacuum, and must show no evidence of leakage before it is closed in (IRC P2503.5.1).
- The water-distribution piping is tested and must hold tight under the system's working pressure, or under a 50 psi air test for non-plastic piping, before it is concealed (IRC P2503.7).
- The framing inspection cannot proceed until the plumbing rough inspection, along with the mechanical and electrical rough inspections, has been approved (IRC R109.1.4).
- At the final drainage test, each fixture is filled and then drained, and its traps and fixture connections must prove watertight by visual inspection (IRC P2503.5.2).
- Final inspection is made after all work required by the permit is complete, and includes confirming backflow protection, such as vacuum breakers on hose bibbs, is installed (IRC R109.1.6, P2902.4.3).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the New Orleans permit portal or by phone at (504) 658-7200.
Inspection sequence from 2021 International Residential Code (IRC), Section R109 Inspections and Section P2503 Inspection and Tests. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Plumbing Permit checklist for New Orleans
- Confirm the requirement. Yes, a permit is required. Usually needed: Before removing or replacing any water piping or plumbing fixture.
- Budget the fee. Not part of the building permit fee. The city states there is a separate fee for plumbing permits from the Sewerage and Water Board. Guide to Building Permits, last updated 1/22/2026. Official fee schedule.
- Apply. You apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit. Start at the New Orleans permit portal.
- Keep the office details handy. City of New Orleans Department of Safety and Permits. Phone: (504) 658-7200. Address: 1340 Poydras Street, Suite 800, New Orleans, LA 70112.
- Plan for inspections. Plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need a plumbing permit in New Orleans?
- New Orleans requires a plumbing permit to remove or replace any water piping or plumbing fixture, with no size or cost threshold published. The permit is a jurisdictional handoff: it is issued by the Sewerage and Water Board, not by the Department of Safety and Permits, and only an Orleans Parish licensed master plumber may apply for it. A homeowner cannot pull this permit in their own name. The fee is separate from the building permit fee. Always confirm with the City of New Orleans Department of Safety and Permits before starting.
- How much does a plumbing permit cost in New Orleans?
- Not part of the building permit fee. The city states there is a separate fee for plumbing permits from the Sewerage and Water Board. Guide to Building Permits, last updated 1/22/2026. See the official fee schedule for current amounts.
- Where do you apply for a plumbing permit in New Orleans?
- You can apply through the New Orleans permit portal or contact the City of New Orleans Department of Safety and Permits directly. The links are listed on this page.
- Can a homeowner pull a plumbing permit themselves in New Orleans?
- Under Louisiana law (La. R.S. 37:2157(A)(2), (A)(13), (A)(15)(a), (B); La. R.S. 37:2160(B) and (C)): Yes. R.S. 37:2157(A)(13) exempts an owner who supervises or takes charge of construction, alteration or repair of his own personal residence from the contractor licensing law, but caps the exemption at one residence per year, with the year running from the date the certificate of occupancy issues; the cap lifts only where a change in the owner's legal marital status, or a change in employment forcing a move more than 50 miles from his residence, requires a second home. A separate exemption at R.S. 37:2157(A)(2) covers an owner who takes charge of work on his own property for his own use, where the result will not be for sale or rent and the owner controls access. A residential property owner who physically performs home improvement work on his own residence is also exempt from home improvement licensure under R.S. 37:2157(A)(15)(a). The exemption is not self-executing at the permit counter: R.S. 37:2157(A)(13) requires an affidavit of exemption on a board form in order to obtain the building permit, and R.S. 37:2160(C) obliges the local permit official to collect that affidavit before the permit issues. R.S. 37:2157(B) adds that none of these exemptions waives local or state health and life safety code requirements, so an exempt homeowner still owes the permit and the inspections. Confirm how New Orleans applies this before you apply.
From the Library
What else needs a permit in New Orleans
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | deck area, with the exemption also requiring the deck be uncovered, no more than thirty inches high from grade at any point, detached from the dwelling unit, and not serving an exit door | Building permit fee is $60 plus $5 per $1,000 of work to be performed (job value x .005... |
| Electrical Permit | Permit required | Not specified | $40 application fee plus $3 per new circuit plus $0.30 per service amperage. |
| Fence Permit | It depends | height of the fence, with the exemption also requiring compliance with the Comprehensive Zoning Ordinance | Building permit fee is $60 plus $5 per $1,000 of work to be performed (job value x .005... |
| HVAC Permit | Permit required | Not specified | Varies based on components of work. |
| Patio Permit | It depends | Not specified | Where a permit is required, the building permit fee is $60 plus $5 per $1,000 of work to... |
| Pool Permit | Permit required | Not specified | $60 plus $5 per $1,000 of work to be performed. |
| Roof Replacement Permit | It depends | share of the roof replaced, for single and two-family homes | Base Fee: $60. |
| Shed Permit | Permit required | Not specified | $60 plus $5 per $1,000 of work to be performed. |
| Solar Permit | Permit required | Not specified | Permits for rooftop solar are classified as Electrical Permits with associated costs of... |
Plumbing Permit in other Louisiana localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not New Orleans documents; the office above sets the local rules.
Verified by a person against the sources above on , not confirmed with City of New Orleans Department of Safety and Permits. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page