Do you need a deck permit in Georgia?
In Georgia, all 4 counties and cities we checked agree: they require a deck permit for every job.
- Always required
- 4
- among 4 jurisdictions
- Conditional
- 0
- by size or scope
- Not required
- 0
- exempt outright
What a deck permit application usually includes, and which inspections usually follow, is explained once, in a general guide that is not specific to any state: how a deck permit works, from application to final inspection. Below is what differs from one jurisdiction to the next: who requires a permit, what they charge, and which office you file with.
Swipe sideways to see thresholds and confidence.
| Locality | Permit required? | Typical threshold | Confidence |
|---|---|---|---|
| Atlanta | Yes | Any size | Confirmed on official page |
| Cobb County | Yes | Any size | Confirmed on official page |
| DeKalb County | Yes | Any size | Confirmed on official page |
| Gwinnett County | Yes | Any size | Confirmed on official page |
| No localities match your filter. | |||
What a deck permit costs in Georgia
4 Georgia jurisdictions we cover publish a fee figure for this work. Each line is quoted from that office's own schedule and linked to its citation. The figures are not comparable to one another: some are flat minimums, some a percentage of job value, some charged per fixture, so what you pay depends on which schedule applies and on your job's valuation.
Per the City of Atlanta's "Getting started" fee tables (a baseline reference; the binding figures are in Appendix B of the City Code), read 2026-11-18: The building permit is $7 per $1,000 of cost of construction with a $150 minimum, and the city's valuation addendum values a one or two family deck, balcony or porch at $35 per square foot. Every permit also pays a $25 technology fee. Atlanta moves from Accela to a new permit system, ATL OPAL, on December 21, 2026, so recheck these figures after that date.
last checked
Decks are subject to a $100 site plan review fee in addition to the tiered residential building permit fee based on construction cost, per the Cobb County Building Permit Fee Schedule effective July 1, 2024.
last checked
DeKalb Development Services Fee Schedule (Last Update: 6/8/2026), Building Permit Fee Schedule: "Minimum Permit Fee: $175 ($20 Technology Fee is Additional)" and "Certificate of Occupancy Fee $50"; the schedule has no line naming decks. The Building Permit Application states the same total: "Total Minimum Fees $245 ($195 Minimum Permit Fee; $50 Certificate of Occupancy or Certificate of Completion)".
last checked
Planning and Development Fee Schedule, "Building Permit Fees (Effective August 25, 2026)". The schedule has no line naming decks. Its Other Building Permit Fees are $125 for a Residential Renovation Permit on Minor Renovation Projects (valued less than $75,000) and $4 per $1,000 of construction value on Extensive Renovation Projects (valued at $75,000 or greater); it does not say whether a deck addition is priced as a renovation. The department's Deck Additions handout still states "$6 per $1,000 of estimated construction cost (minimum fee is $30), plus a $25 Certificate of Completion fee". Confirm the amount with the Permits Section at 678-518-6020.
last checked
Jurisdictions not listed publish no dollar figure we could quote. Absence does not mean a permit is free.
Common questions about deck permits in Georgia
- Do I need a deck permit in Georgia?
- In most of Georgia, yes. Of the 4 Georgia jurisdictions we have verified for deck work, all 4 require a permit outright.
Ready to move on your deck permit?
Hire it out
Sponsored
If a contractor builds your deck, they usually handle the permit as part of the job. Compare a few bids before you commit.
Compare deck contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.