Georgia / Cobb County

Patio Permit in Cobb County, Georgia

It depends

Sometimes, depending on the project

Before building a patio that is attached to the house and adds to its footprint

Quick answer

Cobb County requires an Addition Permit for all attached structures that add to the footprint of the home, and its list names patios along with decks, porches, sunrooms and carports. The county's pages do not say whether a patio that is not attached to the house needs a permit. Ask Development and Inspections before you start if your patio is detached.

Typical threshold
a patio attached to the house that adds to the home's footprint needs an Addition Permit; the county's pages do not state a rule for a patio that is not attached to the house
Issued by
Cobb County Community Development Agency, Development and Inspections Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

If a contractor builds your patio, they usually handle any required permit as part of the job. Compare a few bids before you commit.

Compare patio contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a patio permit costs in Cobb County

Fee schedule in force
Official scheduleRead .

Fee follows the small residential construction cost table, $80 base for cost up to $15,000 rising by tier to $450 (or $6 per $1,000 above $75,001), plus a $15 technology fee;

no patio-specific line item, per the 2024 Fee Schedule effective 7/1/2024.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Cobb County

General guide, not specific to this office

What a patio permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a patio permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Cobb County Community Development Agency, Development and Inspections Division

Patio Permit in Cobb County compared with nearby Georgia localities

LocalityPermit needed?ThresholdWhat each Georgia schedule saysVerified
Cobb CountyIt dependsa patio attached to the house that adds to the home's footprint needs an Addition Permit; the county's pages do not state a rule for a patio that is not attached to the houseSee schedule
AtlantaNot confirmedNot confirmedThe general building permit line is $7 per $1,000 of cost of construction with a $150 minimum; the schedule has the rest
DeKalb CountyPermit requiredAny sizeSee schedule
Gwinnett CountyNot confirmedNot confirmedNot published

Permitting activity in Cobb County

In 2025, Cobb County authorized permits for 1,787 new residential housing units (988 single-family, 799 in multi-family buildings), valued at $600M, up from 1,604 the year before. That works out to about 2.3 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 793,345.

What else needs a permit in Cobb County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

None of the 7 project types verified for Cobb County carry a size or scope threshold. See the Permit needed column for each project's own answer, since there is no threshold to compare here.

ProjectPermit needed?Typical fee
Deck PermitPermit requiredDecks are subject to a $100 site plan review fee in addition to the tiered residential building permit fee based on construction cost; the schedule has the rest
Electrical PermitPermit requiredElectrical work is billed as an $80 trade permit under the Cobb County Building Permit Fee Schedule effective July 1, 2024; the schedule has the rest
HVAC PermitPermit requiredHVAC and mechanical work is billed as an $80 trade permit under the Cobb County Building Permit Fee Schedule effective July 1, 2024; the schedule has the rest
Plumbing PermitPermit requiredPlumbing work is billed as an $80 trade permit under the Cobb County Building Permit Fee Schedule effective July 1, 2024; the schedule has the rest
Pool PermitPermit requiredPool permits carry a $250 minimum fee under the Cobb County Building Permit Fee Schedule effective July 1, 2024; the schedule has the rest
Shed PermitPermit requiredSee schedule
Solar PermitPermit requiredSee schedule

Frequently asked questions

Do you need a patio permit in Cobb County?
It depends on the project. A patio attached to the house that adds to the home's footprint needs an Addition Permit; the county's pages do not state a rule for a patio that is not attached to the house. If you are unsure how that applies to your project, call the Cobb County Community Development Agency, Development and Inspections Division at (770) 528-2060 before you start.
How much does a patio permit cost in Cobb County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 11 Nov 2026. For the figure on your own project, call the Cobb County Community Development Agency, Development and Inspections Division at (770) 528-2060.
Where do you apply for a patio permit in Cobb County?
You can apply through the Cobb County permit portal or contact the Cobb County Community Development Agency, Development and Inspections Division directly. The links are listed on this page.
Can a homeowner pull a patio permit themselves in Cobb County?
Under Georgia law (O.C.G.A. 43-41-17(h); O.C.G.A. 43-14-19(d)(1); O.C.G.A. 43-14-17(g) (chapter 43-14 as reenacted by SB 553, effective July 1, 2026)): Georgia's contractor licensing law has a true owner builder exemption at O.C.G.A. 43-41-17(h), not 43-41-17(b). A property owner may construct a building on land the owner owns and act as his or her own contractor, personally providing direct supervision and management, but only if the finished building is intended solely for occupancy by the owner and the owner's family, firm, or corporation, is not for use by the general public, and is not offered for sale or lease. If the owner sold or transferred a self-built structure within the prior 24 months, measured from that structure's certificate of occupancy, the law presumes the new project was not really for personal occupancy and the exemption is unavailable without a license. The owner may not delegate supervision to any unlicensed person, and all work must still comply with county or municipal permitting and inspection requirements. For trade work, O.C.G.A. 43-14-19(d)(1) separately allows an individual to install, alter, or repair plumbing, heating and air conditioning fixtures, and electrical or low-voltage wiring in a residential dwelling the individual owns or occupies, again in conformity with the codes and any local permit and inspection rules. Unlicensed trade work outside these exemptions is a misdemeanor punishable by up to a $1,000 fine or six months imprisonment or both (O.C.G.A. 43-14-17(g), as reenacted by SB 553, effective July 1, 2026). Confirm how Cobb County applies this before you apply.

From the Library

Patio Permit in other Georgia localities

Everything above, sourced

How this patio permit page for Cobb County was verified. 3 official sources: assets.cobbcounty.gov, cobbcounty.gov, assets.cobbcounty.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Cobb County Community Development Agency, Development and Inspections Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project