Vermont

Building without a permit in Vermont

Quick answer

Vermont issues no state building permit for an owner-occupied single-family home: the state fire and building safety code covers only public buildings, and that definition expressly excludes an owner-occupied single-family residence (20 V.S.A. 2730(b)(1)), though a new house, or a change that increases its water or wastewater design flow, needs a state wastewater and potable water supply permit unless an exception applies (10 V.S.A. 1973(a)). For most houses the permit that carries a penalty is the town's zoning permit, since in a town with zoning bylaws no land development may begin without one (24 V.S.A. 4449(a)(1)); a town may also adopt its own building code, enforced like its other ordinances (24 V.S.A. 3101).

Outline of Vermont beside its penalty for building without a permit: fine up to $200 (per offense; civil penalty $800)
Who sets the penalty
Cities and counties, under a state capTowns and cities set it (Vermont counties have no zoning role); for most houses the penalty attaches to the town zoning permit
Fine in state law
Town zoning fines up to $200 per offense, or a civil penalty up to $800
Jail in state law
Not stated
Each day a new offense
Yes
Permit after the fact
Path in state law

A state permit many Vermont houses also need

Town zoning is not the only permit question in Vermont. A new house, or a change that increases a building's water or wastewater design flow, also needs a state wastewater and potable water supply permit unless one of the law's exceptions applies, whether or not the town has zoning, so check both when you legalize work.

  • Vermont law requires a state wastewater and potable water supply permit before anyone constructs a new building or structure, or modifies one in a way that increases the design flow of its water supply or wastewater system, unless one of the law's exceptions applies. legislature.vermont.gov document

Ask about both permits

When you call the town about the work at (your address), ask too whether it changed the design flow of the house's water or wastewater system; if it did, ask the state Agency of Natural Resources about the wastewater and potable water supply permit before you file.

What Vermont law says

Vermont issues no state building permit for an owner-occupied single-family home: the state fire and building safety code covers only public buildings, and that definition expressly excludes an owner-occupied single-family residence (20 V.S.A. 2730(b)(1)), though a new house, or a change that increases its water or wastewater design flow, needs a state wastewater and potable water supply permit unless an exception applies (10 V.S.A. 1973(a)).

For most houses the permit that carries a penalty is the town's zoning permit, since in a town with zoning bylaws no land development may begin without one (24 V.S.A. 4449(a)(1)); a town may also adopt its own building code, enforced like its other ordinances (24 V.S.A. 3101). Violating a zoning bylaw can bring a fine of up to $200 for each offense, each day the violation continues is a separate offense, and the fine doubles if it goes unpaid; the town must first send a seven-day warning notice by certified mail with a chance to cure, except for a repeat violation within the next 12 months (24 V.S.A. 4451(a)).

A town can instead bring a zoning or other ordinance violation as a civil ordinance violation, with a civil penalty of up to $800, each day a separate violation, and its administrative officer must act to stop, correct, or abate construction that violates the bylaws (24 V.S.A. 1974a(a) and (d), 4452). Rented homes, condominiums and other public buildings are different: violating the state code there carries a fine of up to $10,000, prosecuted by the State's Attorney, and the state may also assess an administrative penalty of up to $1,000 per violation (20 V.S.A. 2730(a), 2734(a) and (c)).

Cited from 24 V.S.A. 4449(a)(1), 4451(a), 4452, 1974a(a) and (d), 3101; 20 V.S.A. 2730, 2734(a) and (c); 10 V.S.A. 1973(a): official text. Localities enforce these rules and may add their own fees and procedures on top.

Can you get a permit after the work is done?

No Vermont statute creates an after-the-fact or as-built permit for a house; whether a town will issue a zoning permit for work already done, and on what terms, is set by the town's own bylaws. The state does set a time limit: a town enforcement action for failing to obtain or comply with a required municipal land use permit must be started within 15 years from the date the violation first occurred, and the person against whom the action is brought carries the burden of proving that date (24 V.S.A. 4454(a)).

A town also cannot enforce a permit issued after July 1, 1998 unless the permit or a notice of it was recorded in the town land records (24 V.S.A. 4454(b)). Where a town's bylaws require a certificate of occupancy, it is unlawful to use or occupy a new or altered structure until the certificate is issued (24 V.S.A. 4449(a)(2)).

Cited from 24 V.S.A. 4454(a) and (b); 24 V.S.A. 4449(a)(2): official text.

