Building permits in Gwinnett County, Georgia
Of the 9 common home projects we have verified in Gwinnett County, 3 need a permit outright and 6 depend on size or scope. Click any project for the full rule, fee, and how to apply.
- Project types verified
- 9of 10 we cover in Gwinnett County
Look up a permit in Gwinnett County
Gwinnett County permit records are public, and you can check a property's permit history by address or permit number online.
How to get a building permit in Gwinnett County
Gwinnett County’s Department of Planning and Development reviews plans, issues building permits and inspects residential construction, from additions and decks to accessory buildings and trade work. Applications and inspection requests all go through the county’s ZIP Portal (Zoning, Inspections, and Permitting), and the permit is issued once plan review is done, fees are paid and contractor information is in.
Where the office is and when it is open
Planning and Development is at Innovation Square, 446 West Crogan Street, Suite 300, Lawrenceville, GA 30046, open Monday to Friday, 8:00am to 5:00pm and closed weekends and holidays. Call 678.518.6000. Questions about a single-family house or townhome permit go to P&D-BuildingPermits@GwinnettCounty.com; inspection questions to P&D-BuildingInspections@GwinnettCounty.com.
Applying online in Gwinnett County
- Log in or register in the ZIP Portal and start a residential building application; the building services page links a short video on applying for an accessory structure permit.
- Doing the work yourself? A homeowner can hold the permit with proof of ownership and a signed Property Owner as Contractor Affidavit. On it you declare the building is for you and your family, not the general public, and that you have not been owner-contractor on a property you sold within the past 24 months. Any licensed trade subcontractor you hire files their own subcontractor affidavit.
- Draw the location plan to scale (1”=10’ or 1”=20’), showing lot lines, the house and driveway, easements, streams and buffers. The county’s step sheets for decks, accessory buildings and pools ask for it, and for Environmental Health approval of the location first if the home is on a septic system.
- Add the Erosion Control & Solid Waste Management Affidavit, and for a pool the Residential Swimming Pool Construction Affidavit.
- After plan review, pay the fees in the portal; the permit is issued to the contractor of record (you, if you are owner-contractor).
The step sheets are dated “Revised August 2012” and describe paying at a counter; the county now takes applications through the ZIP Portal.
What five common projects cost here
From the Planning and Development Fee Schedule, Building Permit Fees effective August 25, 2026. Its fees include plan review and building inspections. It has no line naming decks, electrical work, sheds, roofs or pools, so for each project the line that fits is shown, with what the older step sheet says; confirm the line with the Permits Section at 678.518.6000 before budgeting.
- Deck: the schedule’s Residential Renovation Permit is $125 for projects valued less than $75,000, and $4 per $1,000 of construction value at $75,000 or more; it does not say whether a deck is priced as a renovation. The 2012 deck sheet still says $6 per $1,000 of estimated cost (minimum fee is $30). A deck needs a Certificate of Completion before use: $50 on the current schedule. Read 11 Nov 2026.
- Electrical: no electrical line. The county’s undated Regulatory Requirements for Residential Permits handout lists mechanical, electrical and plumbing permits at $0.006 x Value of Construction Amount. Read 11 Nov 2026.
- Shed: none for a storage building of 120 square feet or less. Larger ones have no accessory line; the New Construction rate is $4 per $1,000 of estimated cost from ICC valuation data, updated each January 1 to the current ICC chart, and the accessory building sheet still prints $6 per $1,000 (minimum fee is $30); it also requires a Certificate of Occupancy, $50 on the current schedule. Read 11 Nov 2026.
- Roof replacement: no roofing line; the renovation lines are $125 under $75,000 and $4 per $1,000 at $75,000 or more. Read 11 Nov 2026.
- Pool: no pool line; the 2012 pool sheet says $6 per $1,000 of estimated cost (minimum fee is $30), plus $25 for the Certificate of Occupancy, which the current schedule prices at $50. Read 11 Nov 2026.
Solar panel and EV charger installations get a 5% building permit fee reduction.
How long review takes
Gwinnett’s building pages give no review time; watch the record in the ZIP Portal. A resubmittal after the third review, before issuance, costs 25% of the total building permit fee, so answer review comments completely.
Inspections, in order
Request inspections in the ZIP Portal with your permit case number (it looks like RESBLD2022-00001). For a deck, the county’s sheet sets the order: footing and electrical rough-in must pass before you schedule the final, and the deck cannot be used until the final passes and you have a Certificate of Completion. Post the yard card where it is visible from the street and keep the approved location plan on site.
The first follow-up inspection is free; the second costs $50, the third and each one after $100. Under the county’s Construction Code (Second Edition, October 16, 2018), a permit expires when work does not start within 180 days of issuance, or stops for 180 days, without a passed inspection; an extension is $25 and renewing an expired permit $50, and the expired-permit fee is 25% of the total building permit fee where rough inspections are complete, 50% where they are partial.
What needs no permit in Gwinnett County
The building services page lists:
- Replacing a switch, fan or light fixture without altering the mechanical, electrical or plumbing systems.
- Painting, new flooring, cabinets, vinyl siding and similar finish work.
- Storage buildings of 120 square feet or less.
- Concrete driveways, sidewalks and basketball slabs covering no more than 35% of the front yard.
- Fences of 8 feet or less (ask Planning and Development about brick columns or front-yard fences).
The Construction Code adds retaining walls up to 4 feet without a surcharge, and prefabricated above-ground pools under 24 inches deep holding no more than 5,000 gallons.
If the work already started
The fee schedule’s penalty for construction prior to issuance of a permit is 100% of the permit fee, charged on top of it. What Georgia law says about building without a permit.
