Virginia / Henrico County

Water Heater Permit in Henrico County, Virginia

By Mario Bailey Last checked 2026-07-12 · 1 official source

Verified against official sources Based on building code

It depends

Quick answer

A gas or oil fired water heater replacement requires a permit in Virginia: USBC Section 108.1 requires a permit for work on water supply and distribution or fuel supply systems, and water heaters are not in the exemption list (a water heater is an appliance, not a plumbing fixture, so the fixture-replacement exemption does not apply). For like-for-like electric units, exemption 108.2(14.4) covers replacement of mechanical appliances not fueled by gas or oil in dwellings, and whether an electric water heater qualifies is a local classification call. Practical rule: gas or oil fired, permit required; electric like-for-like, ask the locality.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help

Tell us where your project stands. Free to ask; no obligation.

Where we have a vetted local pro who handles permits in Henrico County, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

What water heater permit costs in Henrico County

Electric, gas and oil water heaters need a mechanical permit for new or replacement installs, billed at $100 for the first $5,000 of labor and material cost plus $6 per additional $1,000 plus a 2% state levy, per the county mechanical permit and fee pages.

Official fee schedule

How Henrico County compares in Virginia

No Virginia jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Chesterfield CountyIt dependsReplacing an electric water heater with a new electric unit needs no permit;
Fairfax CountyIt dependsBilled as a household appliance permit, $78.75 for one appliance per Ch.
Fauquier CountyIt dependsA gas water heater needs a trade permit at $84.15 including the technology fee;
Henrico Countythis pageIt dependsElectric, gas and oil water heaters need a mechanical permit for new or repla...
Loudoun CountyIt dependsNo dedicated line;
Orange CountyIt dependsNo water-heater line;
Prince William CountyIt dependsBilled under Plumbing as an appliance: base fee $88.44 ($110.65 with surcharg...

How to apply in Henrico County

Replacing a residential water heater needs a permit before work starts, because swapping the appliance counts as installing regulated plumbing and fuel gas work, not an exempt repair. The application itself stays light: it identifies the work and its location, and most offices only ask for extra fuel or capacity details when the replacement changes fuel type or input size.

What most water heater permit applications include:

  • A permit must be obtained before an owner or contractor installs, alters, or replaces any plumbing, fuel gas, or electrical system regulated by the code, which covers putting in a new water heater (IRC R105.1).
  • Water heater replacement is not on the code's short list of exempt plumbing work, and replacing defective piping with new material is expressly defined as new work that needs a permit and inspection (IRC R105.2).
  • The application itself only has to identify and describe the work and describe the location of the building or work, which is why most offices can process a water heater permit as a short form rather than a full plan set (IRC R105.3).
  • Once a complete application is on file, the building official must act on it and issue the permit as soon as practicable if the proposed work conforms to code, which is the basis for the same-day or next-business-day turnaround many permit offices offer for a straight swap (IRC R105.3.1).
  • The permit only stays valid if the work starts within the code's default window before it lapses, so scheduling the replacement and its inspection soon after the permit issues matters (IRC R105.5).

General submittal guidance from 2021 International Residential Code (IRC), Chapter 1, Section R105 (Permits). Source. Henrico County Department of Building Construction and Inspections sets the exact checklist for Henrico County.

Where to apply in Henrico County:

Henrico County Department of Building Construction and Inspections

  • 4301 East Parham Road, Henrico, VA 23228
  • Phone: (804) 501-4360

Inspections and closing out your permit

A water heater swap normally draws one inspection, a final, since the work is exposed rather than buried behind new framing. That single visit confirms the relief valve and its discharge pipe, thermal expansion control and seismic strapping where the installation requires them, and, on gas units, adequate combustion air and an approved vent connection.

  1. The lifecycle has one required visit, the final inspection, made after the permitted work is complete and before the water heater goes into service; because a straight swap conceals nothing behind framing, offices typically do not schedule a separate rough-in visit for it (IRC R109.1.6).
  2. The inspector confirms the water heater is protected by either a separate pressure relief valve and temperature relief valve, or one combination valve rated for the appliance (IRC P2804.1).
  3. The relief valve's discharge pipe is checked for an unobstructed, un-trapped gravity path that ends through an air gap no more than 6 inches above the floor or pan, since a wrong discharge pipe is one of the most common reasons a water heater fails inspection (IRC P2804.6.1).
  4. Where the water heater feeds a closed system, for instance behind a backflow preventer or check valve, the inspector looks for a thermal expansion control device sized to absorb the resulting pressure increase (IRC P2903.4.2).
  5. On a gas-fired unit, the inspector verifies the space provides enough combustion air, sized at 50 cubic feet per 1,000 Btu per hour of the appliance's input rating unless an engineered alternative method is used (IRC G2407.5.1).
  6. The gas unit's vent must tie into an approved venting system, which the inspector checks along with the vent's physical connections and support (IRC G2427.1, G2427.2).
  7. Where site conditions call for them, the inspector also checks for a drain pan under a tank whose leakage would cause damage, and for seismic strapping in the upper and lower thirds of the tank in the seismic design categories and townhouse conditions where the code requires it (IRC P2801.6; P2801.8).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Henrico County permit portal or by phone at (804) 501-4360.