The typical path, whatever your locality calls it: stop any ongoing work, contact the permit office before they contact you, apply for the permit describing what was actually built, and expect the office to require opening up or inspecting concealed work. Voluntarily coming forward generally goes better than waiting for a complaint or a sale to surface it.

What Burlington, South Burlington and Rutland add when the work came first

For most houses the permit that matters in Vermont is the town zoning permit, and these three cities price a late one three ways. South Burlington adds a supplement that grows once a violation notice is issued, Burlington multiplies the zoning application fee after a notice, and Rutland charges an after-the-fact penalty fee (ask whether it is added to the regular fees or replaces them). The South Burlington examples show why it pays to apply before the notice.

  • South Burlington charges an after-the-fact supplement on any permit or review application filed after construction started without all local approvals: the standard fee plus 50% when no notice of violation was issued, or the standard fee plus 100% when the city's Administrative Officer issued a formal notice of violation. southburlingtonvt.gov: Planning and Zoning Permit Fees PDF
  • South Burlington's Planning and Zoning Fee Schedule was adopted July 10, 2023. southburlingtonvt.gov: Planning and Zoning Permit Fees PDF
  • South Burlington's zoning permit fee (the schedule calls it a zoning (building) permit) for residential additions and alterations is $5 per $1,000 of project cost, minimum $30, plus a $13 digitization fee. southburlingtonvt.gov: Planning and Zoning Permit Fees PDF
  • If a Burlington zoning enforcement action makes a zoning permit necessary, the application fee is twice the regular fee when you apply within 7 days of receiving the violation notice, triple when you apply 7 to 15 days after, and triple plus $75/hour of staff time, up to $500 of staff time, after 15 days; these fees are separate from any penalties (Comprehensive Development Ordinance Sec. 2.7.9). burlingtonvt.gov: 2503
  • Burlington's FY2027 Department of Permitting and Inspections fee schedule, effective July 1, 2026, repeats that permit applications resulting from a zoning Notice of Violation are subject to double, triple, or triple plus up to $500 of the application fee under CDO Section 2.7.9. burlingtonvt.gov: 2544
  • On Burlington's FY2027 schedule, a Basic Zoning Permit in the non-design-control RL district, and a Certificate of Appropriateness Level I for projects under $29,000 of estimated construction cost, costs a $15 filing fee plus $107. burlingtonvt.gov: 2544
  • Burlington's zoning permit fees include a $15 filing fee assessed by the Clerk/Treasurer's office as required by state statute. burlingtonvt.gov: 2544
  • Burlington's building permit fee is $8.50 per $1,000.00 of estimated cost of construction (design, labor and materials), with a minimum fee of $30.00, set by BCO 8-28(a). burlingtonvt.gov: Permit Applications and Forms
  • Rutland City's after-the-fact permitting charge, a penalty fee, is 2x the application fee and ancillary fees, and it applies only to building permit applications, zoning permit applications, ancillary fees and sign permit applications. rutlandcity.org: 2023 Fee Schedule
  • For certificate of occupancy permits, Rutland City's after-the-fact charge is 5x the permitting fee, not to exceed $500.00; the certificate of occupancy fee for a real estate transaction or conveyance is $100.00. rutlandcity.org: 2023 Fee Schedule
  • Rutland City's building and zoning fee schedule took effect January 1, 2023, approved by the Board of Aldermen on August 15, 2022. rutlandcity.org: 2023 Fee Schedule
  • Rutland City charges a $50.00 building permit application fee and a $50.00 zoning permit application fee, plus a $5.00 15-day notice fee on zoning permits and recording fees set by the Legislature. rutlandcity.org: 2023 Fee Schedule
  • Rutland City's ancillary fee for a shed up to 200 sq. ft. is $25.00; ancillary fees apply only to building and zoning permit applications and are not charged twice when a project needs both permits. rutlandcity.org: 2023 Fee Schedule

South Burlington, a deck worth $12,000 built without a zoning permit outside the floodplain overlay, before any violation notice

Zoning permit, $12,000 at $5 per $1,000$60.00
After-the-fact supplement, no violation notice: 50%$30.00
Digitization fee$13.00
Applied before a notice$103.00

South Burlington, the same deck after a formal notice of violation

Zoning permit, $12,000 at $5 per $1,000$60.00
After-the-fact supplement after a notice of violation: 100%$60.00
Digitization fee$13.00
Applied after a notice$133.00

