Deck Permit in DeKalb County, Georgia
Permit required
Yes, a permit is required
Before building or replacing a deck of any size or height. The county's Residential Site Plan Revision form also tells deck applicants to speak with a Zoning Officer before applying at the Permit Intake Counter.
Quick answer
A deck requires a building permit in unincorporated DeKalb County, with no published size or height cutoff. The Residential Additions Permit Guide names decks as work covered by that permit, and Sec. 7-30(a) requires a permit before construction of any building or structure other than ordinary repairs. The county's own exemption list carries no deck item, so the common model code carve out for small low decks does not exist here.
- Issued by
- DeKalb County Department of Planning and Sustainability, Permits, Plan Review and Inspections Division
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
If a contractor builds your deck, they usually handle the permit as part of the job. Compare a few bids before you commit.
Compare deck contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a deck permit costs in DeKalb County
- Fee schedule in force
- Official scheduleRead .
- Published in
- DeKalb Development Services Fee Schedule (Last Update: 6/8/2026), Building Permit Fee Schedule:
- "Minimum Permit Fee: $175 ($20 Technology Fee is Additional)" and "Certificate of Occupancy Fee $50";
- the schedule has no line naming decks.
- The Building Permit Application states the same total: "Total Minimum Fees $245 ($195 Minimum Permit Fee; $50 Certificate of Occupancy or Certificate of Completion)".
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How DeKalb County compares in Georgia
No Georgia jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Atlanta | Permit required | See schedule |
| Cobb County | Permit required | See schedule |
| DeKalb Countythis page | Permit required | See schedule |
| Gwinnett County | Permit required | See schedule |
How to apply in DeKalb County
General guide, not specific to this office
What a deck permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a deck permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
DeKalb County Department of Planning and Sustainability, Permits, Plan Review and Inspections Division
- Government Services Center, 178 Sams Street, Decatur, GA 30030
- Phone: 404-371-2155 (option 3)
- Email: permitinfo@dekalbcountyga.gov
Your Deck Permit checklist for DeKalb County
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: dekalbcountyga.gov: permits plan review and inspections.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the DeKalb County permit portal.
- Keep the office details handy. DeKalb County Department of Planning and Sustainability, Permits, Plan Review and Inspections Division. Phone: 404-371-2155 (option 3). Email: permitinfo@dekalbcountyga.gov. Address: Government Services Center, 178 Sams Street, Decatur, GA 30030.
Compiled from the official sources on this page. Last checked .
Permitting activity in DeKalb County
In 2025, DeKalb County authorized permits for 1,321 new residential housing units (805 single-family, 516 in multi-family buildings), valued at $420M, up from 1,238 the year before. That works out to about 1.7 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 774,394.
What else needs a permit in DeKalb County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Electrical Permit | Permit required | Any size | DeKalb Development Services Fee Schedule (Last Update: 6/8/2026), Electrical Permit: "Minimum Permit Fee: $100 ($20 Technology Fee is additional)" |
| Fence Permit | It depends | height of the fence | See schedule |
| HVAC Permit | Permit required | Any size | DeKalb Development Services Fee Schedule (Last Update: 6/8/2026), HVAC Permits: "Minimum Permit Fee: $100 ($20 Technology Fee is additional)" |
| Patio Permit | Permit required | Any size | See schedule |
| Plumbing Permit | Permit required | Any size | DeKalb Development Services Fee Schedule (Last Update: 6/8/2026), Plumbing Permits: "Minimum Permit Fee: $100 ($20 Technology Fee is additional)" |
| Pool Permit | It depends | prefabricated pools installed entirely above ground | DeKalb Development Services Fee Schedule (Last Update: 6/8/2026), Building Permit Fee Schedule: "Minimum Permit Fee: $175 ($20 Technology Fee is Additional)" |
| Roof Replacement Permit | Permit required | Any size | See schedule |
| Shed Permit | Permit required | Any size | See schedule |
| Solar Permit | Permit required | Any size | DeKalb Development Services Fee Schedule (Last Update: 6/8/2026), Building Permit Fee Schedule: "Minimum Permit Fee: $175 ($20 Technology Fee is Additional)" |
Frequently asked questions
- Do you need a deck permit in DeKalb County?
- Yes, before building or replacing a deck of any size or height. The county's Residential Site Plan Revision form also tells deck applicants to speak with a Zoning Officer before applying at the Permit Intake Counter. If you are unsure how that applies to your project, call the permit office at 404-371-2155 (option 3) before you start.
- How much does a deck permit cost in DeKalb County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 11 Nov 2026. For the figure on your own project, call the permit office at 404-371-2155 (option 3).
- Where do you apply for a deck permit in DeKalb County?
- You can apply through the DeKalb County permit portal or contact the DeKalb County Department of Planning and Sustainability, Permits, Plan Review and Inspections Division directly. The links are listed on this page.
- Can a homeowner pull a deck permit themselves in DeKalb County?
- Under Georgia law (O.C.G.A. 43-41-17(h); O.C.G.A. 43-14-19(d)(1); O.C.G.A. 43-14-17(g) (chapter 43-14 as reenacted by SB 553, effective July 1, 2026)): Georgia's contractor licensing law has a true owner builder exemption at O.C.G.A. 43-41-17(h), not 43-41-17(b). A property owner may construct a building on land the owner owns and act as his or her own contractor, personally providing direct supervision and management, but only if the finished building is intended solely for occupancy by the owner and the owner's family, firm, or corporation, is not for use by the general public, and is not offered for sale or lease. If the owner sold or transferred a self-built structure within the prior 24 months, measured from that structure's certificate of occupancy, the law presumes the new project was not really for personal occupancy and the exemption is unavailable without a license. The owner may not delegate supervision to any unlicensed person, and all work must still comply with county or municipal permitting and inspection requirements. For trade work, O.C.G.A. 43-14-19(d)(1) separately allows an individual to install, alter, or repair plumbing, heating and air conditioning fixtures, and electrical or low-voltage wiring in a residential dwelling the individual owns or occupies, again in conformity with the codes and any local permit and inspection rules. Unlicensed trade work outside these exemptions is a misdemeanor punishable by up to a $1,000 fine or six months imprisonment or both (O.C.G.A. 43-14-17(g), as reenacted by SB 553, effective July 1, 2026). Confirm how DeKalb County applies this before you apply.
From the Library
Deck Permit in other Georgia localities
Everything above, sourced
How this deck permit page for DeKalb County was verified. 2 official sources: dekalbcountyga.gov, dekalbcountyga.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with DeKalb County Department of Planning and Sustainability, Permits, Plan Review and Inspections Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page