Permit required

Yes, a permit is required

Before installing, repairing, replacing, or altering any electrical apparatus or equipment.

Quick answer

New Orleans requires an electrical permit for any installation, repair, replacement, or alteration of electrical apparatus or equipment, with the only carve-out being replacement of light bulbs and fuses. There is no dollar value, circuit count, or voltage threshold below which the permit is waived. The permit can only be obtained by an electrical contractor holding a Class A Electrical License from the City of New Orleans, so a homeowner cannot apply for it. A building permit may also be required for some electrical permits.

Permit fee
$40from the published schedule
Issued by
City of New Orleans Department of Safety and Permits
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an electrical permit costs in New Orleans

Permit fee
$40electrical permit, from the published schedule
Fee schedule in force
Official scheduleRead .

$40 application fee plus $3 per new circuit plus $0.30 per service amperage. $40 per construction loop. $60 per elevator, moving stair, dumbwaiter, man lift installation / modification. $40 per sign, indoors or outdoors.

Electrical Permit page, last updated 5/11/2026.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in New Orleans

General guide, not specific to this office

What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of New Orleans Department of Safety and Permits

  • 1340 Poydras Street, Suite 800, New Orleans, LA 70112
  • Phone: (504) 658-7200
  • Email: permitinfo@nola.gov

Electrical Permit in New Orleans compared with nearby Louisiana localities

LocalityPermit needed?ThresholdWhat each Louisiana schedule saysVerified
New OrleansPermit requiredAny size$40 application fee plus $3 per new circuit plus $0.30 per service amperage
Baton RougeIt dependsBefore adding, replacing or extending any electrical circuit, and before replacing a...Permit & Inspection Fees page: "Residential Mechanical, Electrical or Plumbing, Gas Trade Permits $125.00", plus "Technology Fee $25.00" charged on all permits

Permitting activity in New Orleans

In 2025, New Orleans authorized permits for 882 new residential housing units (210 single-family, 672 in multi-family buildings), valued at $149M, up from 710 the year before. That works out to about 2.3 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 389,476.

What else needs a permit in New Orleans

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsdeck area, with the exemption also requiring the deck be uncovered, no more than thirty inches high from grade at any point, detached from the dwelling unit, and not serving an exit doorBuilding permit fee is $60 plus $5 per $1,000 of work to be performed (job value x .005 + $60)
Fence PermitIt dependsheight of the fence, with the exemption also requiring compliance with the Comprehensive Zoning OrdinanceBuilding permit fee is $60 plus $5 per $1,000 of work to be performed (job value x .005 + $60)
HVAC PermitPermit requiredAny sizeSee schedule
Patio PermitIt dependsBefore adding a roof or cover over a patio, and before any paving that does not comply...Where a permit is required, the building permit fee is $60 plus $5 per $1,000 of work to be performed (job value x .005 + $60); the schedule has the rest
Plumbing PermitPermit requiredAny sizeSee schedule
Pool PermitPermit requiredAny size$60 plus $5 per $1,000 of work to be performed
Roof Replacement PermitIt dependsshare of the roof replaced, for single and two-family homesBase Fee: $60
Shed PermitPermit requiredAny size$60 plus $5 per $1,000 of work to be performed
Solar PermitPermit requiredAny sizePermits for rooftop solar are classified as Electrical Permits with associated costs of $40 plus $3 per new circuit plus $0.30 per service amperage

Frequently asked questions

Do you need an electrical permit in New Orleans?
Yes, before installing, repairing, replacing, or altering any electrical apparatus or equipment. If you are unsure how that applies to your project, call the City of New Orleans Department of Safety and Permits at (504) 658-7200 before you start.
How much does an electrical permit cost in New Orleans?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Aug 2026. For the figure on your own project, call the City of New Orleans Department of Safety and Permits at (504) 658-7200.
Where do you apply for an electrical permit in New Orleans?
You can apply through the New Orleans permit portal or contact the City of New Orleans Department of Safety and Permits directly. The links are listed on this page.
Can a homeowner pull an electrical permit themselves in New Orleans?
Under Louisiana law (La. R.S. 37:2157(A)(2), (A)(13), (A)(15)(a), (B); La. R.S. 37:2160(B) and (C)): Yes. R.S. 37:2157(A)(13) exempts an owner who supervises or takes charge of construction, alteration or repair of his own personal residence from the contractor licensing law, but caps the exemption at one residence per year, with the year running from the date the certificate of occupancy issues; the cap lifts only where a change in the owner's legal marital status, or a change in employment forcing a move more than 50 miles from his residence, requires a second home. A separate exemption at R.S. 37:2157(A)(2) covers an owner who takes charge of work on his own property for his own use, where the result will not be for sale or rent and the owner controls access. A residential property owner who physically performs home improvement work on his own residence is also exempt from home improvement licensure under R.S. 37:2157(A)(15)(a). The exemption is not self-executing at the permit counter: R.S. 37:2157(A)(13) requires an affidavit of exemption on a board form in order to obtain the building permit, and R.S. 37:2160(C) obliges the local permit official to collect that affidavit before the permit issues. R.S. 37:2157(B) adds that none of these exemptions waives local or state health and life safety code requirements, so an exempt homeowner still owes the permit and the inspections. Confirm how New Orleans applies this before you apply.

From the Library

Electrical Permit in other Louisiana localities

Everything above, sourced

How this electrical permit page for New Orleans was verified. 2 official sources: nola.gov, nola.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of New Orleans Department of Safety and Permits. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required $40
Check my project