Permit required

Yes, a permit is required

Any solar installation: building permit plus electrical permit.

Quick answer

Burlington publishes no solar-specific permit page, but solar is not among the building-permit exceptions, so a rooftop or ground-mounted system needs a building permit, and its wiring needs an electrical permit from DPI's electrical inspectors, who run a separate solar inspection slot. No zoning permit is needed: CDO Sec. 3.1.2(c)17 says nothing in the ordinance may prohibit the installation of solar collectors.

Issued by
City of Burlington Department of Permitting and Inspections (DPI)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your Vermont Office of Professional Regulation (Residential Contractors) license active, and under which business name? Verify it on secure.professionals.vermont.gov.

Vermont's owner-builder rule (20 V.S.A. 2730(b)(1); 26 V.S.A. 910(3), 910(6); 26 V.S.A. 2198(a)(1); 30 V.S.A. 51(h)(4)) sets what you may do on your own home without hiring anyone. Read the statute.

What a solar permit costs in Burlington

Fee schedule in force
Official scheduleRead .
  • Building permit: Burlington Code of Ordinances (BCO) Sec. 8-28(a), "$8.50 per $1,000.00" of Estimated Cost of Construction "with a minimum permit fee of thirty ($30.00) dollars" (Permit Applications and Forms page; the code text as published online still sets the minimum at $20.00).
  • When the building inspector has to enforce and a permit is required as a result, BCO 8-28(f) adds a processing fee of $30.00 where the estimated cost is $3,000.00 or less and 1 percent of the estimated cost at $3,000.00 or more.
  • Wiring permits are $8.50 for every $1,000.00 of the estimated cost of the work, with a minimum of $50.00 per permit (BCO Sec. 12-26);
  • electrical work begun before the permit adds a processing fee of $75.00 up to $6,000.00 of work and 1 percent of the estimated cost at $6,000.00 or more.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Burlington

General guide, not specific to this office

What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Burlington Department of Permitting and Inspections (DPI)

What else needs a permit in Burlington

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsCost of in-kind repair work; painting and carpeting are exempt at any costSee schedule
Deck PermitPermit requiredAny sizeSee schedule
Electrical PermitIt dependsCost of in-kind repair workWiring permits are $8.50 for every $1,000.00 of the estimated cost of the work, with a minimum of $50.00 per permit (BCO Sec. 12-26)
EV Charger PermitPermit requiredAny sizeSee schedule
Fence PermitPermit requiredAny sizeSee schedule
HVAC PermitIt dependsCost of in-kind repair workThe trade fees in the city code are $8.50 for every $1,000.00 of the estimated cost of the work for a wiring permit; the schedule has the rest
Patio PermitPermit requiredAny sizeSee schedule
Plumbing PermitIt dependsCost of in-kind repair workPlumbing permits are $8.50 for every $1,000.00 of the cost of the work; the schedule has the rest
Pool PermitPermit requiredAny sizeSee schedule
Roof Replacement PermitIt dependsCost of in-kind repair work; a full replacement is not a repairSee schedule
Shed PermitPermit requiredAny sizeSee schedule
Water Heater PermitIt dependsCost of in-kind repair workPlumbing permits are $8.50 for every $1,000.00 of the cost of the work; the schedule has the rest

Frequently asked questions

Do you need a solar permit in Burlington?
Yes. Any solar installation: building permit plus electrical permit. If you are unsure how that applies to your project, call the permit office at 802-863-0442 before you start.
How much does a solar permit cost in Burlington?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the permit office at 802-863-0442.
Where do you apply for a solar permit in Burlington?
You can apply through the Burlington permit portal or contact the City of Burlington Department of Permitting and Inspections (DPI) directly. The links are listed on this page.
Can a homeowner pull a solar permit themselves in Burlington?
Under Vermont law (20 V.S.A. 2730(b)(1); 26 V.S.A. 910(3), 910(6); 26 V.S.A. 2198(a)(1); 30 V.S.A. 51(h)(4)): A Vermont homeowner can do their own work on an owner-occupied single-family home without a state construction permit, because that home is not a public building under the state fire and building safety code (20 V.S.A. 2730(b)(1)). No state electrician's license is needed for electrical work by an owner in the owner's freestanding single-unit residence and its outbuildings, or for any electrical work in a building with no more than two dwelling units (26 V.S.A. 910(3) and (6)). No plumbing license is needed for plumbing an owner does in an owner-occupied, freestanding single-family dwelling, though the work must still conform to state law (26 V.S.A. 2198). An owner who builds their own home and lives in it may depart from the Residential Building Energy Standards only by disclosing each noncompliant item in writing to a buyer before a purchase agreement and recording that certificate in the land records (30 V.S.A. 51(h)(4)). Town zoning permits still apply. Confirm how Burlington applies this before you apply.

From the Library

Everything above, sourced

How this solar permit page for Burlington was verified. 2 official sources: burlingtonvt.gov, burlingtonvt.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Burlington Department of Permitting and Inspections (DPI). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project