Delaware / Sussex County

EV Charger Permit in Sussex County, Delaware

Permit required

Yes, a permit is required

When installing a new circuit or charger.

Confirmed on official page Verified

Issued bySussex County Building Permit Office and Building Code Office

By Mario Bailey, verified against official sources

Quick answer

Sussex County issues no electrical permits. A home EV charger circuit is electrical work, and Delaware law requires all electrical work to receive a certificate of inspection from a Board-licensed inspection agency, applied for within 5 working days of starting.

Who is pulling this permit?

Hire it out

Sponsored

A licensed electrician typically pulls the electrical permit as part of the install. If you have not picked one yet, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

When a permit is usually needed

When installing a new circuit or charger.

What an EV charger permit costs in Sussex County

Line item
EV charger permitBy formulaSet by the licensed inspection agency; no county fee.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Sussex County

In Sussex County, in most of the US, installing a Level 2 (240 volt) home EV charger is handled as an electrical permit built around a load calculation and a single line diagram showing the new dedicated circuit. A Level 1 charger that simply plugs into an existing 120 volt outlet typically needs no permit unless new wiring is added.

What most EV charger permit applications include:

  • For Sussex County, a Level 2 charger needs its own dedicated 240 volt circuit and requires an electrical permit with inspection, since each outlet installed for EV charging must be fed by an individual branch circuit with no other outlets on it (NEC 625.40).
  • For Sussex County, the application includes an electrical load calculation showing the existing service panel has enough spare capacity for the added EVSE demand, worked out using the standard dwelling load calculation method (NEC 220.83).
  • For Sussex County, the breaker or other overcurrent device feeding the charger must be sized for continuous duty, rated at not less than 125 percent of the equipment's maximum load (NEC 625.41).
  • Plan submittal typically includes a single line diagram showing conductor size, breaker size, conduit, and panel rating, plus the charger's manufacturer specifications, since the EVSE itself must be a listed product (NEC 625.5).
  • For charging equipment rated over 60 amps or over 150 volts to ground, the application has to show a disconnecting means installed in a readily accessible location and capable of being locked open (NEC 625.43).
  • For Sussex County, the charger must be shown connected and fastened in place according to the manufacturer's installation instructions, whether it is hardwired or a plug in unit on a dedicated receptacle (NEC 625.44).

General submittal guidance from National Electrical Code (NFPA 70), Article 625 Electric Vehicle Charging System and Article 220 Load Calculations, 2017 to 2023 editions. Source. Sussex County Building Permit Office and Building Code Office sets the exact checklist for Sussex County.

Where to apply in Sussex County:

Sussex County Building Permit Office and Building Code Office

EV Charger Permit in Sussex County compared with nearby Delaware localities

LocalityPermit needed?ThresholdWhat each Delaware schedule saysVerified
Sussex CountyPermit requiredAny sizeSee schedule
New Castle CountyPermit requiredAny sizeSee schedule

Inspections and closing out your permit

In Sussex County, a Level 2 EV charger installation gets a rough wiring inspection if any new conductors will be hidden inside walls, ceilings, or run underground, then a final inspection that checks the dedicated circuit, breaker sizing, any required GFCI protection, the disconnect, and the charger's listing before the permit closes.

  1. In Sussex County: if new EVSE conductors will be concealed in a wall or ceiling, or run underground, they must pass a rough wiring inspection before being covered, since that inspection confirms the dedicated branch circuit required for the charger (NEC 625.40).
  2. In Sussex County: at final inspection, the breaker or other overcurrent device serving the charger is checked to confirm it is properly rated for the continuous EV charging load (NEC 625.41).
  3. In Sussex County: any receptacle installed for EV charging, as opposed to a hardwired connection, has to be checked for ground fault circuit interrupter protection (NEC 625.54).
  4. In Sussex County: where the EVSE is rated over 60 amps or 150 volts to ground, the inspector confirms a lockable, readily accessible disconnecting means was installed (NEC 625.43).
  5. In Sussex County: the inspector verifies the charger, along with its fittings and associated equipment, carries a nationally recognized testing laboratory listing (NEC 625.5).
  6. In Sussex County: mounting height is checked against the manufacturer's instructions, with the coupling means generally required to sit at least 18 inches above an indoor floor or 24 inches above outdoor grade unless the equipment is listed otherwise (NEC 625.50).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Sussex County permit portal or by phone at (302) 855-7720.

