Permit required

Yes, a permit is required

Before building a storage shed, detached garage, gazebo, or other detached accessory structure.

Confirmed on official page Verified City of New Orleans Department of Safety and Permits

By Mario Bailey, verified against official sources

Permit fee
$60
from the published schedule

Quick answer

New Orleans handles sheds under its Accessory Structure Permit, and the city publishes no square footage floor below which one is waived. Storage sheds are named directly as an example of an accessory structure, alongside detached garages, gazebos, generators, picnic pavilions, and boathouses. If the department decides complete plans are needed, the application goes through plan review for compliance with the city's amendments to the International Building Code and the Comprehensive Zoning Ordinance. A plot plan showing lot dimensions, all structures, and setbacks to property lines is required at application.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before building a storage shed, detached garage, gazebo, or other detached accessory structure.

What a shed permit costs in New Orleans

Line item
shed permit$60$60 plus $5 per $1,000 of work to be performed. If plans are required there is a plan review fee of $1 per $1,000 of work to be performed. If a property is within a local historic district (property subject to additional regulations by VCC or HDLC), there is a 50% surcharge on the permit fee. Accessory Structure Permit page, last updated 5/18/2026.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in New Orleans

A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.

What most shed permit applications include:

  • A written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
  • A scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
  • Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
  • Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
  • Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).

General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. City of New Orleans Department of Safety and Permits sets the exact checklist for New Orleans.

Where to apply in New Orleans:

City of New Orleans Department of Safety and Permits

  • 1340 Poydras Street, Suite 800, New Orleans, LA 70112
  • Phone: (504) 658-7200
  • Email: permitinfo@nola.gov

Inspections and closing out your permit

A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.

  1. Foundation or anchor inspection: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
  2. Frame inspection: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
  3. Final inspection: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
  4. For a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the New Orleans permit portal or by phone at (504) 658-7200.

Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a shed permit in New Orleans?
New Orleans handles sheds under its Accessory Structure Permit, and the city publishes no square footage floor below which one is waived. Storage sheds are named directly as an example of an accessory structure, alongside detached garages, gazebos, generators, picnic pavilions, and boathouses. If the department decides complete plans are needed, the application goes through plan review for compliance with the city's amendments to the International Building Code and the Comprehensive Zoning Ordinance. A plot plan showing lot dimensions, all structures, and setbacks to property lines is required at application. Always confirm with the City of New Orleans Department of Safety and Permits before starting.
How much does a shed permit cost in New Orleans?
$60 plus $5 per $1,000 of work to be performed. If plans are required there is a plan review fee of $1 per $1,000 of work to be performed. If a property is within a local historic district (property subject to additional regulations by VCC or HDLC), there is a 50% surcharge on the permit fee. Accessory Structure Permit page, last updated 5/18/2026. See the official fee schedule for current amounts.
How long does a shed permit take in New Orleans?
Residential projects, 2-5 days; Commercial projects, 20-30 days. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a shed permit in New Orleans?
You can apply through the New Orleans permit portal or contact the City of New Orleans Department of Safety and Permits directly. The links are listed on this page.
Can a homeowner pull a shed permit themselves in New Orleans?
Under Louisiana law (La. R.S. 37:2157(A)(2), (A)(13), (A)(15)(a), (B); La. R.S. 37:2160(B) and (C)): Yes. R.S. 37:2157(A)(13) exempts an owner who supervises or takes charge of construction, alteration or repair of his own personal residence from the contractor licensing law, but caps the exemption at one residence per year, with the year running from the date the certificate of occupancy issues; the cap lifts only where a change in the owner's legal marital status, or a change in employment forcing a move more than 50 miles from his residence, requires a second home. A separate exemption at R.S. 37:2157(A)(2) covers an owner who takes charge of work on his own property for his own use, where the result will not be for sale or rent and the owner controls access. A residential property owner who physically performs home improvement work on his own residence is also exempt from home improvement licensure under R.S. 37:2157(A)(15)(a). The exemption is not self-executing at the permit counter: R.S. 37:2157(A)(13) requires an affidavit of exemption on a board form in order to obtain the building permit, and R.S. 37:2160(C) obliges the local permit official to collect that affidavit before the permit issues. R.S. 37:2157(B) adds that none of these exemptions waives local or state health and life safety code requirements, so an exempt homeowner still owes the permit and the inspections. Confirm how New Orleans applies this before you apply.

From the Library

What else needs a permit in New Orleans

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsdeck area, with the exemption also requiring the deck be uncovered, no more than thirty inches high from grade at any point, detached from the dwelling unit, and not serving an exit doorBuilding permit fee is $60 plus $5 per $1,000 of work to be performed (job value x .005...
Electrical PermitPermit requiredNot specified$40 application fee plus $3 per new circuit plus $0.30 per service amperage.
Fence PermitIt dependsheight of the fence, with the exemption also requiring compliance with the Comprehensive Zoning OrdinanceBuilding permit fee is $60 plus $5 per $1,000 of work to be performed (job value x .005...
HVAC PermitPermit requiredNot specifiedVaries based on components of work.
Patio PermitIt dependsNot specifiedWhere a permit is required, the building permit fee is $60 plus $5 per $1,000 of work to...
Plumbing PermitPermit requiredNot specifiedNot part of the building permit fee.
Pool PermitPermit requiredNot specified$60 plus $5 per $1,000 of work to be performed.
Roof Replacement PermitIt dependsshare of the roof replaced, for single and two-family homesBase Fee: $60.
Solar PermitPermit requiredNot specifiedPermits for rooftop solar are classified as Electrical Permits with associated costs of...

Shed Permit in other Louisiana localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not New Orleans documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with City of New Orleans Department of Safety and Permits. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Shed Permit requirements across Louisiana localities

Permit required $60
Get quotes