Delaware / New Castle County

EV Charger Permit in New Castle County, Delaware

Permit required

Yes, a permit is required

Before installing the charger circuit: electrical inspection through a Delaware-licensed inspection agency, or a State homeowner permit.

Confirmed on official page Verified

Issued byNew Castle County Department of Land Use

By Mario Bailey, verified against official sources

Quick answer

New Castle County exempts electric vehicle charging stations from its building permit and does not permit or inspect electrical work at all. The circuit for a home EV charger is electrical work, which in Delaware must be inspected by a State-licensed electrical inspection agency; an owner-occupant doing it themselves needs a State homeowner electrical permit.

Who is pulling this permit?

Hire it out

Sponsored

A licensed electrician typically pulls the electrical permit as part of the install. If you have not picked one yet, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

When a permit is usually needed

Before installing the charger circuit: electrical inspection through a Delaware-licensed inspection agency, or a State homeowner permit.

What an EV charger permit costs in New Castle County

Line item
EV charger permitBy formulaSet by the State-licensed electrical inspection agency; no County fee (EV charging stations are exempt from the County permit).
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in New Castle County

In New Castle County, in most of the US, installing a Level 2 (240 volt) home EV charger is handled as an electrical permit built around a load calculation and a single line diagram showing the new dedicated circuit. A Level 1 charger that simply plugs into an existing 120 volt outlet typically needs no permit unless new wiring is added.

What most EV charger permit applications include:

  • For New Castle County, a Level 2 charger needs its own dedicated 240 volt circuit and requires an electrical permit with inspection, since each outlet installed for EV charging must be fed by an individual branch circuit with no other outlets on it (NEC 625.40).
  • For New Castle County, the application includes an electrical load calculation showing the existing service panel has enough spare capacity for the added EVSE demand, worked out using the standard dwelling load calculation method (NEC 220.83).
  • For New Castle County, the breaker or other overcurrent device feeding the charger must be sized for continuous duty, rated at not less than 125 percent of the equipment's maximum load (NEC 625.41).
  • Plan submittal typically includes a single line diagram showing conductor size, breaker size, conduit, and panel rating, plus the charger's manufacturer specifications, since the EVSE itself must be a listed product (NEC 625.5).
  • For charging equipment rated over 60 amps or over 150 volts to ground, the application has to show a disconnecting means installed in a readily accessible location and capable of being locked open (NEC 625.43).
  • For New Castle County, the charger must be shown connected and fastened in place according to the manufacturer's installation instructions, whether it is hardwired or a plug in unit on a dedicated receptacle (NEC 625.44).

General submittal guidance from National Electrical Code (NFPA 70), Article 625 Electric Vehicle Charging System and Article 220 Load Calculations, 2017 to 2023 editions. Source. New Castle County Department of Land Use sets the exact checklist for New Castle County.

Where to apply in New Castle County:

New Castle County Department of Land Use

  • New Castle County Government Center, 87 Reads Way, New Castle, DE 19720
  • Phone: 302-395-5400
  • Email: permits@newcastlede.gov

EV Charger Permit in New Castle County compared with nearby Delaware localities

LocalityPermit needed?ThresholdWhat each Delaware schedule saysVerified
New Castle CountyPermit requiredAny sizeSee schedule
Sussex CountyPermit requiredAny sizeSee schedule

Inspections and closing out your permit

In New Castle County, a Level 2 EV charger installation gets a rough wiring inspection if any new conductors will be hidden inside walls, ceilings, or run underground, then a final inspection that checks the dedicated circuit, breaker sizing, any required GFCI protection, the disconnect, and the charger's listing before the permit closes.

  1. In New Castle County: if new EVSE conductors will be concealed in a wall or ceiling, or run underground, they must pass a rough wiring inspection before being covered, since that inspection confirms the dedicated branch circuit required for the charger (NEC 625.40).
  2. In New Castle County: at final inspection, the breaker or other overcurrent device serving the charger is checked to confirm it is properly rated for the continuous EV charging load (NEC 625.41).
  3. In New Castle County: any receptacle installed for EV charging, as opposed to a hardwired connection, has to be checked for ground fault circuit interrupter protection (NEC 625.54).
  4. In New Castle County: where the EVSE is rated over 60 amps or 150 volts to ground, the inspector confirms a lockable, readily accessible disconnecting means was installed (NEC 625.43).
  5. In New Castle County: the inspector verifies the charger, along with its fittings and associated equipment, carries a nationally recognized testing laboratory listing (NEC 625.5).
  6. In New Castle County: mounting height is checked against the manufacturer's instructions, with the coupling means generally required to sit at least 18 inches above an indoor floor or 24 inches above outdoor grade unless the equipment is listed otherwise (NEC 625.50).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the New Castle County permit portal or by phone at 302-395-5400.

