Virginia / Henrico County

HVAC Permit in Henrico County, Virginia

Permit required

Yes, a permit is required

For new HVAC installations and replacement of gas- or oil-fueled equipment

Confirmed on official page Verified

Issued byHenrico County Department of Building Construction and Inspections

By Mario Bailey, verified against official sources

Quick answer

A mechanical permit is required in Henrico County for new HVAC installations, including centralized air-conditioning systems and heat pumps, and for replacing gas- or oil-fueled equipment such as furnaces and water heaters, per the county's own Permit Center guidance. Replacing a mechanical appliance that is not gas or oil fueled, such as an electric heat pump, is exempt.

Who is pulling this permit?

Hire it out

Sponsored

HVAC contractors usually pull this permit as part of the job. If you have not picked one yet, compare a few quotes before you commit.

Compare HVAC contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

When a permit is usually needed

For new HVAC installations and replacement of gas- or oil-fueled equipment

What an HVAC permit costs in Henrico County

Line item
HVAC permitBy formulaExisting-dwelling trade permit fee applies: $100 for the first $5,000 of labor and materials cost, plus $6 per additional $1,000 or fraction thereof, plus a 2% state levy; a new-dwelling trade permit is a $100 flat fee plus $2 state levy ($102 total), per Henrico's residential trade permit fee schedule.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Henrico County compares in Virginia

No Virginia jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Arlington CountyPermit requiredFees per FY27 ISD fee schedule
Chesterfield CountyPermit required$114 for a new HVAC system installation or system replacement with new ductwork
Fairfax CountyPermit requiredDirect replacement of HVAC equipment is a household appliance permit, $78.75...
Fauquier CountyIt dependsA single-trade mechanical permit is $84.15 including the technology fee at the...
Henrico Countythis pagePermit requiredExisting-dwelling trade permit fee applies: $100 for the first $5,000 of labor...
Loudoun CountyPermit requiredBase Mechanical Permit fee for adding, replacing or relocating central heating...
Orange CountyPermit requiredBilled under the residential Trades category for mechanical work at $0.15 per...

How to apply in Henrico County

In Henrico County, a residential HVAC (mechanical) permit application must identify the covered equipment and scope of work, since installing, altering, or replacing a heating or cooling system is regulated work that cannot start until the application is submitted and the permit issued. The equipment itself must be picked by a real sizing calculation rather than a rule of thumb.

What most HVAC permit applications include:

  • For Henrico County, a mechanical permit is required before anyone may install, alter, repair, remove, convert, or replace a heating, ventilating, or air conditioning system regulated by the code, and the work may not begin until the application is submitted and the permit is issued (IRC R105.1).
  • For Henrico County, the application identifies the specific equipment being installed, such as a furnace, heat pump, or air conditioner, since the unit must be installed according to its listing and the manufacturer's installation instructions (IRC M1401.1).
  • For Henrico County, the proposed equipment location must leave the clearances needed to clean coils and replace filters, blowers, motors, and controls after installation (IRC M1401.2).
  • For Henrico County, the application carries the equipment sizing basis: ACCA Manual J building loads and Manual S equipment selection, or another approved sizing method, not a rule of thumb (IRC M1401.3).
  • For a split system, the work covered by the permit includes refrigerant suction line insulation, since the piping is inspected against that standard once installed (IRC M1411.6).

General submittal guidance from International Residential Code (IRC), 2021 edition, Chapter 1 (Permits) and Chapter 14 (Heating and Cooling Equipment and Appliances). Source. Henrico County Department of Building Construction and Inspections sets the exact checklist for Henrico County.

Where to apply in Henrico County:

Henrico County Department of Building Construction and Inspections

  • 4301 East Parham Road, Henrico, VA 23228
  • Phone: (804) 501-4360

HVAC Permit in Henrico County compared with nearby Virginia localities

LocalityPermit needed?ThresholdWhat each Virginia schedule saysVerified
Henrico CountyPermit requiredNot specifiedExisting-dwelling trade permit fee applies: $100 for the first $5,000 of labor and...
Arlington CountyPermit requiredReplacement of mechanical equipment of the same type, size and location is exempt unless the equipment is fueled by gas, in which case a Plumbing/Gas Permit is required; outdoor equipment locations still need zoning approval.Fees per FY27 ISD fee schedule
Chesterfield CountyPermit requiredNot specified$114 for a new HVAC system installation or system replacement with new ductwork
Culpeper CountyIt dependsNot specifiedNot published
Fairfax CountyPermit requiredNot specifiedDirect replacement of HVAC equipment is a household appliance permit, $78.75 for one...

Inspections and closing out your permit

In Henrico County, mechanical work gets a rough in inspection after the ductwork, refrigerant lines, and gas piping are in but before they are covered or concealed, followed by a final inspection that confirms the equipment operates correctly and its clearances, combustion air, and condensate disposal are in place. A straight equipment changeout with no new ductwork commonly gets a single final inspection instead of a separate rough in trip.

