Solar Permit in Cobb County, Georgia
Permit required
Yes, a permit is required
Before installing a residential solar panel system
Quick answer
Cobb County's Residential Permitting checklist page lists Solar Panels as one of its own residential permit categories, confirming that a permit is required for residential solar installations in unincorporated Cobb County. No county page publishes a size, wattage, or roof area exemption for small solar systems.
- Issued by
- Cobb County Community Development Agency, Development and Inspections Division
- Phone
- (770) 528-2060
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
Georgia's owner-builder rule (O.C.G.A. 43-41-17(h); O.C.G.A. 43-14-19(d)(1); O.C.G.A. 43-14-17(g) (chapter 43-14 as reenacted by SB 553, effective July 1, 2026)) sets what you may do on your own home without hiring anyone. Read the statute.
What a solar permit costs in Cobb County
- Fee schedule in force
- Official scheduleRead .
Fee follows the small residential construction cost table, $80 base for cost up to $15,000 rising by tier to $450 (or $6 per $1,000 above $75,001), plus a $15 technology fee;
the solar application requires a cost estimate and no separate solar fee line exists, per the 2024 Fee Schedule effective 7/1/2024.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Cobb County compares in Georgia
No Georgia jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Atlanta | Permit required | Solar wiring is an electrical permit with a $150 base fee and, as printed, a $75 minimum |
| Cobb Countythis page | Permit required | See schedule |
| DeKalb County | Permit required | See schedule |
| Gwinnett County | Permit required | See schedule |
How to apply in Cobb County
General guide, not specific to this office
What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Cobb County Community Development Agency, Development and Inspections Division
- 1150 Powder Springs St, Ste 400, Marietta, GA 30064
- Phone: (770) 528-2060
- Email: building@cobbcounty.gov
Your Solar Permit checklist for Cobb County
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: cobbcounty.gov: residential permitting.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Cobb County permit portal.
- Keep the office details handy. Cobb County Community Development Agency, Development and Inspections Division. Phone: (770) 528-2060. Email: building@cobbcounty.gov. Address: 1150 Powder Springs St, Ste 400, Marietta, GA 30064.
Compiled from the official sources on this page. Last checked .
Permitting activity in Cobb County
In 2025, Cobb County authorized permits for 1,787 new residential housing units (988 single-family, 799 in multi-family buildings), valued at $600M, up from 1,604 the year before. That works out to about 2.3 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 793,345.
What else needs a permit in Cobb County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Any size | Decks are subject to a $100 site plan review fee in addition to the tiered residential building permit fee based on construction cost; the schedule has the rest |
| Electrical Permit | Permit required | Any size | Electrical work is billed as an $80 trade permit under the Cobb County Building Permit Fee Schedule effective July 1, 2024; the schedule has the rest |
| HVAC Permit | Permit required | Any size | HVAC and mechanical work is billed as an $80 trade permit under the Cobb County Building Permit Fee Schedule effective July 1, 2024; the schedule has the rest |
| Patio Permit | It depends | a patio attached to the house that adds to the home's footprint needs an Addition Permit; the county's pages do not state a rule for a patio that is not attached to the house | See schedule |
| Plumbing Permit | Permit required | Any size | Plumbing work is billed as an $80 trade permit under the Cobb County Building Permit Fee Schedule effective July 1, 2024; the schedule has the rest |
| Pool Permit | Permit required | Any size | Pool permits carry a $250 minimum fee under the Cobb County Building Permit Fee Schedule effective July 1, 2024; the schedule has the rest |
| Shed Permit | Permit required | Any size | See schedule |
Frequently asked questions
- Do you need a solar permit in Cobb County?
- Yes, before installing a residential solar panel system. If you are unsure how that applies to your project, call the Cobb County Community Development Agency, Development and Inspections Division at (770) 528-2060 before you start.
- How much does a solar permit cost in Cobb County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 11 Nov 2026. For the figure on your own project, call the Cobb County Community Development Agency, Development and Inspections Division at (770) 528-2060.
- Where do you apply for a solar permit in Cobb County?
- You can apply through the Cobb County permit portal or contact the Cobb County Community Development Agency, Development and Inspections Division directly. The links are listed on this page.
- Can a homeowner pull a solar permit themselves in Cobb County?
- Under Georgia law (O.C.G.A. 43-41-17(h); O.C.G.A. 43-14-19(d)(1); O.C.G.A. 43-14-17(g) (chapter 43-14 as reenacted by SB 553, effective July 1, 2026)): Georgia's contractor licensing law has a true owner builder exemption at O.C.G.A. 43-41-17(h), not 43-41-17(b). A property owner may construct a building on land the owner owns and act as his or her own contractor, personally providing direct supervision and management, but only if the finished building is intended solely for occupancy by the owner and the owner's family, firm, or corporation, is not for use by the general public, and is not offered for sale or lease. If the owner sold or transferred a self-built structure within the prior 24 months, measured from that structure's certificate of occupancy, the law presumes the new project was not really for personal occupancy and the exemption is unavailable without a license. The owner may not delegate supervision to any unlicensed person, and all work must still comply with county or municipal permitting and inspection requirements. For trade work, O.C.G.A. 43-14-19(d)(1) separately allows an individual to install, alter, or repair plumbing, heating and air conditioning fixtures, and electrical or low-voltage wiring in a residential dwelling the individual owns or occupies, again in conformity with the codes and any local permit and inspection rules. Unlicensed trade work outside these exemptions is a misdemeanor punishable by up to a $1,000 fine or six months imprisonment or both (O.C.G.A. 43-14-17(g), as reenacted by SB 553, effective July 1, 2026). Confirm how Cobb County applies this before you apply.
From the Library
Solar Permit in other Georgia localities
Everything above, sourced
How this solar permit page for Cobb County was verified. 3 official sources: cobbcounty.gov, assets.cobbcounty.gov, assets.cobbcounty.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Cobb County Community Development Agency, Development and Inspections Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page