Vermont / Burlington

Deck Permit in Burlington, Vermont

Permit required

Yes, a permit is required

Any new or replacement deck.

Quick answer

Every deck needs a building permit and a zoning permit in Burlington. DPI requires a building permit for all non-trade work, with exceptions only for carpeting, painting, nonsolid fences, storm doors and windows, and in-kind repairs of $1,000.00 or less, and CDO Sec. 3.1.2(a) lists "Porches, patios, and decks" as work needing a zoning permit. The portal has a short-form "Building Permit - Deck" application.

Issued by
City of Burlington Department of Permitting and Inspections (DPI)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

If a contractor builds your deck, they usually handle the permit as part of the job. Compare a few bids before you commit.

Compare deck contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a deck permit costs in Burlington

Fee schedule in force
Official scheduleRead .
  • Building permit: Burlington Code of Ordinances (BCO) Sec. 8-28(a), "$8.50 per $1,000.00" of Estimated Cost of Construction "with a minimum permit fee of thirty ($30.00) dollars" (Permit Applications and Forms page; the code text as published online still sets the minimum at $20.00).
  • When the building inspector has to enforce and a permit is required as a result, BCO 8-28(f) adds a processing fee of $30.00 where the estimated cost is $3,000.00 or less and 1 percent of the estimated cost at $3,000.00 or more.
  • The Permit Fees page works an example: a new $1,500 deck costs a "$122 Zoning Permit Application Fee" plus a "$30 Construction Permit Fee", "TOTAL for this project would be $152-162 in fees."
  • Zoning permit, FY2027 Fee Schedule (effective July 1, 2026): "Basic Zoning Permit (non-design control RL)", "Fence Permit" and "Certificate of Appropriateness Level I (COA I)" (projects under $29,000 estimated construction cost) are "$15 filing fee +" "$107";
  • COA Level II (estimated construction cost of $29,000 or more) is $15 filing fee + $140 + $2.20 per $1,000 of ECC, plus a Development Review Fee of $4.50 per $1,000 of ECC.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Burlington

General guide, not specific to this office

What a deck permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a deck permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Burlington Department of Permitting and Inspections (DPI)

What else needs a permit in Burlington

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsCost of in-kind repair work; painting and carpeting are exempt at any costSee schedule
Electrical PermitIt dependsCost of in-kind repair workWiring permits are $8.50 for every $1,000.00 of the estimated cost of the work, with a minimum of $50.00 per permit (BCO Sec. 12-26)
EV Charger PermitPermit requiredAny sizeSee schedule
Fence PermitPermit requiredAny sizeSee schedule
HVAC PermitIt dependsCost of in-kind repair workThe trade fees in the city code are $8.50 for every $1,000.00 of the estimated cost of the work for a wiring permit; the schedule has the rest
Patio PermitPermit requiredAny sizeSee schedule
Plumbing PermitIt dependsCost of in-kind repair workPlumbing permits are $8.50 for every $1,000.00 of the cost of the work; the schedule has the rest
Pool PermitPermit requiredAny sizeSee schedule
Roof Replacement PermitIt dependsCost of in-kind repair work; a full replacement is not a repairSee schedule
Shed PermitPermit requiredAny sizeSee schedule
Solar PermitPermit requiredAny sizeSee schedule
Water Heater PermitIt dependsCost of in-kind repair workPlumbing permits are $8.50 for every $1,000.00 of the cost of the work; the schedule has the rest

Frequently asked questions

Do you need a deck permit in Burlington?
Yes. Any new or replacement deck. If you are unsure how that applies to your project, call the permit office at 802-863-0442 before you start.
How much does a deck permit cost in Burlington?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the permit office at 802-863-0442.
How long does a deck permit take in Burlington?
The Zoning Forms and Checklists page says "A typical zoning permit takes 3-4 weeks": 1-2 weeks of staff review, then a 15-day appeal period before the permit can be picked up. Board-reviewed permits take longer. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a deck permit in Burlington?
You can apply through the Burlington permit portal or contact the City of Burlington Department of Permitting and Inspections (DPI) directly. The links are listed on this page.
Can a homeowner pull a deck permit themselves in Burlington?
Under Vermont law (20 V.S.A. 2730(b)(1); 26 V.S.A. 910(3), 910(6); 26 V.S.A. 2198(a)(1); 30 V.S.A. 51(h)(4)): A Vermont homeowner can do their own work on an owner-occupied single-family home without a state construction permit, because that home is not a public building under the state fire and building safety code (20 V.S.A. 2730(b)(1)). No state electrician's license is needed for electrical work by an owner in the owner's freestanding single-unit residence and its outbuildings, or for any electrical work in a building with no more than two dwelling units (26 V.S.A. 910(3) and (6)). No plumbing license is needed for plumbing an owner does in an owner-occupied, freestanding single-family dwelling, though the work must still conform to state law (26 V.S.A. 2198). An owner who builds their own home and lives in it may depart from the Residential Building Energy Standards only by disclosing each noncompliant item in writing to a buyer before a purchase agreement and recording that certificate in the land records (30 V.S.A. 51(h)(4)). Town zoning permits still apply. Confirm how Burlington applies this before you apply.

From the Library

Everything above, sourced

How this deck permit page for Burlington was verified. 2 official sources: burlingtonvt.gov, burlingtonvt.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Burlington Department of Permitting and Inspections (DPI). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project