Inspection sequence from National Electrical Code (NFPA 70), Article 625 Electric Vehicle Charging System, 2017 to 2023 editions. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need an EV charger permit in Sussex County?
Sussex County issues no electrical permits. A home EV charger circuit is electrical work, and Delaware law requires all electrical work to receive a certificate of inspection from a Board-licensed inspection agency, applied for within 5 working days of starting. Always confirm with the Sussex County Building Permit Office and Building Code Office before starting.
How much does an EV charger permit cost in Sussex County?
Set by the licensed inspection agency; no county fee. See the official fee schedule for current amounts.
Where do you apply for an EV charger permit in Sussex County?
You can apply through the Sussex County permit portal or contact the Sussex County Building Permit Office and Building Code Office directly. The links are listed on this page.
Can a homeowner pull an EV charger permit themselves in Sussex County?
Under Delaware law (9 Del. C. 6302(b); 9 Del. C. 4402(b); 24 Del. C. 1417; 24 Del. C. 1807(c)(2); 24 Del. C. 1820(c)(2); 16 Del. C. 7906(c)): Yes. Delaware homeowners may pull permits and do their own work, with trade-specific conditions. Sussex County's statute expressly lets any owner who wants to do their own work on their own building get a permit, and Kent County issues permits in the owner's name. For electrical work, a homeowner wiring their own home that is not for sale or rent must get a homeowner's permit from the Board of Electrical Examiners and pass a final inspection; swimming pools and hot tubs are excluded. Homeowners may do their own plumbing and HVACR work (but not gas piping) in their own home that is not for sale, rent or lease, and for plumbing must file a permit application with the inspection authority. Confirm how Sussex County applies this before you apply.

From the Library

What else needs a permit in Sussex County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsCosmetic finishes and like-for-like fixture swaps versus renovation, relocated or added plumbing, or new electrical work...County Building Permit Fee Guide: construction value (table rates such as...
Deck PermitPermit requiredAny size...County Building Permit Fee Guide: construction value (table rates such as...
Electrical PermitPermit requiredAny sizeSee schedule
Fence PermitPermit requiredAny size...County Building Permit Fee Guide: construction value (table rates such as...
HVAC PermitIt dependsReplacement of existing equipment versus a new installation or additional unit...County Building Permit Fee Guide: construction value (table rates such as...
Patio PermitPermit requiredAny size...County Building Permit Fee Guide: construction value (table rates such as...
Plumbing PermitPermit requiredAny sizeDivision of Public Health: $100 per plumbing permit (covers 3 inspections)
Pool PermitPermit requiredAny size...County Building Permit Fee Guide: construction value (table rates such as...
Roof Replacement PermitIt dependsPermit applies when the job includes structural sheathing or a change in roofing material...County Building Permit Fee Guide: construction value (table rates such as...
Shed PermitPermit requiredAny size...County Building Permit Fee Guide: construction value (table rates such as...
Solar PermitPermit requiredAny size...County Building Permit Fee Guide: construction value (table rates such as...
Water Heater PermitIt dependsReplacement of an existing water heater versus a new or relocated oneDPH plumbing permit $100 when one is required

EV Charger Permit in other Delaware localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Sussex County documents; the office above sets the local rules.

How this EV charger permit page for Sussex County was verified. 2 official sources: sussexcountyde.gov, delcode.delaware.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Sussex County Building Permit Office and Building Code Office. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare EV Charger Permit requirements across Delaware localities

EV charger permit rules nationwide

Permit required
Get quotes