Burlington, a deck worth $12,000 in the RL district, applied for within 7 days of a zoning violation notice

Filing fee$15.00
Basic zoning permit at twice the regular fee, 2 x $107$214.00
Building permit, $12,000 at $8.50 per $1,000.00$102.00
Before any building code charge$331.00

This doubles only the $107 zoning fee, not the filing fee; ask whether the city doubles the whole application fee. Applied before any notice, the zoning line would be the regular fee instead of double. Burlington's own fee examples also add a recording fee to the building permit and a small building certificate of occupancy fee. Applying later than 7 days triples the zoning fee, and Burlington charges a separate fee for building work begun without a building permit; the city does not publish that amount, so ask for it when you call.

Before you call

Call the town's permit office: the zoning administrator in most towns, the Department of Permitting and Inspections in Burlington, and the Building and Zoning Department in Rutland, where interior remodels need a building permit only. Ask: "Work was done at (your address) without the permit it needed and no notice has been issued. Can I apply now, which permits does it need, and what will the after-the-fact fee be?"

What happens when a Vermont city finds it first

A notice of violation does not stay private: within 30 days the town must deliver it to the town clerk for recording, which is the strongest reason to come forward first. Burlington and Rutland both count every day of a violation as a new offense, and Burlington can refuse new permits on the property until the old problem is fixed. South Burlington applies the state's penalties instead of writing its own, and its permit FAQ and its regulations adopted August 3, 2026 differ on interior-only remodels, so ask its zoning office which one it applies.

  • Within 30 days of issuing a notice of violation, the town official must deliver it to the town clerk for recording. legislature.vermont.gov document
  • Burlington zoning violations are civil offenses: once a violation is determined, each day it continues is a separate offense, and the administrative officer can issue municipal complaint tickets of $100.00 for a first ticketed offense, $150.00 for a second ticketed offense for the same violation and $250.00 for a third, after which the city may ask to move the case to the Environmental Court (CDO Sec. 2.7.7). burlingtonvt.gov: 2503
  • To remedy a Burlington zoning violation the administrative officer may require any combination of a new zoning permit, referral to the Development Review Board, immediate removal of the structure, denial of a zoning Certificate of Occupancy, and fines until the violation is fixed; the officer's decision can be appealed to the Development Review Board within 15 days. burlingtonvt.gov: 2503
  • Burlington's administrative officer may deny all zoning permits and certificates of occupancy for a property with an uncorrected zoning violation or an expired zoning permit that never got a final certificate of occupancy, or may grant a new permit on condition that the old problem is corrected before the new permit's final certificate (CDO Sec. 2.7.8). burlingtonvt.gov: 2503
  • Anyone found in violation of Rutland City's building permit chapter, or who ignores a written order of the building inspector, owes a civil penalty of $50 to $500 for each offense, and each day the offense continues is a separate offense (Title 9, Sec. 1030). rutlandcity.org: Title 91
  • Rutland City says decks, sheds, garages, porches, additions and pools need both a building and a zoning permit, interior remodels such as kitchens and bathrooms and same-size rebuilt decks or stairs need a building permit only, and failing to comply leads to enforcement steps and can affect your ability to sell the property later. rutlandcity.org: building permit information
  • South Burlington's regulations leave their own Violations and Penalties sections reserved and apply the penalties and remedies of the Vermont Planning and Development Act (Title 24, chapter 117). southburlingtonvt.gov: 5086
  • South Burlington's permit FAQ says every new deck needs a zoning permit regardless of size, and so does interior remodeling over $5,000 in total cost even with no change to the footprint; deck repairs up to $5,000 that keep the footprint need none. southburlingtonvt.gov: faq
  • South Burlington's Land Development Regulations, adopted August 3, 2026, bar starting any land development, or any interior remodel that adds one or more bedrooms, without a zoning permit from the Administrative Officer. southburlingtonvt.gov: 5086
  • In South Burlington the City Fire Marshal oversees building permits, which state law requires for construction on any building that is not a single-family, wholly owner-occupied home. southburlingtonvt.gov: faq
  • Since January 1, 2023, Rutland City takes building and zoning permit applications only through its online permit portal; paper applications were discontinued. rutlandcity.org: building permit information
  • South Burlington's Department of Planning and Zoning is on the 3rd floor of the Library/City Hall at 180 Market Street, South Burlington VT 05403, phone 802-846-4106. southburlingtonvt.gov: planning and zoning
  • Rutland City's building inspector answers at 802-774-7820, and City Hall is at 1 Strongs Avenue, Rutland. rutlandcity.org: building department

Selling a Vermont house with unpermitted work

Vermont has no general seller disclosure form. What it has is a rule written for exactly this problem: a buyer who finds, before closing, that work was done without a required town permit can give the seller 30 days to get it, and can then cancel if the buyer could still face town enforcement.

