Kentucky / Louisville

Solar Permit in Louisville, Kentucky

Permit required

Yes, a permit is required

Before installing any solar system: an electrical permit always, plus a simplified building permit for roof-mounted systems.

Quick answer

Louisville Metro requires permits for every solar installation under the Kentucky Building Code. Ground-mounted systems need only an electrical permit; roof-mounted systems need an electrical permit and a simplified building permit with a scaled roof diagram showing framing and the manufacturer's specifications. Systems must also meet Land Development Code Section 4.3.16, and installations in preservation districts need a Certificate of Appropriateness.

Issued by
Louisville Metro Develop Louisville, Office of Construction Review (Codes and Regulations)
From an official source Verified

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?

Kentucky's owner-builder rule (815 KAR 20:050, Section 2(1)(b); KRS 227A.030(3); KRS 227.480(2)(a); KRS 198B.674(3); KRS 198B.060(1)) sets what you may do on your own home without hiring anyone. Read the statute.

What a solar permit costs in Louisville

Fee schedule in force
Official scheduleRead .

Louisville Metro's Permit Fees page (LMCO 150.096) publishes no solar line item.

Its electrical fee for additional wiring in a one- or two-family home is $75 when the work costs $750 or less and $100 when it costs more, and building work that cannot be priced by square footage is $50 plus $2.50 for every $1,000 of the estimated cost, with no building permit fee below $75.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Louisville

General guide, not specific to this office

What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Louisville Metro Develop Louisville, Office of Construction Review (Codes and Regulations)

  • 444 S. 5th Street, Louisville, KY 40202
  • Phone: (502) 574-3321

Solar Permit in Louisville compared with nearby Kentucky localities

LocalityPermit needed?ThresholdWhat each Kentucky schedule saysVerified
LouisvillePermit requiredAny sizeSee schedule
LexingtonPermit requiredAny sizeNot published

What else needs a permit in Louisville

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsWhen adding a bathroom, moving plumbing fixtures, or adding wiringSee schedule
Deck PermitIt dependsarea of a freestanding deck; an attached deck always needs a permitSee schedule
Electrical PermitPermit requiredAny sizeSee schedule
EV Charger PermitPermit requiredAny sizeSee schedule
Fence PermitIt dependsfence height (retaining walls: over 4 feet)See schedule
HVAC PermitPermit requiredAny sizeSee schedule
Patio PermitNo permit neededExemptNot published
Plumbing PermitPermit requiredAny sizeSee schedule
Pool PermitIt dependsBefore installing an in-ground pool, or a raised deck beside an above-ground poolSee schedule
Roof Replacement PermitIt dependsOnly when structural elements such as the roof deck or rafters are replacedSee schedule
Shed PermitIt dependsfloor area of the accessory structureSee schedule
Water Heater PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need a solar permit in Louisville?
Yes, before installing any solar system: an electrical permit always, plus a simplified building permit for roof-mounted systems. If you are unsure how that applies to your project, call the permit office at (502) 574-3321 before you start.
How much does a solar permit cost in Louisville?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the permit office at (502) 574-3321.
How long does a solar permit take in Louisville?
Most building and electrical permits are turned around in three days or less; electrical permits issue the same day, and Metro says to anticipate four to five business days for complete review of the simplified building permit. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a solar permit in Louisville?
You can apply through the Louisville permit portal or contact the Louisville Metro Develop Louisville, Office of Construction Review (Codes and Regulations) directly. The links are listed on this page.
Can a homeowner pull a solar permit themselves in Louisville?
Under Kentucky law (815 KAR 20:050, Section 2(1)(b); KRS 227A.030(3); KRS 227.480(2)(a); KRS 198B.674(3); KRS 198B.060(1)): Kentucky has no state general or residential contractor license, so no state license stands between a homeowner and building their own house; whether a building permit is needed at all for a single-family home depends on local ordinance (KRS 198B.060(1)). The licensed trades each carry a homeowner exemption. A homeowner may get a state plumbing permit for their own home if they apply before starting, file an affidavit, personally do all the work, and have not taken another homeowner permit for a new home in the last five years. The electrical licensing law does not stop a homeowner or farmer from wiring their own property (KRS 227A.030(3)), and an electrical permit may issue to them without proof of a contractor license (KRS 227.480(2)(a)); the HVAC licensing law does not apply to an owner working on property they own and occupy (KRS 198B.674(3)). Confirm how Louisville applies this before you apply.

From the Library

Solar Permit in other Kentucky localities

Everything above, sourced

How this solar permit page for Louisville was verified. 2 official sources: louisvilleky.gov, web.archive.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Louisville Metro Develop Louisville, Office of Construction Review (Codes and Regulations). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project