Patio Permit in Burlington, Vermont
Permit required
Yes, a permit is required
Any new patio needs a zoning permit.
Quick answer
Burlington names patios expressly: CDO Sec. 3.1.2(a) requires a zoning permit for "Porches, patios, and decks", covered or not, and the same list adds new or expanded walkways and paving. The city publishes no patio-specific building-permit rule, but its building-permit exceptions (carpeting, painting, nonsolid fences, storm doors and windows, in-kind repairs of $1,000.00 or less) do not include patios.
- Issued by
- City of Burlington Department of Permitting and Inspections (DPI)
- Phone
- 802-863-0442
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
If a contractor builds your patio, they usually handle any required permit as part of the job. Compare a few bids before you commit.
Compare patio contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a patio permit costs in Burlington
- Fee schedule in force
- Official scheduleRead .
- Published in
- Zoning permit, FY2027 Fee Schedule (effective July 1, 2026):
- "Basic Zoning Permit (non-design control RL)", "Fence Permit" and "Certificate of Appropriateness Level I (COA I)" (projects under $29,000 estimated construction cost) are "$15 filing fee +" "$107";
- COA Level II (estimated construction cost of $29,000 or more) is $15 filing fee + $140 + $2.20 per $1,000 of ECC, plus a Development Review Fee of $4.50 per $1,000 of ECC. A building permit may also apply under the all-work rule: Building permit: Burlington Code of Ordinances (BCO) Sec. 8-28(a), "$8.50 per $1,000.00" of Estimated Cost of Construction "with a minimum permit fee of thirty ($30.00) dollars" (Permit Applications and Forms page; the code text as published online still sets the minimum at $20.00).
- When the building inspector has to enforce and a permit is required as a result, BCO 8-28(f) adds a processing fee of $30.00 where the estimated cost is $3,000.00 or less and 1 percent of the estimated cost at $3,000.00 or more.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How to apply in Burlington
General guide, not specific to this office
What a patio permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a patio permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of Burlington Department of Permitting and Inspections (DPI)
- 645 Pine Street, Burlington, VT 05401
- Phone: 802-863-0442
- Email: PermittingInspections@burlingtonvt.gov
Your Patio Permit checklist for Burlington
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: burlingtonvt.gov: DPI.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Burlington permit portal.
- Keep the office details handy. City of Burlington Department of Permitting and Inspections (DPI). Phone: 802-863-0442. Email: PermittingInspections@burlingtonvt.gov. Address: 645 Pine Street, Burlington, VT 05401.
Compiled from the official sources on this page. Last checked .
What else needs a permit in Burlington
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | Cost of in-kind repair work; painting and carpeting are exempt at any cost | See schedule |
| Deck Permit | Permit required | Any size | See schedule |
| Electrical Permit | It depends | Cost of in-kind repair work | Wiring permits are $8.50 for every $1,000.00 of the estimated cost of the work, with a minimum of $50.00 per permit (BCO Sec. 12-26) |
| EV Charger Permit | Permit required | Any size | See schedule |
| Fence Permit | Permit required | Any size | See schedule |
| HVAC Permit | It depends | Cost of in-kind repair work | The trade fees in the city code are $8.50 for every $1,000.00 of the estimated cost of the work for a wiring permit; the schedule has the rest |
| Plumbing Permit | It depends | Cost of in-kind repair work | Plumbing permits are $8.50 for every $1,000.00 of the cost of the work; the schedule has the rest |
| Pool Permit | Permit required | Any size | See schedule |
| Roof Replacement Permit | It depends | Cost of in-kind repair work; a full replacement is not a repair | See schedule |
| Shed Permit | Permit required | Any size | See schedule |
| Solar Permit | Permit required | Any size | See schedule |
| Water Heater Permit | It depends | Cost of in-kind repair work | Plumbing permits are $8.50 for every $1,000.00 of the cost of the work; the schedule has the rest |
Frequently asked questions
- Do you need a patio permit in Burlington?
- Yes. Any new patio needs a zoning permit. If you are unsure how that applies to your project, call the permit office at 802-863-0442 before you start.
- How much does a patio permit cost in Burlington?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the permit office at 802-863-0442.
- How long does a patio permit take in Burlington?
- The Zoning Forms and Checklists page says "A typical zoning permit takes 3-4 weeks": 1-2 weeks of staff review, then a 15-day appeal period before the permit can be picked up. Board-reviewed permits take longer. Times can vary by workload and project scope, so confirm with the office.
- Where do you apply for a patio permit in Burlington?
- You can apply through the Burlington permit portal or contact the City of Burlington Department of Permitting and Inspections (DPI) directly. The links are listed on this page.
- Can a homeowner pull a patio permit themselves in Burlington?
- Under Vermont law (20 V.S.A. 2730(b)(1); 26 V.S.A. 910(3), 910(6); 26 V.S.A. 2198(a)(1); 30 V.S.A. 51(h)(4)): A Vermont homeowner can do their own work on an owner-occupied single-family home without a state construction permit, because that home is not a public building under the state fire and building safety code (20 V.S.A. 2730(b)(1)). No state electrician's license is needed for electrical work by an owner in the owner's freestanding single-unit residence and its outbuildings, or for any electrical work in a building with no more than two dwelling units (26 V.S.A. 910(3) and (6)). No plumbing license is needed for plumbing an owner does in an owner-occupied, freestanding single-family dwelling, though the work must still conform to state law (26 V.S.A. 2198). An owner who builds their own home and lives in it may depart from the Residential Building Energy Standards only by disclosing each noncompliant item in writing to a buyer before a purchase agreement and recording that certificate in the land records (30 V.S.A. 51(h)(4)). Town zoning permits still apply. Confirm how Burlington applies this before you apply.
From the Library
Everything above, sourced
How this patio permit page for Burlington was verified. 2 official sources: burlingtonvt.gov, burlingtonvt.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Burlington Department of Permitting and Inspections (DPI). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page