Nevada / Henderson

Patio Permit in Henderson, Nevada

By Mario Bailey Last checked 2026-07-06 · 1 official source

Verified against official sources From an official source

Permit required

Quick answer

The City of Henderson publishes dedicated Standard Designs for patio covers and carports (B-102 for light roof coverings and B-103-2 for heavy roof coverings, current for the 2024 code cycle), confirming an established permit and plan-review process for these structures. Open, uncovered on-grade patios are not separately addressed on the city's website.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help

Tell us where your project stands. Free to ask; no obligation.

Where we have a vetted local pro who handles permits in Henderson, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

When a permit is usually needed

Before constructing a patio cover or carport

What patio permit costs in Henderson

$298 for the first 200 sq ft of a standard-plan residential patio plus $14 per additional 100 sq ft, custom patios and patio roof covers priced on separate lines, per the DSC Schedule of Fees effective 10/01/2025.

Official fee schedule

How Henderson compares in Nevada

No Nevada jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Clark CountyPermit requiredPatio covers bill as a valuation-based building permit under Table 3-A starti...
Hendersonthis pagePermit required$298 for the first 200 sq ft of a standard-plan residential patio plus $14 pe...

How to apply in Henderson

Applying for a patio permit means submitting a site plan and framing plans for a roofed patio cover, since a cover is treated as its own permitted structure regardless of size. A plain concrete or paver patio slab at or near grade is, by contrast, often exempt from that same building permit requirement.

What most patio permit applications include:

  • Filing a permit application with the local building department, which only the property owner or an authorized agent may sign, since a patio cover is treated as its own permitted structure regardless of size (IRC R105.1).
  • A scaled site plan showing the new patio cover's size and location relative to the house and other existing structures, with dimensioned distances to all property lines so required setbacks can be verified before the permit is approved (IRC R106.2).
  • Construction documents such as a framing plan and elevation, showing rafter or beam sizes and spacing, the distance between supporting posts, and the method of attachment to the house, drawn with enough clarity for the building official to confirm the work will conform to the code (IRC R106.1).
  • For the roof structure itself, plans showing compliance with the patio cover appendix's structural limits, such as adequate footing sizes for the applied post loads, since a shallow slab on grade may substitute for a deeper footing only in limited cases up to about 750 pounds of load per post (IRC Appendix AH, Section AH105.2).
  • By contrast, an at grade concrete or paver patio that is not attached to the dwelling and stays within the code's small flatwork thresholds, similar to a sidewalk, driveway, or low deck under 200 square feet and 30 inches high, commonly needs no building permit at all, so none of the plan review steps above apply (IRC R105.2).

General submittal guidance from 2021 International Residential Code (IRC), Sections R105 and R106, with Appendix AH Patio Covers (named Appendix H in the 2012, 2015, and 2018 editions). Source. City of Henderson Building and Fire Safety sets the exact checklist for Henderson.

Where to apply in Henderson:

City of Henderson Building and Fire Safety

Inspections and closing out your permit

A permitted patio cover follows the same footing, frame, and final inspection sequence used for any small accessory structure, since the posts and roof framing have to be checked before they are covered and again once the work is done. An at grade patio slab that qualifies as exempt flatwork usually needs no building inspection at all, because inspections only attach to work that required a permit in the first place.

  1. A footing inspection once the excavation, forms, and any reinforcing steel are in place but before concrete is poured, confirming the posts supporting a patio cover will bear on adequate footings (IRC R109.1.1).
  2. A frame inspection after the rafters, beams, posts, and any required rough in work are in place but before the roof sheathing or covering material conceals them, since a solid patio cover roof cannot be signed off once it is covered without this check (IRC R109.1.4).
  3. A final inspection once all permitted work, including roofing and post anchorage, is complete, which the code requires before the structure may be used (IRC R109.1.6).
  4. An at grade concrete or paver patio that qualifies as exempt flatwork under the permit rules is not subject to any of these inspection stages, since the inspection sequence only attaches to work that required a permit in the first place (IRC R105.2).
  5. Each inspection has to be requested by the permit holder rather than happening automatically, and the approved plans and permit card need to be on site and available when the inspector arrives (IRC R109.3).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Henderson permit portal or by phone at (702) 267-3620.

Inspection sequence from 2021 International Residential Code (IRC), Section R109 (Inspections). Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a patio permit in Henderson?
The City of Henderson publishes dedicated Standard Designs for patio covers and carports (B-102 for light roof coverings and B-103-2 for heavy roof coverings, current for the 2024 code cycle), confirming an established permit and plan-review process for these structures. Open, uncovered on-grade patios are not separately addressed on the city's website. Always confirm with the City of Henderson Building and Fire Safety before starting.
How much does a patio permit cost in Henderson?
$298 for the first 200 sq ft of a standard-plan residential patio plus $14 per additional 100 sq ft, custom patios and patio roof covers priced on separate lines, per the DSC Schedule of Fees effective 10/01/2025. See the official fee schedule for current amounts.
Where do you apply for a patio permit in Henderson?
You can apply through the Henderson permit portal or contact the City of Henderson Building and Fire Safety directly. The links are listed on this page.

From the Library

What else needs a permit in Henderson

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedItemized as Residential Deck/Patio Enclosure: $326 for the first 200 sq ft from a stand...
Electrical PermitPermit requiredNot specifiedNo single flat electrical fee, charged per component: $190 per service including the fi...
HVAC PermitPermit requiredNot specified$360 to install or relocate a furnace up to 100,000 BTU/hr including ducts, $227 per ad...
Plumbing PermitPermit requiredNot specifiedNo single flat plumbing fee, charged per fixture group: $189 per each 10 fixtures inclu...
Pool PermitPermit requiredNot specified$712 for a residential pool/spa combination plus $772 standard pool plan check;
Roof Replacement PermitPermit requiredNot specifiedNot published
Solar PermitPermit requiredNot specified$700 for a residential photovoltaic system up to 10 kW plus $176 per additional 10 kW o...

Patio Permit in other Nevada localities

Official sources

Verified by a person against the sources above on 2026-07-06, not confirmed with City of Henderson Building and Fire Safety. Rules change; confirm before you build. How we verify.

Last checked: 2026-07-06Report an error on this page

Compare Patio Permit requirements across Nevada localities