Inspection sequence from National Electrical Code (NFPA 70), Article 625 Electric Vehicle Charging System, 2017 to 2023 editions. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need an EV charger permit in New Castle County?
New Castle County exempts electric vehicle charging stations from its building permit and does not permit or inspect electrical work at all. The circuit for a home EV charger is electrical work, which in Delaware must be inspected by a State-licensed electrical inspection agency; an owner-occupant doing it themselves needs a State homeowner electrical permit. Always confirm with the New Castle County Department of Land Use before starting.
How much does an EV charger permit cost in New Castle County?
Set by the State-licensed electrical inspection agency; no County fee (EV charging stations are exempt from the County permit). See the official fee schedule for current amounts.
Where do you apply for an EV charger permit in New Castle County?
You can apply through the New Castle County permit portal or contact the New Castle County Department of Land Use directly. The links are listed on this page.
Can a homeowner pull an EV charger permit themselves in New Castle County?
Under Delaware law (9 Del. C. 6302(b); 9 Del. C. 4402(b); 24 Del. C. 1417; 24 Del. C. 1807(c)(2); 24 Del. C. 1820(c)(2); 16 Del. C. 7906(c)): Yes. Delaware homeowners may pull permits and do their own work, with trade-specific conditions. Sussex County's statute expressly lets any owner who wants to do their own work on their own building get a permit, and Kent County issues permits in the owner's name. For electrical work, a homeowner wiring their own home that is not for sale or rent must get a homeowner's permit from the Board of Electrical Examiners and pass a final inspection; swimming pools and hot tubs are excluded. Homeowners may do their own plumbing and HVACR work (but not gas piping) in their own home that is not for sale, rent or lease, and for plumbing must file a permit application with the inspection authority. Confirm how New Castle County applies this before you apply.

From the Library

What else needs a permit in New Castle County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsFinish work (tiling, cabinets, counter tops) and in-place fixture reinstallation are exempt; new or moved plumbing, walls or circuits are not11/04/2025): "Building Permit Fee: $12 per $1,000 of Valuation ($142 Minimum)"...
Deck PermitIt dependsFloor area of a free-standing deck no more than 30 inches above grade and not adjacent to or attached to the dwelling11/04/2025): "Building Permit Fee: $12 per $1,000 of Valuation ($142 Minimum)"...
Electrical PermitPermit requiredAny sizeSee schedule
Fence PermitIt dependsOnly fences that serve as swimming pool barriers need a permitNot published
HVAC PermitPermit requiredAny size...6 Schedule of Permit and Review Fees, as amended through January 1, 2026): $5.25...
Patio PermitIt dependsHeight of a non-structural slab, patio or decorative hardscaping at any pointNot published
Plumbing PermitPermit requiredAny size...6 Schedule of Permit and Review Fees, as amended through January 1, 2026): $5.25...
Pool PermitIt dependsPool, spa or hot tub wall height; any pool designed to connect to a circulation system needs a permit regardless of height11/04/2025): "Building Permit Fee: $12 per $1,000 of Valuation ($142 Minimum)"...
Roof Replacement PermitIt dependsShare of the roof sheathing repaired or replaced during a re-roof11/04/2025): "Building Permit Fee: $12 per $1,000 of Valuation ($142 Minimum)"...
Shed PermitIt dependsFloor area of a one-story detached accessory structure with an eave height of 10 feet or less and overall height of 20 feet or less; garages never qualify11/04/2025): "Building Permit Fee: $12 per $1,000 of Valuation ($142 Minimum)"...
Solar PermitIt dependsRooftop panels on a one- or two-family dwelling are exempt from the County building permit; electrical work still goes through the StateNot published
Water Heater PermitPermit requiredAny size...6 Schedule of Permit and Review Fees, as amended through January 1, 2026): $5.25...

EV Charger Permit in other Delaware localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not New Castle County documents; the office above sets the local rules.

How this EV charger permit page for New Castle County was verified. 1 official source: newcastlede.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with New Castle County Department of Land Use. Rules change; confirm before you build. How we verify.