Checklist before you apply
- A ZIP Portal account.
- Proof of ownership and the Property Owner as Contractor Affidavit, if you are your own contractor.
- A scaled location plan showing the building in the rear yard and its setbacks: 5 ft for up to 120 square feet, 10 ft up to 300, 15 ft up to 500, 20 ft over 500.
- Environmental Health approval if you are on septic.
- The Erosion Control & Solid Waste Management Affidavit.
- Your estimated construction cost.
- A call to 678.518.6000 to confirm which fee line applies.
Gwinnett County documents read for this guide
- Office page: Building Services, read
- Fee schedule: Planning and Development Fee Schedule (Building Permit Fees effective August 25, 2026), read
- Application: Property Owner as Contractor Affidavit Form, read
- Office page: Accessory Buildings (Residential) Building Permit Requirements, read
- Office page: Deck Additions to a Home: Building Permit Requirements (Revised August 2012), read
- Office page: Swimming Pool (Residential) Building Permit Requirements (Revised August 2012), read
- Fee schedule: Regulatory Requirements for Residential Permits, read
- Inspections: Gwinnett County Construction Code (Second Edition, October 16, 2018), read
What needs a permit in Gwinnett County
Planning and Development Fee Schedule, "Building Permit Fees (Effective August 25, 2026)", for every permit type below. The fee column shows what differs by project.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Any size | See schedule |
| Electrical Permit | It depends | Before erecting, installing, enlarging, altering, repairing, removing, converting or... | See schedule |
| Fence Permit | It depends | height of a fence; masonry and concrete fence walls follow a separate 4 foot limit | See schedule |
| HVAC Permit | It depends | Before installing, altering, repairing, removing, converting or replacing a fixed... | See schedule |
| Patio Permit | Not confirmed | Not confirmed | Not published |
| Plumbing Permit | It depends | Before installing, altering, repairing, removing, converting or replacing a plumbing... | See schedule |
| Pool Permit | It depends | prefabricated pools installed entirely above ground that also hold no more than 5,000 gallons | See schedule |
| Roof Replacement Permit | Permit required | Any size | See schedule |
| Shed Permit | It depends | floor area of a one-story detached accessory structure that contains no electrical or plumbing system | See schedule |
| Solar Permit | Permit required | Any size | See schedule |
Planning a project in Gwinnett County?
Hire it out
Sponsored
Licensed contractors usually pull the permit as part of the job. Comparing a few local quotes before you commit is the useful next step.
Compare local contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
Planning several things at once? Check your whole project
Gwinnett County permit fees compared with nearby Georgia localities
| Georgia locality | Deck Permit | HVAC Permit | Electrical Permit |
|---|---|---|---|
| Gwinnett County | See schedule | See schedule | See schedule |
| Atlanta | See schedule | See schedule | See schedule |
| Cobb County | See schedule | See schedule | See schedule |
| DeKalb County | See schedule | See schedule | See schedule |
Each cell is taken from that Georgia jurisdiction's own fee schedule; the full wording and source sit on each permit page.
Gwinnett County penalty for work started without a permit
Gwinnett County publishes what it charges when work begins before the permit, quoted here from the schedule or permit page we verified.
-
The schedule also states "Building permit fees include Plan Review and Building Inspections" and prices reinspections at "First Follow-up Inspection $0", "Second Follow-up Inspection $50", "Third and each Subsequent Follow-up Inspection $100", with "Penalty for Construction Prior to Issuance of Permit 100% of the Permit Fee".
Gwinnett County deck permit page · last checked
The Georgia statute, the after-the-fact permit path and who may pull the permit: building without a permit in Georgia.
Gwinnett County permit questions, answered from the data
- Do you need a permit in Gwinnett County?
- It depends on the project. Of the 10 permit types we cover in Gwinnett County, 3 always require a permit (for example a deck permit) and 6 depend on size or scope (an electrical permit, for instance), and 1 is not confirmed. Each Gwinnett County permit type's page states the exact rule and its source.
- How much does a permit cost in Gwinnett County?
- Gwinnett County publishes a fee for 9 of the 10 permit types we cover, each quoted on its page from the jurisdiction's own schedule (linked on every page that carries one). Fees are set by Gwinnett County Department of Planning and Development, Building Division; we do not estimate or mark them up.
- Where do you apply for a permit in Gwinnett County?
- Gwinnett County Department of Planning and Development, Building Division issues permits in Gwinnett County and has an online permit portal, and takes questions at 678-518-6020. The Gwinnett County official page and portal are linked in the office section above.
- What is the penalty for building without a permit in Gwinnett County?
- Gwinnett County publishes its own charge for work started before the permit: The schedule also states "Building permit fees include Plan Review and Building Inspections" and prices reinspections at "First Follow-up Inspection $0", "Second Follow-up Inspection $50", "Third and each Subsequent Follow-up Inspection $100", with "Penalty for Construction Prior to Issuance of Permit 100% of the Permit Fee". That is the local bill; the Georgia statute, the after-the-fact permit path and who may pull the permit are on the Georgia building-without-a-permit page.
How the Gwinnett County pages were verified. 10 permit types, 5 distinct official sources, most recently checked . Every rule is read from Gwinnett County Department of Planning and Development, Building Division or the applicable code and cited on its page; anything we could not confirm for Gwinnett County is marked rather than estimated. How we verify.
Permitting activity in Gwinnett County
In 2025, Gwinnett County authorized permits for 3,946 new residential housing units (2,950 single-family, 996 in multi-family buildings), valued at $1.1B , down from 5,603 the year before. That works out to about 3.9 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 1,018,099.