Delaware / New Castle County

Electrical Permit in New Castle County, Delaware

Permit required

Yes, a permit is required

Before electrical work: a licensed electrician has it inspected by a licensed inspection agency; an owner-occupant doing the work gets a State homeowner permit.

Confirmed on official page Verified

Issued byNew Castle County Department of Land Use

By Mario Bailey, verified against official sources

Quick answer

New Castle County does not permit or inspect electrical work. In unincorporated New Castle County, as everywhere in Delaware, electrical work by a State-licensed electrician is inspected by a Delaware-licensed electrical inspection agency, and an owner-occupant doing their own work obtains a homeowner electrical permit from the State (Board of Electrical Examiners, Division of Professional Regulation).

Who is pulling this permit?

Hire it out

Sponsored

Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

When a permit is usually needed

Before electrical work: a licensed electrician has it inspected by a licensed inspection agency; an owner-occupant doing the work gets a State homeowner permit.

What an electrical permit costs in New Castle County

Line item
electrical permitBy formulaSet by the State-licensed inspection agency or the State homeowner permit; the County charges no electrical fee.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in New Castle County

In New Castle County, in most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.

What most electrical permit applications include:

  • Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
  • For New Castle County, the written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
  • For New Castle County, the application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
  • Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
  • Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).

General submittal guidance from International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted). Source. New Castle County Department of Land Use sets the exact checklist for New Castle County.

Where to apply in New Castle County:

New Castle County Department of Land Use

  • New Castle County Government Center, 87 Reads Way, New Castle, DE 19720
  • Phone: 302-395-5400
  • Email: permits@newcastlede.gov

Electrical Permit in New Castle County compared with nearby Delaware localities

LocalityPermit needed?ThresholdWhat each Delaware schedule saysVerified
New Castle CountyPermit requiredAny sizeSee schedule
Sussex CountyPermit requiredAny sizeSee schedule

Inspections and closing out your permit

In New Castle County, electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.

  1. In New Castle County: a rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
  2. In New Castle County: the framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
  3. In New Castle County: ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
  4. In New Castle County: arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
  5. In New Castle County: panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
  6. In New Castle County: the service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
  7. In New Castle County: a final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the New Castle County permit portal or by phone at 302-395-5400.

Inspection sequence from International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need an electrical permit in New Castle County?
New Castle County does not permit or inspect electrical work. In unincorporated New Castle County, as everywhere in Delaware, electrical work by a State-licensed electrician is inspected by a Delaware-licensed electrical inspection agency, and an owner-occupant doing their own work obtains a homeowner electrical permit from the State (Board of Electrical Examiners, Division of Professional Regulation). Always confirm with the New Castle County Department of Land Use before starting.
How much does an electrical permit cost in New Castle County?
Set by the State-licensed inspection agency or the State homeowner permit; the County charges no electrical fee. See the official fee schedule for current amounts.
Where do you apply for an electrical permit in New Castle County?
You can apply through the New Castle County permit portal or contact the New Castle County Department of Land Use directly. The links are listed on this page.
Can a homeowner pull an electrical permit themselves in New Castle County?
Under Delaware law (9 Del. C. 6302(b); 9 Del. C. 4402(b); 24 Del. C. 1417; 24 Del. C. 1807(c)(2); 24 Del. C. 1820(c)(2); 16 Del. C. 7906(c)): Yes. Delaware homeowners may pull permits and do their own work, with trade-specific conditions. Sussex County's statute expressly lets any owner who wants to do their own work on their own building get a permit, and Kent County issues permits in the owner's name. For electrical work, a homeowner wiring their own home that is not for sale or rent must get a homeowner's permit from the Board of Electrical Examiners and pass a final inspection; swimming pools and hot tubs are excluded. Homeowners may do their own plumbing and HVACR work (but not gas piping) in their own home that is not for sale, rent or lease, and for plumbing must file a permit application with the inspection authority. Confirm how New Castle County applies this before you apply.

From the Library

What else needs a permit in New Castle County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsFinish work (tiling, cabinets, counter tops) and in-place fixture reinstallation are exempt; new or moved plumbing, walls or circuits are not11/04/2025): "Building Permit Fee: $12 per $1,000 of Valuation ($142 Minimum)"...
Deck PermitIt dependsFloor area of a free-standing deck no more than 30 inches above grade and not adjacent to or attached to the dwelling11/04/2025): "Building Permit Fee: $12 per $1,000 of Valuation ($142 Minimum)"...
EV Charger PermitPermit requiredAny sizeSee schedule
Fence PermitIt dependsOnly fences that serve as swimming pool barriers need a permitNot published
HVAC PermitPermit requiredAny size...6 Schedule of Permit and Review Fees, as amended through January 1, 2026): $5.25...
Patio PermitIt dependsHeight of a non-structural slab, patio or decorative hardscaping at any pointNot published
Plumbing PermitPermit requiredAny size...6 Schedule of Permit and Review Fees, as amended through January 1, 2026): $5.25...
Pool PermitIt dependsPool, spa or hot tub wall height; any pool designed to connect to a circulation system needs a permit regardless of height11/04/2025): "Building Permit Fee: $12 per $1,000 of Valuation ($142 Minimum)"...
Roof Replacement PermitIt dependsShare of the roof sheathing repaired or replaced during a re-roof11/04/2025): "Building Permit Fee: $12 per $1,000 of Valuation ($142 Minimum)"...
Shed PermitIt dependsFloor area of a one-story detached accessory structure with an eave height of 10 feet or less and overall height of 20 feet or less; garages never qualify11/04/2025): "Building Permit Fee: $12 per $1,000 of Valuation ($142 Minimum)"...
Solar PermitIt dependsRooftop panels on a one- or two-family dwelling are exempt from the County building permit; electrical work still goes through the StateNot published
Water Heater PermitPermit requiredAny size...6 Schedule of Permit and Review Fees, as amended through January 1, 2026): $5.25...

Electrical Permit in other Delaware localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not New Castle County documents; the office above sets the local rules.

How this electrical permit page for New Castle County was verified. 1 official source: newcastlede.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with New Castle County Department of Land Use. Rules change; confirm before you build. How we verify.