Inspection sequence from 2021 International Residential Code (IRC), Chapters 24, 28, and 29 (Fuel Gas; Water Heaters; Water Supply and Distribution). Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a water heater permit in Henrico County?
A gas or oil fired water heater replacement requires a permit in Virginia: USBC Section 108.1 requires a permit for work on water supply and distribution or fuel supply systems, and water heaters are not in the exemption list (a water heater is an appliance, not a plumbing fixture, so the fixture-replacement exemption does not apply). For like-for-like electric units, exemption 108.2(14.4) covers replacement of mechanical appliances not fueled by gas or oil in dwellings, and whether an electric water heater qualifies is a local classification call. Practical rule: gas or oil fired, permit required; electric like-for-like, ask the locality. Always confirm with the Henrico County Department of Building Construction and Inspections before starting.
How much does a water heater permit cost in Henrico County?
Electric, gas and oil water heaters need a mechanical permit for new or replacement installs, billed at $100 for the first $5,000 of labor and material cost plus $6 per additional $1,000 plus a 2% state levy, per the county mechanical permit and fee pages. See the official fee schedule for current amounts.
Where do you apply for a water heater permit in Henrico County?
You can apply through the Henrico County permit portal or contact the Henrico County Department of Building Construction and Inspections directly. The links are listed on this page.
Can a homeowner pull a water heater permit themselves in Henrico County?
Under Virginia law (Va. Code 54.1-1101(A); 13VAC5-63-80 (USBC Sections 108.3, 108.4)): Yes. Va. Code 54.1-1101(A) exempts any person who performs or supervises construction, removal, repair, or improvement of no more than one primary residence owned by them and for their own use during any 24-month period. The exemption covers the whole licensing chapter, including tradesman licensing for electrical, plumbing, and HVAC, so it reaches trade work on the owner's own primary residence. Under the USBC the permit applicant may be the owner or the owner's agent, and an applicant may file a written statement that they are not subject to licensure instead of proof of license. Limits: one primary residence per 24 months, for the owner's own use; rental and investment property work is not covered. Confirm how Henrico County applies this before you apply.

From the Library

What else needs a permit in Henrico County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsNot specifiedFalls under the existing-dwelling building permit formula of $100 for the first $5,000...
Deck PermitPermit requiredNot specifiedExisting-dwelling addition or alteration permit fee applies: $100 for the first $5,000...
Electrical PermitPermit requiredNot specifiedExisting-dwelling trade permit fee applies: $100 for the first $5,000 of labor and mate...
EV Charger PermitPermit requiredNot specifiedNo EV-specific fee;
Fence PermitIt dependsfences 7 feet or less in height that do not serve as a swimming pool barrier are exempt; taller fences and any fence serving as a pool barrier require a building permitFences up to 7 feet that are not a pool barrier need no permit;
HVAC PermitPermit requiredNot specifiedExisting-dwelling trade permit fee applies: $100 for the first $5,000 of labor and mate...
Patio PermitIt dependson-grade concrete or paver patios are exempt; a permit is required for a patio cover, roofed patio structure, or an addition built over or attached to the patioNo permit fee;
Plumbing PermitPermit requiredNot specifiedExisting-dwelling trade permit fee applies: $100 for the first $5,000 of labor and mate...
Pool PermitIt dependspools, hot tubs, or spas with a surface area greater than 150 sq ft, more than 5,000 gallons, or 24 inches or more deep require a building permit; smaller and shallower pools are exemptExisting-dwelling addition or alteration permit fee applies to swimming pools requiring...
Roof Replacement PermitIt dependslike-for-like replacement of roof covering on one- and two-family homes is exempt in areas with nominal design wind speed of 100 mph or less; a permit is required when more than 256 sq ft of roof sheathing (decking) is repaired or replaced and may be required in historic districts or flood hazard areasRoof covering replacement is exempt in unlimited amounts so typical reroofing needs no...
Shed PermitIt dependssheds and playhouses over 256 sq ft or more than one story require a building permit; 256 sq ft or less and only one story is exemptSheds of 256 sq ft or less and one story need no permit;
Solar PermitPermit requiredNot specifiedResidential solar needs only an electrical permit with no separate building permit per...

Water Heater Permit in other Virginia localities

Official sources

Verified by a person against the sources above on 2026-07-12, not confirmed with Henrico County Department of Building Construction and Inspections. Rules change; confirm before you build. How we verify.

Last checked: 2026-07-12Report an error on this page

Compare Water Heater Permit requirements across Virginia localities