  1. In Henrico County: rough inspection of the mechanical and gas systems must be made before the work is covered or concealed, before fixtures or appliances are set or installed, and before the framing inspection (IRC R109.1.2).
  2. In Henrico County: where a cooling coil is added to an existing warm air furnace, the rough in confirms the coil is not installed upstream of the heat exchanger unless the furnace is listed for it, and that the blower can handle the added static pressure (IRC M1411.2).
  3. In Henrico County: the rough in and final both confirm the appliance access opening and working space are large enough to service the unit (IRC M1305.1).
  4. In Henrico County: at final inspection, the inspector verifies the equipment has adequate combustion air, with openings kept clear for the distance the code requires (IRC M1402.3).
  5. In Henrico County: final inspection also checks that the condensate line drains to an approved point of disposal with the required slope and does not create a nuisance (IRC M1411.3).
  6. In Henrico County: for a straight equipment changeout with no new ductwork, many permit offices require only a single final inspection, while a new installation still gets a rough in inspection before the final (common local inspection practice).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Henrico County permit portal or by phone at (804) 501-4360.

Inspection sequence from International Residential Code (IRC), 2021 edition, Section R109 (Required Inspections) and Chapter 14 (Heating and Cooling Equipment and Appliances). Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need an HVAC permit in Henrico County?
A mechanical permit is required in Henrico County for new HVAC installations, including centralized air-conditioning systems and heat pumps, and for replacing gas- or oil-fueled equipment such as furnaces and water heaters, per the county's own Permit Center guidance. Replacing a mechanical appliance that is not gas or oil fueled, such as an electric heat pump, is exempt. Always confirm with the Henrico County Department of Building Construction and Inspections before starting.
How much does an HVAC permit cost in Henrico County?
Existing-dwelling trade permit fee applies: $100 for the first $5,000 of labor and materials cost, plus $6 per additional $1,000 or fraction thereof, plus a 2% state levy; a new-dwelling trade permit is a $100 flat fee plus $2 state levy ($102 total), per Henrico's residential trade permit fee schedule. See the official fee schedule for current amounts.
Where do you apply for an HVAC permit in Henrico County?
You can apply through the Henrico County permit portal or contact the Henrico County Department of Building Construction and Inspections directly. The links are listed on this page.
Can a homeowner pull an HVAC permit themselves in Henrico County?
Under Virginia law (Va. Code 54.1-1101(A); 13VAC5-63-80 (USBC Sections 108.3, 108.4)): Yes. Va. Code 54.1-1101(A) exempts any person who performs or supervises construction, removal, repair, or improvement of no more than one primary residence owned by them and for their own use during any 24-month period. The exemption covers the whole licensing chapter, including tradesman licensing for electrical, plumbing, and HVAC, so it reaches trade work on the owner's own primary residence. Under the USBC the permit applicant may be the owner or the owner's agent, and an applicant may file a written statement that they are not subject to licensure instead of proof of license. Limits: one primary residence per 24 months, for the owner's own use; rental and investment property work is not covered. Confirm how Henrico County applies this before you apply.

From the Library

What else needs a permit in Henrico County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsNot specifiedFalls under the existing-dwelling building permit formula of $100 for the first $5,000...
Deck PermitPermit requiredNot specifiedExisting-dwelling addition or alteration permit fee applies: $100 for the first $5,000...
Electrical PermitPermit requiredNot specifiedExisting-dwelling trade permit fee applies: $100 for the first $5,000 of labor and...
EV Charger PermitPermit requiredNot specifiedNo EV-specific fee
Fence PermitIt dependsfences 7 feet or less in height that do not serve as a swimming pool barrier are exempt; taller fences and any fence serving as a pool barrier require a building permitFences up to 7 feet that are not a pool barrier need no permit
Patio PermitIt dependson-grade concrete or paver patios are exempt; a permit is required for a patio cover, roofed patio structure, or an addition built over or attached to the patioNo permit fee
Plumbing PermitPermit requiredNot specifiedExisting-dwelling trade permit fee applies: $100 for the first $5,000 of labor and...
Pool PermitIt dependspools, hot tubs, or spas with a surface area greater than 150 sq ft, more than 5,000 gallons, or 24 inches or more deep require a building permit; smaller and shallower pools are exemptExisting-dwelling addition or alteration permit fee applies to swimming pools requiring...
Roof Replacement PermitIt dependslike-for-like replacement of roof covering on one- and two-family homes is exempt in areas with nominal design wind speed of 100 mph or less; a permit is required when more than 256 sq ft of roof sheathing (decking) is repaired or replaced and may be required in historic districts or flood hazard areasRoof covering replacement is exempt in unlimited amounts so typical reroofing needs no...
Shed PermitIt dependssheds and playhouses over 256 sq ft or more than one story require a building permit; 256 sq ft or less and only one story is exemptSheds of 256 sq ft or less and one story need no permit
Solar PermitPermit requiredNot specifiedResidential solar needs only an electrical permit with no separate building permit per...
Water Heater PermitIt dependsNot specifiedElectric, gas and oil water heaters need a mechanical permit for new or replacement...

HVAC Permit in other Virginia localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Henrico County documents; the office above sets the local rules.

How this HVAC permit page for Henrico County was verified. 3 official sources: law.lis.virginia.gov, henrico.gov, henrico.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Henrico County Department of Building Construction and Inspections. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare HVAC Permit requirements across Virginia localities

HVAC permit rules nationwide

Look up an existing Henrico County permit record

Permit required
Get quotes