  • Vermont law says a missing or violated municipal land use permit creates no encumbrance on title and does not affect marketability, but a buyer who finds before closing that development happened without a required municipal permit, or in violation of one, may give the seller written notice; the seller then has 30 days (unless the parties agree otherwise) to get the permits or comply, and if not, the buyer may terminate if, as owner or occupant, the buyer could face an enforcement action under 24 V.S.A. 4454 (Title 27, section 612). legislature.vermont.gov: 005
  • Vermont's seller disclosure statute for real estate conveyances (Title 27, section 380) covers only flood information: before or in the purchase contract the seller must give the FEMA flood insurance rate map (or notice that none is in effect), say whether the property flooded while the seller owned it, and say whether flood insurance is carried or required; it asks nothing about permits, additions or code violations. legislature.vermont.gov: 005
  • A Vermont real estate licensee commits unprofessional conduct by failing to fully disclose to a buyer all material facts within the licensee's knowledge about the property being sold (Title 26, section 2296(4)); the duty is the agent's, not a seller form. legislature.vermont.gov document
  • Rutland City requires a written certificate of occupancy application before anyone transfers ownership of, or moves into, a dwelling in the city; the certificate is granted only if the building inspector finds the dwelling complies with local housing standards, zoning ordinances and building codes, and a violation carries a civil penalty of $100 to $500 per offense (Title 9, chapter 14, Secs. 1331, 1332, 1335). The city recommends scheduling the inspection when a property is listed, with a 1-2 week lead time. rutlandcity.org: certificates of occupancy
  • Burlington's FY2027 schedule prices a Zoning Compliance Report at $35, $70 expedited within 2 weeks, or $17 to renew within 2 years of a prior report. burlingtonvt.gov: 2544
  • Burlington's OpenGov portal has a public records search that looks up an address or a record to show its permit activity and information. burlingtonvt.portal.opengov.com: search
  • South Burlington keeps a searchable online archive of permits, development review applications and decisions, and its permit portal handles requests for Zoning Certificates of Compliance and zoning bylaw letters. southburlingtonvt.gov: planning and zoning
  • A South Burlington Certificate of Compliance costs $27 plus the $13 digitization fee, $40 in total. southburlingtonvt.gov: Planning and Zoning Permit Fees PDF
  • Rutland City's Building and Zoning Department charges $1.00 a page for property cards and certificate of occupancy permit copies, but landowners requesting documents about their own property pay no copying fee. rutlandcity.org: 2023 Fee Schedule

Before you list

Order a zoning compliance report or certificate of compliance for your address (Burlington and South Burlington both sell one; in Rutland, book the certificate of occupancy inspection when you list) and legalize anything it turns up before a buyer's notice starts the clock.

If a contractor did the work without a permit

Vermont requires registration, and a written contract, only for residential jobs over $10,000.00, and its registration law does not reach work on a detached structure. It does not require the contract to say who pulls permits, and the state licensing office cannot recover money for you, so the agreement you made and the Attorney General's consumer program are where to start.

  • A contractor must register with the Office of Professional Regulation before contracting with a homeowner for residential construction worth more than $10,000.00, labor and materials included. legislature.vermont.gov: 106
  • The registration law does not cover work on a structure that is not attached to a residential building. legislature.vermont.gov: 106
  • A Vermont registered residential contractor's written contract, required before taking a deposit or starting work over $10,000.00, must state the price basis, estimated start and completion dates, a description of the work and materials, and how change orders are approved; the statute does not require it to say who obtains permits (Title 26, section 5509(b)). legislature.vermont.gov: 106
  • The Office of Professional Regulation can discipline a registered residential contractor for unprofessional conduct, which includes failing to use a required written contract, failing to carry required liability or workers' compensation insurance, and committing a deceptive act in commerce under the Consumer Protection Act (Title 26, section 5510(b), (c)). legislature.vermont.gov: 106
  • Vermont's Office of Professional Regulation handles only fraud and deception by registered residential contractors and cannot review contracts, judge work quality, seek money damages or restitution, or mediate; it points homeowners to the Attorney General's Consumer Assistance Program, which runs the home improvement fraud registry, to a police report for home improvement fraud, and to small claims court. sos.vermont.gov: homeowner resources

