Shed Permit in New Castle County, Delaware

It depends

Sometimes, depending on the project

Sheds over 200 sq ft, taller than the eave or overall height limits, or able to store a motor vehicle.

Quick answer

A one-story detached shed, playhouse, pergola or gazebo for a one- or two-family dwelling is exempt if its floor area does not exceed 200 sq ft, its eave height is 10 feet or less and its overall height is 20 feet or less. Garages and structures capable of storing motor vehicles never qualify. Exempt sheds must still meet zoning setbacks (minimum 3 feet from rear and rear-side lot lines).

Diagram of the 200 sq ft footprint area threshold for a shed permit in New Castle County, Delaware
Threshold illustrated: 200 sq ft. Whether New Castle County requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-10-03.
Typical threshold
Floor area of a one-story detached accessory structure with an eave height of 10 feet or less and overall height of 20 feet or less; garages never qualify
Issued by
New Castle County Department of Land Use
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

If a contractor builds or places your shed, they usually handle any required permit. Compare a few bids before you commit.

Compare contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a shed permit costs in New Castle County

Fee basis
Project valuation
Fee schedule in force
Official scheduleRead .
  • Building permit fees per the Deck Permit Requirements, Swimming Pool & Hot Tub/Spa and Residential Addition and Accessory Structure Permit Requirements sheets (rev. 11/04/2025): "Building Permit Fee: $12 per $1,000 of Valuation ($142 Minimum)", Certificate of Occupancy $60, Zoning Permit Fee 10% of Building Permit Fee ($21 minimum, $145 maximum), NCC Volunteer Fire Assistance Fund Fee 0.5% of valuation, and a $65 Floodplain/Wetland review fee where applicable.
  • The Chapter 6 Schedule of Permit and Review Fees (as amended through January 1, 2026) prints the building permit valuation fee as $12.00 "for the first $1,000 valuation or any part thereof up to $1,000,000" and $5.25 for each additional $1,000 valuation in excess of $1,000,000, with a minimum fee of $60.00, a zoning review fee of 10% of permit valuation fee ($21.00 minimum, $145.00 maximum), a Certificate of Occupancy fee of $60.00 and an NCC Volunteer Fire Assistance Fund fee of 0.50% of permit valuation fee;
  • the sheets print a $142 minimum and a Volunteer Fire fee of 0.5% of valuation, so confirm both with the Department of Land Use.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in New Castle County

General guide, not specific to this office

What a shed permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a shed permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

New Castle County Department of Land Use

  • New Castle County Government Center, 87 Reads Way, New Castle, DE 19720
  • Phone: 302-395-5400
  • Email: permits@newcastlede.gov

Shed Permit in New Castle County compared with nearby Delaware localities

LocalityPermit needed?ThresholdWhat each Delaware schedule saysVerified
New Castle CountyIt dependsFloor area of a one-story detached accessory structure with an eave height of 10 feet or less and overall height of 20 feet or less; garages never qualifySee schedule
Sussex CountyPermit requiredAny sizeSee schedule

Permitting activity in New Castle County

In 2025, New Castle County authorized permits for 1,322 new residential housing units (1,128 single-family, 194 in multi-family buildings), valued at $169M, down from 1,586 the year before. That works out to about 2.2 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 588,026.

What else needs a permit in New Castle County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsFinish work (tiling, cabinets, counter tops) and in-place fixture reinstallation are exempt; new or moved plumbing, walls or circuits are notSee schedule
Deck PermitIt dependsFloor area of a free-standing deck no more than 30 inches above grade and not adjacent to or attached to the dwellingSee schedule
Electrical PermitPermit requiredInspection by a State-licensed agency, or a State homeowner permit; New Castle County issues noneAn electrical job needs no permit from New Castle County, which does not permit or inspect electrical work
EV Charger PermitPermit requiredElectrical inspection by a State-licensed agency, or a State homeowner permit; New Castle County issues noneA home EV charger needs no permit from New Castle County, whose code exempts electric vehicle charging stations (Sec. 06.03.012.C)
Fence PermitIt dependsOnly fences that serve as swimming pool barriers need a permitNot published
HVAC PermitPermit requiredAny sizeSee schedule
Patio PermitIt dependsHeight of a non-structural slab, patio or decorative hardscaping at any pointNot published
Plumbing PermitPermit requiredAny sizeSee schedule
Pool PermitIt dependsPool, spa or hot tub wall height; any pool designed to connect to a circulation system needs a permit regardless of heightSee schedule
Roof Replacement PermitIt dependsShare of the roof sheathing repaired or replaced during a re-roofSee schedule
Solar PermitIt dependsRooftop panels on a one- or two-family dwelling are exempt from the County building permit; electrical work still goes through the StateNot published
Water Heater PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need a shed permit in New Castle County?
It depends on the project. Floor area of a one-story detached accessory structure with an eave height of 10 feet or less and overall height of 20 feet or less; garages never qualify. If you are unsure how that applies to your project, call the New Castle County Department of Land Use at 302-395-5400 before you start.
How much does a shed permit cost in New Castle County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 17 Nov 2026. For the figure on your own project, call the New Castle County Department of Land Use at 302-395-5400.
Where do you apply for a shed permit in New Castle County?
You can apply through the New Castle County permit portal or contact the New Castle County Department of Land Use directly. The links are listed on this page.
Can a homeowner pull a shed permit themselves in New Castle County?
Under Delaware law (9 Del. C. 6302(b); 9 Del. C. 4402(b); 24 Del. C. 1417; 24 Del. C. 1807(c)(2); 24 Del. C. 1820(c)(2); 16 Del. C. 7906(c)): Yes. Delaware homeowners may pull permits and do their own work, with trade-specific conditions. Sussex County's statute expressly lets any owner who wants to do their own work on their own building get a permit, and Kent County issues permits in the owner's name. For electrical work, a homeowner wiring their own home that is not for sale or rent must get a homeowner's permit from the Board of Electrical Examiners and pass a final inspection; swimming pools and hot tubs are excluded. Homeowners may do their own plumbing and HVACR work (but not gas piping) in their own home that is not for sale, rent or lease, and for plumbing must file a permit application with the inspection authority. Confirm how New Castle County applies this before you apply.

From the Library

Shed Permit in other Delaware localities

Everything above, sourced

How this shed permit page for New Castle County was verified. 2 official sources: newcastlede.gov, newcastlede.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with New Castle County Department of Land Use. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page