Delaware / Sussex County

EV Charger Permit in Sussex County, Delaware

Permit required

Yes, a permit is required

When installing a new circuit or charger.

Quick answer

Sussex County issues no electrical permits. A home EV charger circuit is electrical work, and Delaware law requires all electrical work to receive a certificate of inspection from a Board-licensed inspection agency, applied for within 5 working days of starting.

Issued by
Sussex County Building Permit Office and Building Code Office
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

A licensed electrician typically pulls the electrical permit as part of the install. If you have not picked one yet, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an EV charger permit costs in Sussex County

Fee schedule in force
Official scheduleRead .

Set by the licensed inspection agency;

no county fee.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Sussex County

General guide, not specific to this office

What an EV charger permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an EV charger permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Sussex County Building Permit Office and Building Code Office

EV Charger Permit in Sussex County compared with nearby Delaware localities

LocalityPermit needed?ThresholdWhat each Delaware schedule saysVerified
Sussex CountyPermit requiredAny sizeSee schedule
New Castle CountyPermit requiredElectrical inspection by a State-licensed agency, or a State homeowner permit; New Castle County issues noneA home EV charger needs no permit from New Castle County, whose code exempts electric vehicle charging stations (Sec. 06.03.012.C)

Permitting activity in Sussex County

In 2025, Sussex County authorized permits for 3,885 new residential housing units (3,264 single-family, 621 in multi-family buildings), valued at $509M, down from 4,354 the year before. That works out to about 14 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 277,140.

What else needs a permit in Sussex County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsCosmetic finishes and like-for-like fixture swaps versus renovation, relocated or added plumbing, or new electrical workSee schedule
Deck PermitPermit requiredAny sizeSee schedule
Electrical PermitPermit requiredAny sizeSee schedule
Fence PermitPermit requiredAny sizeSee schedule
HVAC PermitIt dependsReplacement of existing equipment versus a new installation or additional unitSee schedule
Patio PermitPermit requiredAny sizeSee schedule
Plumbing PermitPermit requiredAny sizeDivision of Public Health: $100 per plumbing permit (covers 3 inspections)
Pool PermitPermit requiredAny sizeSee schedule
Roof Replacement PermitIt dependsPermit applies when the job includes structural sheathing or a change in roofing materialSee schedule
Shed PermitPermit requiredAny sizeSee schedule
Solar PermitPermit requiredAny sizeSee schedule
Water Heater PermitIt dependsReplacement of an existing water heater versus a new or relocated oneDPH plumbing permit $100 when one is required

Frequently asked questions

Do you need an EV charger permit in Sussex County?
Yes, when installing a new circuit or charger. If you are unsure how that applies to your project, call the Sussex County Building Permit Office and Building Code Office at (302) 855-7720 before you start.
How much does an EV charger permit cost in Sussex County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the Sussex County Building Permit Office and Building Code Office at (302) 855-7720.
Where do you apply for an EV charger permit in Sussex County?
You can apply through the Sussex County permit portal or contact the Sussex County Building Permit Office and Building Code Office directly. The links are listed on this page.
Can a homeowner pull an EV charger permit themselves in Sussex County?
Under Delaware law (9 Del. C. 6302(b); 9 Del. C. 4402(b); 24 Del. C. 1417; 24 Del. C. 1807(c)(2); 24 Del. C. 1820(c)(2); 16 Del. C. 7906(c)): Yes. Delaware homeowners may pull permits and do their own work, with trade-specific conditions. Sussex County's statute expressly lets any owner who wants to do their own work on their own building get a permit, and Kent County issues permits in the owner's name. For electrical work, a homeowner wiring their own home that is not for sale or rent must get a homeowner's permit from the Board of Electrical Examiners and pass a final inspection; swimming pools and hot tubs are excluded. Homeowners may do their own plumbing and HVACR work (but not gas piping) in their own home that is not for sale, rent or lease, and for plumbing must file a permit application with the inspection authority. Confirm how Sussex County applies this before you apply.

From the Library

EV Charger Permit in other Delaware localities

Everything above, sourced

How this EV charger permit page for Sussex County was verified. 2 official sources: sussexcountyde.gov, delcode.delaware.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Sussex County Building Permit Office and Building Code Office. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project