What to send the contractor first

"Our agreement covers the work you did at (your address), and it went ahead without the town permit it needed. Please get that permit approved, or tell me in writing that you will not, so I can take it to the Consumer Assistance Program." Keep the agreement, receipts and messages for that office or small claims court.

Who can pull the permit

A Vermont homeowner can do their own work on an owner-occupied single-family home without a state construction permit, because that home is not a public building under the state fire and building safety code (20 V.S.A. 2730(b)(1)). No state electrician's license is needed for electrical work by an owner in the owner's freestanding single-unit residence and its outbuildings, or for any electrical work in a building with no more than two dwelling units (26 V.S.A. 910(3) and (6)).

No plumbing license is needed for plumbing an owner does in an owner-occupied, freestanding single-family dwelling, though the work must still conform to state law (26 V.S.A. 2198). An owner who builds their own home and lives in it may depart from the Residential Building Energy Standards only by disclosing each noncompliant item in writing to a buyer before a purchase agreement and recording that certificate in the land records (30 V.S.A. 51(h)(4)). Town zoning permits still apply.

Cited from 20 V.S.A. 2730(b)(1); 26 V.S.A. 910(3), 910(6); 26 V.S.A. 2198(a)(1); 30 V.S.A. 51(h)(4): official text.

Common questions about unpermitted work in Vermont

What is the penalty for building without a permit in Vermont?
Vermont issues no state building permit for an owner-occupied single-family home: the state fire and building safety code covers only public buildings, and that definition expressly excludes an owner-occupied single-family residence (20 V.S.A. 2730(b)(1)), though a new house, or a change that increases its water or wastewater design flow, needs a state wastewater and potable water supply permit unless an exception applies (10 V.S.A. 1973(a)). For most houses the permit that carries a penalty is the town's zoning permit, since in a town with zoning bylaws no land development may begin without one (24 V.S.A. 4449(a)(1)); a town may also adopt its own building code, enforced like its other ordinances (24 V.S.A. 3101). (24 V.S.A. 4449(a)(1), 4451(a), 4452, 1974a(a) and (d), 3101; 20 V.S.A. 2730, 2734(a) and (c); 10 V.S.A. 1973(a))
Can you get a permit after the work is done in Vermont?
No Vermont statute creates an after-the-fact or as-built permit for a house; whether a town will issue a zoning permit for work already done, and on what terms, is set by the town's own bylaws. The state does set a time limit: a town enforcement action for failing to obtain or comply with a required municipal land use permit must be started within 15 years from the date the violation first occurred, and the person against whom the action is brought carries the burden of proving that date (24 V.S.A. 4454(a)). (24 V.S.A. 4454(a) and (b); 24 V.S.A. 4449(a)(2))
Who can pull a permit in Vermont?
A Vermont homeowner can do their own work on an owner-occupied single-family home without a state construction permit, because that home is not a public building under the state fire and building safety code (20 V.S.A. 2730(b)(1)). No state electrician's license is needed for electrical work by an owner in the owner's freestanding single-unit residence and its outbuildings, or for any electrical work in a building with no more than two dwelling units (26 V.S.A. 910(3) and (6)). (20 V.S.A. 2730(b)(1); 26 V.S.A. 910(3), 910(6); 26 V.S.A. 2198(a)(1); 30 V.S.A. 51(h)(4))

Related situations in Vermont

See which parts of the work needed a permit, then send us the details

Want help getting unpermitted work approved?

Tell us where your project stands. Where we have a vetted local pro who handles permits in Vermont, we connect you; otherwise we reply with the exact steps and office links for your situation. Free to ask; no obligation.

PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

Your local permit office

Enforcement, after-the-fact fees, and the exact fix-it process are local. We cover these Vermont permit offices:

Official sources

This page summarizes state law from the official sources listed above, with a last checked date. It is not legal advice. Penalties and procedures are applied by local offices and courts case by case; for anything contested or high stakes, confirm with your permit office or a licensed professional in Vermont.