Pool Permit in Cobb County, Georgia
By Mario Bailey Last checked 2026-07-06 · 3 official sources
Verified against official sources Confirmed on official pagePermit required
Quick answer
Cobb County states directly that all in-ground and above-ground pools in unincorporated Cobb County are required to be permitted and inspected, with no exemption for small or prefabricated pools. As of January 2026, pool contractors must hold a valid Georgia General Contractor's License or a recognized pool builder certification such as the Certified Pool Builder credential. Permit packages, including a signed Pool and Barrier Application and a notarized Pool and Spa Code Contractor Affidavit, are submitted by email to PoolPermits@cobbcounty.gov.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help
Tell us where your project stands. Free to ask; no obligation.
Where we have a vetted local pro who handles permits in Cobb County, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.
When a permit is usually needed
Before constructing any in-ground or above-ground residential pool or spa
What pool permit costs in Cobb County
Pool permits carry a $250 minimum fee under the Cobb County Building Permit Fee Schedule effective July 1, 2024, plus the $100 site plan review fee and $15 technology fee that apply across permit types.
How to apply in Cobb County
A residential pool permit application covers both construction and safety: a scaled site plan, structural plans for the pool, a barrier plan showing how the pool will be enclosed, and an electrical plan covering bonding and the equipment disconnect.
What most pool permit applications include:
- Pool and spa design and construction fall under the residential code chapter that folds in the swimming pool and spa code, and permit review checks plans against that chapter (IRC R326).
- The site plan must show pool equipment such as pumps, filters, and heaters set back at least 36 inches from the outside of the required barrier (ISPSC 305.2.9).
- For an in-ground pool, engineered structural plans covering the shell and reinforcing steel, with the responsible structural engineer's license information, are a standard part of the submittal (per official pool submittal checklists).
- A barrier plan identifying the fence, pool structure, or dwelling wall that will enclose the pool must be submitted and must comply with the code's barrier chapter (ISPSC 305).
- Electrical plans must show the pool's equipotential bonding design, since the shell, perimeter surfaces, and metal fittings within 5 feet of the water must all tie into a common bonding grid (NEC 680.26).
- The electrical plan must also show a disconnecting means for the pool equipment that is readily accessible and within sight of the equipment (NEC 680.13).
General submittal guidance from 2021 IRC R326 (adopting the ISPSC), ISPSC 2021 Section 305, and NEC 2020 Article 680. Source. Cobb County Community Development Agency, Development and Inspections Division sets the exact checklist for Cobb County.
Where to apply in Cobb County:
Cobb County Community Development Agency, Development and Inspections Division
- 1150 Powder Springs St, Ste 400, Marietta, GA 30064
- Phone: (770) 528-2060
- Email: building@cobbcounty.gov
Inspections and closing out your permit
Pool inspections track the concrete pour: the steel and bonding grid are checked before gunite or shotcrete goes in, bonding is checked again before decking is poured, and the permanent barrier and remaining electrical work are checked at final before the pool can be filled and used.
- Before gunite or shotcrete is sprayed, the inspector checks the rebar against the engineered plans and confirms the equipotential bonding wire is stubbed out and tied into the steel, since it will be buried in concrete afterward (NEC 680.26).
- A bonding inspection separately confirms coping, decking, ladders, handrail cups, and any other metal within 5 feet of the water are tied to the bonding grid, and it must pass before coping is installed (NEC 680.26).
- A temporary barrier at least 4 feet high must enclose the site from the moment excavation starts until the permanent barrier is finished, and inspectors check for it throughout construction (ISPSC 305.1.1).
- A pre-plaster inspection confirms the circulation equipment's electrical work is installed and all bonding is complete before the pool's interior finish goes on (NEC 680.26).
- At final inspection the permanent barrier is checked against the code's requirements and the equipment and cover-mechanism bonding must be complete before the pool can be filled and used (ISPSC 305, NEC 680.26).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Cobb County permit portal or by phone at (770) 528-2060.
