Deck Permit in Cobb County, Georgia
Permit required
Yes, a permit is required
Before constructing or replacing a deck
Quick answer
The Cobb County Building Permit Fee Schedule explicitly names Decks among the project types subject to its $100 site plan review fee, alongside New Homes, Additions, Pools, and Accessory Structures, confirming that deck construction requires a building permit in unincorporated Cobb County. No exemption threshold for small or low, ground level decks is published by the county.
- Issued by
- Cobb County Community Development Agency, Development and Inspections Division
- Phone
- (770) 528-2060
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
If a contractor builds your deck, they usually handle the permit as part of the job. Compare a few bids before you commit.
Compare deck contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a deck permit costs in Cobb County
- Fee schedule in force
- Official scheduleRead .
Decks are subject to a $100 site plan review fee in addition to the tiered residential building permit fee based on construction cost, per the Cobb County Building Permit Fee Schedule effective July 1, 2024.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Cobb County compares in Georgia
No Georgia jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Atlanta | Permit required | See schedule |
| Cobb Countythis page | Permit required | See schedule |
| DeKalb County | Permit required | See schedule |
| Gwinnett County | Permit required | See schedule |
How to apply in Cobb County
General guide, not specific to this office
What a deck permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a deck permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Cobb County Community Development Agency, Development and Inspections Division
- 1150 Powder Springs St, Ste 400, Marietta, GA 30064
- Phone: (770) 528-2060
- Email: building@cobbcounty.gov
Your Deck Permit checklist for Cobb County
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: assets.cobbcounty.gov: 2024 Fee Schedule Update Final.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Cobb County permit portal.
- Keep the office details handy. Cobb County Community Development Agency, Development and Inspections Division. Phone: (770) 528-2060. Email: building@cobbcounty.gov. Address: 1150 Powder Springs St, Ste 400, Marietta, GA 30064.
Compiled from the official sources on this page. Last checked .
Permitting activity in Cobb County
In 2025, Cobb County authorized permits for 1,787 new residential housing units (988 single-family, 799 in multi-family buildings), valued at $600M, up from 1,604 the year before. That works out to about 2.3 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 793,345.
What else needs a permit in Cobb County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Electrical Permit | Permit required | Any size | Electrical work is billed as an $80 trade permit under the Cobb County Building Permit Fee Schedule effective July 1, 2024; the schedule has the rest |
| HVAC Permit | Permit required | Any size | HVAC and mechanical work is billed as an $80 trade permit under the Cobb County Building Permit Fee Schedule effective July 1, 2024; the schedule has the rest |
| Patio Permit | It depends | a patio attached to the house that adds to the home's footprint needs an Addition Permit; the county's pages do not state a rule for a patio that is not attached to the house | See schedule |
| Plumbing Permit | Permit required | Any size | Plumbing work is billed as an $80 trade permit under the Cobb County Building Permit Fee Schedule effective July 1, 2024; the schedule has the rest |
| Pool Permit | Permit required | Any size | Pool permits carry a $250 minimum fee under the Cobb County Building Permit Fee Schedule effective July 1, 2024; the schedule has the rest |
| Shed Permit | Permit required | Any size | See schedule |
| Solar Permit | Permit required | Any size | See schedule |
Frequently asked questions
- Do you need a deck permit in Cobb County?
- Yes, before constructing or replacing a deck. If you are unsure how that applies to your project, call the Cobb County Community Development Agency, Development and Inspections Division at (770) 528-2060 before you start.
- How much does a deck permit cost in Cobb County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 11 Nov 2026. For the figure on your own project, call the Cobb County Community Development Agency, Development and Inspections Division at (770) 528-2060.
- Where do you apply for a deck permit in Cobb County?
- You can apply through the Cobb County permit portal or contact the Cobb County Community Development Agency, Development and Inspections Division directly. The links are listed on this page.
- Can a homeowner pull a deck permit themselves in Cobb County?
- Under Georgia law (O.C.G.A. 43-41-17(h); O.C.G.A. 43-14-19(d)(1); O.C.G.A. 43-14-17(g) (chapter 43-14 as reenacted by SB 553, effective July 1, 2026)): Georgia's contractor licensing law has a true owner builder exemption at O.C.G.A. 43-41-17(h), not 43-41-17(b). A property owner may construct a building on land the owner owns and act as his or her own contractor, personally providing direct supervision and management, but only if the finished building is intended solely for occupancy by the owner and the owner's family, firm, or corporation, is not for use by the general public, and is not offered for sale or lease. If the owner sold or transferred a self-built structure within the prior 24 months, measured from that structure's certificate of occupancy, the law presumes the new project was not really for personal occupancy and the exemption is unavailable without a license. The owner may not delegate supervision to any unlicensed person, and all work must still comply with county or municipal permitting and inspection requirements. For trade work, O.C.G.A. 43-14-19(d)(1) separately allows an individual to install, alter, or repair plumbing, heating and air conditioning fixtures, and electrical or low-voltage wiring in a residential dwelling the individual owns or occupies, again in conformity with the codes and any local permit and inspection rules. Unlicensed trade work outside these exemptions is a misdemeanor punishable by up to a $1,000 fine or six months imprisonment or both (O.C.G.A. 43-14-17(g), as reenacted by SB 553, effective July 1, 2026). Confirm how Cobb County applies this before you apply.
From the Library
Deck Permit in other Georgia localities
Everything above, sourced
How this deck permit page for Cobb County was verified. 3 official sources: assets.cobbcounty.gov, cobbcounty.gov, assets.cobbcounty.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Cobb County Community Development Agency, Development and Inspections Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page