Georgia / Cobb County

Shed Permit in Cobb County, Georgia

Permit required

Yes, a permit is required

Before constructing any accessory structure such as a shed

Confirmed on official page Verified

Issued byCobb County Community Development Agency, Development and Inspections Division

By Mario Bailey, verified against official sources

Quick answer

Cobb County's Community Development Agency lists Accessory Structures, which include sheds, as one of its residential permit checklist categories, and the county's Building Permit Fee Schedule names Accessory Structures among the project types subject to its $100 site plan review fee. No square footage or height exemption for small sheds is published by the county. Georgia's state minimum code deleted the IRC administrative chapter that would otherwise set such a threshold, so no statewide exemption applies either. Homeowners should contact Development and Inspections to confirm whether a specific shed qualifies for any exemption.

Who is pulling this permit?

Hire it out

Sponsored

If a contractor builds or places your shed, they usually handle any required permit. Compare a few bids before you commit.

Compare contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

When a permit is usually needed

Before constructing any accessory structure such as a shed

What a shed permit costs in Cobb County

Line item
shed permitBy formulaAccessory structures are subject to a $100 site plan review fee in addition to the tiered residential building permit fee based on construction cost, per the Cobb County Building Permit Fee Schedule effective July 1, 2024.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Cobb County compares in Georgia

No Georgia jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
AtlantaPermit requiredNot published
Cobb Countythis pagePermit requiredAccessory structures are subject to a $100 site plan review fee in addition to...
DeKalb CountyPermit required...Permit Application (revised 01/01/2025): "Total Minimum Fees $245 ($195...
Gwinnett CountyIt depends...Requirements for Residential Permits" still prices this work at "$0.006 x...

How to apply in Cobb County

In Cobb County, a residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.

What most shed permit applications include:

  • For Cobb County, a written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
  • For Cobb County, a scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
  • Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
  • Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
  • Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).

General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. Cobb County Community Development Agency, Development and Inspections Division sets the exact checklist for Cobb County.

Where to apply in Cobb County:

Cobb County Community Development Agency, Development and Inspections Division

Shed Permit in Cobb County compared with nearby Georgia localities

LocalityPermit needed?ThresholdWhat each Georgia schedule saysVerified
Cobb CountyPermit requiredAny sizeAccessory structures are subject to a $100 site plan review fee in addition to the...
AtlantaPermit requiredAny sizeNot published
DeKalb CountyPermit requiredAny sizeBuilding Permit Application (revised 01/01/2025): "Total Minimum Fees $245 ($195 Minimum...
Gwinnett CountyIt dependsfloor area of a one-story detached accessory structure that contains no electrical or plumbing system..."Regulatory Requirements for Residential Permits" still prices this work at "$0.006...

Inspections and closing out your permit

In Cobb County, a permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.

  1. Foundation or anchor inspection in Cobb County: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
  2. Frame inspection in Cobb County: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
  3. Final inspection in Cobb County: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
  4. In Cobb County: for a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Cobb County permit portal or by phone at (770) 528-2060.

Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a shed permit in Cobb County?
Cobb County's Community Development Agency lists Accessory Structures, which include sheds, as one of its residential permit checklist categories, and the county's Building Permit Fee Schedule names Accessory Structures among the project types subject to its $100 site plan review fee. No square footage or height exemption for small sheds is published by the county. Georgia's state minimum code deleted the IRC administrative chapter that would otherwise set such a threshold, so no statewide exemption applies either. Homeowners should contact Development and Inspections to confirm whether a specific shed qualifies for any exemption. Always confirm with the Cobb County Community Development Agency, Development and Inspections Division before starting.
How much does a shed permit cost in Cobb County?
Accessory structures are subject to a $100 site plan review fee in addition to the tiered residential building permit fee based on construction cost, per the Cobb County Building Permit Fee Schedule effective July 1, 2024. See the official fee schedule for current amounts.
Where do you apply for a shed permit in Cobb County?
You can apply through the Cobb County permit portal or contact the Cobb County Community Development Agency, Development and Inspections Division directly. The links are listed on this page.
Can a homeowner pull a shed permit themselves in Cobb County?
Under Georgia law (O.C.G.A. 43-41-17(h); O.C.G.A. 43-14-13(d); O.C.G.A. 43-14-14): Georgia's contractor licensing law has a true owner builder exemption at O.C.G.A. 43-41-17(h), not 43-41-17(b). A property owner may construct a building on land the owner owns and act as his or her own contractor, personally providing direct supervision and management, but only if the finished building is intended solely for occupancy by the owner and the owner's family, firm, or corporation, is not for use by the general public, and is not offered for sale or lease. If the owner sold or transferred a self-built structure within the prior 24 months, measured from that structure's certificate of occupancy, the law presumes the new project was not really for personal occupancy and the exemption is unavailable without a license. The owner may not delegate supervision to any unlicensed person, and all work must still comply with county or municipal permitting and inspection requirements. For trade work, O.C.G.A. 43-14-13(d) separately allows an individual to install, alter, or repair plumbing, heating and air conditioning fixtures, and electrical or low-voltage wiring in a residential dwelling the individual owns or occupies, again in conformity with the codes and any local permit and inspection rules. Unlicensed trade work outside these exemptions is a misdemeanor punishable by up to a $1,000 fine or six months imprisonment or both (O.C.G.A. 43-14-14). Confirm how Cobb County applies this before you apply.

From the Library

What else needs a permit in Cobb County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

None of the 6 project types verified for Cobb County carry a size or scope threshold. See the Permit needed column for each project's own answer, since there is no threshold to compare here.

ProjectPermit needed?Typical fee
Deck PermitPermit requiredDecks are subject to a $100 site plan review fee in addition to the tiered residential...
Electrical PermitPermit requiredElectrical work is billed as an $80 trade permit under the Cobb County Building Permit...
HVAC PermitPermit requiredHVAC and mechanical work is billed as an $80 trade permit under the Cobb County Building...
Plumbing PermitPermit requiredPlumbing work is billed as an $80 trade permit under the Cobb County Building Permit Fee...
Pool PermitPermit requiredPool permits carry a $250 minimum fee under the Cobb County Building Permit Fee Schedule...
Solar PermitPermit requiredFee follows the small residential construction cost table, $80 base for cost up to...

Shed Permit in other Georgia localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Cobb County documents; the office above sets the local rules.

How this shed permit page for Cobb County was verified. 2 official sources: cobbcounty.gov, assets.cobbcounty.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Cobb County Community Development Agency, Development and Inspections Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page