Kentucky / Louisville

EV Charger Permit in Louisville, Kentucky

Permit required

Yes, a permit is required

Before adding the circuit for a hardwired or 240-volt charger.

From an official source Verified

Issued byLouisville Metro Develop Louisville, Office of Construction Review (Codes and Regulations)

By Mario Bailey, verified against official sources

Quick answer

Louisville Metro publishes nothing EV-specific; its electrical rule decides it. Adding a new circuit or wiring for an appliance is one of Metro's own examples of work that requires an electrical permit, so a charger on a new 240-volt circuit needs a Louisville Metro electrical permit and inspection.

Who is pulling this permit?

Hire it out

Sponsored

A licensed electrician typically pulls the electrical permit as part of the install. If you have not picked one yet, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

When a permit is usually needed

Before adding the circuit for a hardwired or 240-volt charger.

What an EV charger permit costs in Louisville

Line item
EV charger permitBy formulaLMCO 150.096 (revised 2/6/2024): additional wiring in a one- or two-family residence is $75 for work costing $750 or less and $100 for work over $750.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Louisville

In Louisville, in most of the US, installing a Level 2 (240 volt) home EV charger is handled as an electrical permit built around a load calculation and a single line diagram showing the new dedicated circuit. A Level 1 charger that simply plugs into an existing 120 volt outlet typically needs no permit unless new wiring is added.

What most EV charger permit applications include:

  • For Louisville, a Level 2 charger needs its own dedicated 240 volt circuit and requires an electrical permit with inspection, since each outlet installed for EV charging must be fed by an individual branch circuit with no other outlets on it (NEC 625.40).
  • For Louisville, the application includes an electrical load calculation showing the existing service panel has enough spare capacity for the added EVSE demand, worked out using the standard dwelling load calculation method (NEC 220.83).
  • For Louisville, the breaker or other overcurrent device feeding the charger must be sized for continuous duty, rated at not less than 125 percent of the equipment's maximum load (NEC 625.41).
  • Plan submittal typically includes a single line diagram showing conductor size, breaker size, conduit, and panel rating, plus the charger's manufacturer specifications, since the EVSE itself must be a listed product (NEC 625.5).
  • For charging equipment rated over 60 amps or over 150 volts to ground, the application has to show a disconnecting means installed in a readily accessible location and capable of being locked open (NEC 625.43).
  • For Louisville, the charger must be shown connected and fastened in place according to the manufacturer's installation instructions, whether it is hardwired or a plug in unit on a dedicated receptacle (NEC 625.44).

General submittal guidance from National Electrical Code (NFPA 70), Article 625 Electric Vehicle Charging System and Article 220 Load Calculations, 2017 to 2023 editions. Source. Louisville Metro Develop Louisville, Office of Construction Review (Codes and Regulations) sets the exact checklist for Louisville.

Where to apply in Louisville:

Louisville Metro Develop Louisville, Office of Construction Review (Codes and Regulations)

  • 444 S. 5th Street, Louisville, KY 40202
  • Phone: (502) 574-3321

EV Charger Permit in Louisville compared with nearby Kentucky localities

LocalityPermit needed?ThresholdWhat each Kentucky schedule saysVerified
LouisvillePermit requiredAny size...(revised 2/6/2024): additional wiring in a one- or two-family residence is $75 for...
LexingtonPermit requiredAny sizeLFUCG electrical page: "Electrical permits cost $10 each." Inspection fees are set by...

Inspections and closing out your permit

In Louisville, a Level 2 EV charger installation gets a rough wiring inspection if any new conductors will be hidden inside walls, ceilings, or run underground, then a final inspection that checks the dedicated circuit, breaker sizing, any required GFCI protection, the disconnect, and the charger's listing before the permit closes.

  1. In Louisville: if new EVSE conductors will be concealed in a wall or ceiling, or run underground, they must pass a rough wiring inspection before being covered, since that inspection confirms the dedicated branch circuit required for the charger (NEC 625.40).
  2. In Louisville: at final inspection, the breaker or other overcurrent device serving the charger is checked to confirm it is properly rated for the continuous EV charging load (NEC 625.41).
  3. In Louisville: any receptacle installed for EV charging, as opposed to a hardwired connection, has to be checked for ground fault circuit interrupter protection (NEC 625.54).
  4. In Louisville: where the EVSE is rated over 60 amps or 150 volts to ground, the inspector confirms a lockable, readily accessible disconnecting means was installed (NEC 625.43).
  5. In Louisville: the inspector verifies the charger, along with its fittings and associated equipment, carries a nationally recognized testing laboratory listing (NEC 625.5).
  6. In Louisville: mounting height is checked against the manufacturer's instructions, with the coupling means generally required to sit at least 18 inches above an indoor floor or 24 inches above outdoor grade unless the equipment is listed otherwise (NEC 625.50).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Louisville permit portal or by phone at (502) 574-3321.

