Shed Permit in Newark, New Jersey
It depends
Sometimes, depending on the project
Before installing a shed larger than 200 square feet or taller than 10 feet, and before running any water, gas, oil or sewer line to a shed of any size. Electrical work in an exempt shed still needs its own permit.
Quick answer
A construction permit for building work is not required for garden-type utility sheds and similar accessory structures that are 200 square feet or less in area, 10 feet or less in height, accessory to a residential building (Group R-2, R-3, R-4 or R-5), and with no water, gas, oil or sewer connection. Cross any one of those limits and the shed needs a Newark construction permit. The state rule is explicit that the exemption is only for the building side: a construction permit for electrical work is still required when applicable. Newark's contractor checklist also requires zoning approval (973-733-6333) before a construction permit is issued, and Newark zoning can regulate accessory-structure placement and lot coverage independently of the UCC.
- Typical threshold
- shed floor area, for a structure 10 feet or less in height with no water, gas, oil or sewer connection
- Issued by
- City of Newark Department of Engineering, Division of Construction Code Enforcement (Office of Uniform Construction Code)
- Phone
- 973-733-3957
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
If a contractor builds or places your shed, they usually handle any required permit. Compare a few bids before you commit.
Compare contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a shed permit costs in Newark
- Fee schedule in force
- Official scheduleRead .
- No shed-specific line in Newark municipal code Chapter 7:2-3.1 (Ord. 6 S+FD, 9-5-2007).
- Where a permit is required, building work is priced as 'Building Renovation and Alteration' at $28 per $1,000 of estimated cost of construction between $0 and $50,000 (then $21 per $1,000 to $100,000, $17 per $1,000 above that), or at $0.03 per cubic foot for a new residential structure, subject to the 'Minimum Building Permit: $58.'
- The $58 non-refundable processing fee is credited against the total.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How to apply in Newark
General guide, not specific to this office
What a shed permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a shed permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of Newark Department of Engineering, Division of Construction Code Enforcement (Office of Uniform Construction Code)
- City Hall, 920 Mayor Kenneth A. Gibson Blvd, Room B-23, Newark, NJ 07102
- Phone: 973-733-3957
Shed Permit in Newark compared with nearby New Jersey localities
| Locality | Permit needed? | Threshold | What each New Jersey schedule says | Verified |
|---|---|---|---|---|
| Newark | It depends | shed floor area, for a structure 10 feet or less in height with no water, gas, oil or sewer connection | See schedule | |
| Jersey City | It depends | no construction permit required for garden-type utility sheds 200 sq ft or less and 10 ft or less in height with no utility connections | The building subcode new-construction fee of $0.027 per cubic foot of structure volume applies for residential use groups, per city ordinance Ch. 160-1 |
Your Shed Permit checklist for Newark
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: shed floor area, for a structure 10 feet or less in height with no water, gas, oil or sewer connection. Read the rule where we read it: newarknj.gov: Building Division Office of Uniform Co.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Newark permit portal.
- Keep the office details handy. City of Newark Department of Engineering, Division of Construction Code Enforcement (Office of Uniform Construction Code). Phone: 973-733-3957. Address: City Hall, 920 Mayor Kenneth A. Gibson Blvd, Room B-23, Newark, NJ 07102.
Compiled from the official sources on this page. Last checked .
Permitting activity in Newark
In 2025, Newark authorized permits for 2,190 new residential housing units (8 single-family, 2,182 in multi-family buildings), valued at $348M, up from 1,736 the year before. That works out to about 7.8 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 282,520.
What else needs a permit in Newark
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | Before building a new deck, enlarging one, or replacing structural members | See schedule |
| Electrical Permit | It depends | Before installing, altering or repairing electrical work, including new circuits... | Newark municipal code Chapter 7:2-3.2b: receptacles and fixtures, first 50 at $58 and each additional 20 at $12 |
| Fence Permit | It depends | fence height at which a construction permit becomes required; swimming pool barriers are excluded from the exemption at any height | There shall be a non-refundable processing fee of $58 applied to all permits, due at the time of application |
| HVAC Permit | It depends | Before replacing a boiler, furnace, air conditioning unit or condensing unit, and before... | See schedule |
| Patio Permit | It depends | Before building a roofed or covered patio, a patio enclosure, or any patio structure... | See schedule |
| Plumbing Permit | It depends | Before repiping, replacing a water heater, adding fixtures, or connecting to water or... | See schedule |
| Pool Permit | It depends | Before installing an in-ground or above-ground pool, before installing a hot tub or spa... | The 'Minimum Building Permit: $58' and the $58 non-refundable processing fee apply |
| Roof Replacement Permit | It depends | Before re-roofing anything other than a detached one- or two-family house, and before... | Newark municipal code Chapter 7:2-3.1d13 sets 'Siding and Roofing Permits R-3, R-4, R-5: $58'; the schedule has the rest |
| Solar Permit | Permit required | Any size | See schedule |
Frequently asked questions
- Do you need a shed permit in Newark?
- It depends on the project. Shed floor area, for a structure 10 feet or less in height with no water, gas, oil or sewer connection. If you are unsure how that applies to your project, call the permit office at 973-733-3957 before you start.
- How much does a shed permit cost in Newark?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 15 Aug 2026. For the figure on your own project, call the permit office at 973-733-3957.
- How long does a shed permit take in Newark?
- In Newark, a shed permit typically takes up to 20 business days. Times can vary by workload and project scope, so confirm with the office.
- Where do you apply for a shed permit in Newark?
- You can apply through the Newark permit portal or contact the City of Newark Department of Engineering, Division of Construction Code Enforcement (Office of Uniform Construction Code) directly. The links are listed on this page.
- Can a homeowner pull a shed permit themselves in Newark?
- Under New Jersey law (N.J.A.C. 5:23-2.15(b)2i, (b)3i, (b)1i): Yes, for an owner-occupied single-family home. The UCC provides that plumbing, electrical, heating, ventilating, air conditioning, and refrigeration work shall not be undertaken except by licensed persons, except in the case of a single-family homeowner on his or her own dwelling. The same section extends the homeowner exception to LP-gas work. A homeowner acting as their own general contractor on a new one- or two-family dwelling files an affidavit acknowledging the work is not covered by the New Home Warranty program. The homeowner provision covers the owner's own dwelling only; work on rentals, multifamily buildings, or others' homes requires licensed contractors. Confirm how Newark applies this before you apply.
From the Library
Shed Permit in other New Jersey localities
Everything above, sourced
How this shed permit page for Newark was verified. 2 official sources: newarknj.gov, nj.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Newark Department of Engineering, Division of Construction Code Enforcement (Office of Uniform Construction Code). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page