Inspection sequence from NEC 2020 Article 680.26 (equipotential bonding) and ISPSC 2021 Section 305 (barriers). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Pool Permit checklist for Cobb County
- Confirm the requirement. Yes, a permit is required. Usually needed: Before constructing any in-ground or above-ground residential pool or spa.
- Budget the fee. Pool permits carry a $250 minimum fee under the Cobb County Building Permit Fee Schedule effective July 1, 2024, plus the $100 site plan review fee and $15 technology fee that apply across permit types. Official fee schedule.
- Apply. A residential pool permit application covers both construction and safety: a scaled site plan, structural plans for the pool, a barrier plan showing how the pool will be enclosed, and an electrical plan covering bonding and the equipment disconnect. Start at the Cobb County permit portal.
- Keep the office details handy. Cobb County Community Development Agency, Development and Inspections Division. Phone: (770) 528-2060. Address: 1150 Powder Springs St, Ste 400, Marietta, GA 30064.
- Plan for inspections. Pool inspections track the concrete pour: the steel and bonding grid are checked before gunite or shotcrete goes in, bonding is checked again before decking is poured, and the permanent barrier and remaining electrical work are checked at final before the pool can be filled and used.
Compiled from the official sources on this page. Last checked 2026-07-06.
The checklist stays on this page either way. We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.
Frequently asked questions
- Do you need a pool permit in Cobb County?
- Cobb County states directly that all in-ground and above-ground pools in unincorporated Cobb County are required to be permitted and inspected, with no exemption for small or prefabricated pools. As of January 2026, pool contractors must hold a valid Georgia General Contractor's License or a recognized pool builder certification such as the Certified Pool Builder credential. Permit packages, including a signed Pool and Barrier Application and a notarized Pool and Spa Code Contractor Affidavit, are submitted by email to PoolPermits@cobbcounty.gov. Always confirm with the Cobb County Community Development Agency, Development and Inspections Division before starting.
- How much does a pool permit cost in Cobb County?
- Pool permits carry a $250 minimum fee under the Cobb County Building Permit Fee Schedule effective July 1, 2024, plus the $100 site plan review fee and $15 technology fee that apply across permit types. See the official fee schedule for current amounts.
- Where do you apply for a pool permit in Cobb County?
- You can apply through the Cobb County permit portal or contact the Cobb County Community Development Agency, Development and Inspections Division directly. The links are listed on this page.
From the Library
What else needs a permit in Cobb County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Not specified | Decks are subject to a $100 site plan review fee in addition to the tiered residential... |
| Electrical Permit | Permit required | Not specified | Electrical work is billed as an $80 trade permit under the Cobb County Building Permit... |
| HVAC Permit | Permit required | Not specified | HVAC and mechanical work is billed as an $80 trade permit under the Cobb County Buildin... |
| Plumbing Permit | Permit required | Not specified | Plumbing work is billed as an $80 trade permit under the Cobb County Building Permit Fe... |
| Shed Permit | Permit required | Not specified | Accessory structures are subject to a $100 site plan review fee in addition to the tier... |
| Solar Permit | Permit required | Not specified | Fee follows the small residential construction cost table, $80 base for cost up to $15,... |
Pool Permit in other Georgia localities
Official sources
- https://www.cobbcounty.gov/community-development/building-development/pool-spa-inspections
- https://assets.cobbcounty.gov/files/2026-01/POOL_PERMITS_CHECKLIST_RESIDENTIAL_01-2026.pdf
- https://assets.cobbcounty.gov/files/2024-06/2024%20Fee%20Schedule%20Update_Final.pdf
- https://www.bountifulutah.gov/file/ee478521-f791-4cee-a755-2d923ff70257
Verified by a person against the sources above on 2026-07-06, not confirmed with Cobb County Community Development Agency, Development and Inspections Division. Rules change; confirm before you build. How we verify.
Last checked: 2026-07-06Report an error on this page
Permit office
Cobb County Community Development Agency, Development and Inspections Division
(770) 528-2060Permit portalCompare
Pool Permit across Georgia