Inspection sequence from National Electrical Code (NFPA 70), Article 625 Electric Vehicle Charging System, 2017 to 2023 editions. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need an EV charger permit in Louisville?
Louisville Metro publishes nothing EV-specific; its electrical rule decides it. Adding a new circuit or wiring for an appliance is one of Metro's own examples of work that requires an electrical permit, so a charger on a new 240-volt circuit needs a Louisville Metro electrical permit and inspection. Always confirm with the Louisville Metro Develop Louisville, Office of Construction Review (Codes and Regulations) before starting.
How much does an EV charger permit cost in Louisville?
LMCO 150.096 (revised 2/6/2024): additional wiring in a one- or two-family residence is $75 for work costing $750 or less and $100 for work over $750. See the official fee schedule for current amounts.
Where do you apply for an EV charger permit in Louisville?
You can apply through the Louisville permit portal or contact the Louisville Metro Develop Louisville, Office of Construction Review (Codes and Regulations) directly. The links are listed on this page.
Can a homeowner pull an EV charger permit themselves in Louisville?
Under Kentucky law (815 KAR 20:050, Section 2(1)(b); KRS 227A.030(3); KRS 227.480(2)(a); KRS 198B.674(3); KRS 198B.060(1)): Kentucky has no state general or residential contractor license, so no state license stands between a homeowner and building their own house; whether a building permit is needed at all for a single-family home depends on local ordinance (KRS 198B.060(1)). The licensed trades each carry a homeowner exemption. A homeowner may get a state plumbing permit for their own home if they apply before starting, file an affidavit, personally do all the work, and have not taken another homeowner permit for a new home in the last five years. The electrical licensing law does not stop a homeowner or farmer from wiring their own property (KRS 227A.030(3)), and an electrical permit may issue to them without proof of a contractor license (KRS 227.480(2)(a)); the HVAC licensing law does not apply to an owner working on property they own and occupy (KRS 198B.674(3)). Confirm how Louisville applies this before you apply.

From the Library

What else needs a permit in Louisville

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsWhen adding a bathroom, moving plumbing fixtures, or adding wiringMetro building permit for a partial alteration: $50 plus $2.50 per $1,000 of estimated...
Deck PermitIt dependsarea of a freestanding deck; an attached deck always needs a permit...(revised 2/6/2024): partial alterations and structures other than buildings are $50...
Electrical PermitPermit requiredAny size...new service, repairs or additional wiring in a one- or two-family residence is $75...
Fence PermitIt dependsfence height (retaining walls: over 4 feet)...(revised 2/6/2024): partial alterations and structures other than buildings are $50...
HVAC PermitPermit requiredAny size...fees (revised 2/6/2024): 1 & 2 family dwellings, new and replacement systems, $105...
Patio PermitNo permit neededExemptNot published
Plumbing PermitPermit requiredAny size...Section 4): base fee for a one- or two-family residential plumbing permit is $50.00...
Pool PermitIt dependsBefore installing an in-ground pool, or a raised deck beside an above-ground pool...(revised 2/6/2024): partial alterations and structures other than buildings are $50...
Roof Replacement PermitIt dependsOnly when structural elements such as the roof deck or rafters are replaced...(revised 2/6/2024): partial alterations and structures other than buildings are $50...
Shed PermitIt dependsfloor area of the accessory structure...(revised 2/6/2024): partial alterations and structures other than buildings are $50...
Solar PermitPermit requiredAny sizePer Metro's solar guide: fees for electrical start at $50 and for simplified building...
Water Heater PermitPermit requiredAny size...replaced within a single building, the only fee for the plumbing permit is...

EV Charger Permit in other Kentucky localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Louisville documents; the office above sets the local rules.

How this EV charger permit page for Louisville was verified. 2 official sources: louisvilleky.gov, web.archive.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Louisville Metro Develop Louisville, Office of Construction Review (Codes and Regulations). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page