Plumbing Permit in Overland Park, Kansas
Permit required
Yes, a permit is required
Before the work starts.
Issued byCity of Overland Park Planning and Development Services, Building Safety Division
By Mario Bailey, verified against official sources
Quick answer
Overland Park requires a plumbing permit for new or extended water lines, additional fixtures, repairs under floors and repairs that change materials; water heaters and gas lines have their own permits. Replacing existing plumbing fixtures is routine maintenance needing no permit, and general exterior water line replacement needs none (call WaterOne first). Sewer connection permits come from Johnson County Wastewater, and septic permits from the Johnson County Department of Health and Environment.
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Plumbing permits are usually pulled by the plumber doing the job. If you are still choosing one, compare a few quotes first.
Compare plumber quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
When a permit is usually needed
Before the work starts.
What a plumbing permit costs in Overland Park
How to apply in Overland Park
In Overland Park, you apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit.
What most plumbing permit applications include:
- For Overland Park, a permit is required before any owner or authorized agent constructs, alters, repairs, removes, converts, or replaces a plumbing system regulated by the code (IRC R105.1).
- For Overland Park, the application must identify and describe the work, describe the site, state the intended use and occupancy, and be signed by the applicant or an authorized agent (IRC R105.3).
- Two or more sets of construction documents must accompany the application, drawn with enough clarity to show the location, nature, and extent of the proposed plumbing work and how it will conform to code (IRC R106.1, R106.1.1).
- Minor plumbing repairs, such as clearing a stoppage or removing and resetting a water closet without rearranging pipes or fixtures, are exempt from permit (IRC R105.2).
- Once issued, a permit is only valid for a limited window, commonly 180 days, and becomes invalid if the work is not started or is abandoned within that time, though extensions can be requested (IRC R105.3.2, R105.5).
General submittal guidance from 2021 International Residential Code (IRC), Chapter 1 Scope and Administration, Sections R105 Permits and R106 Construction Documents. Source. City of Overland Park Planning and Development Services, Building Safety Division sets the exact checklist for Overland Park.
Where to apply in Overland Park:
City of Overland Park Planning and Development Services, Building Safety Division
- City Hall, 8500 Santa Fe Drive, Overland Park, KS 66212
- Phone: 913-895-6220
- Email: permitservices@opkansas.gov
Plumbing Permit in Overland Park compared with nearby Kansas localities
| Locality | Permit needed? | Threshold | What each Kansas schedule says | Verified |
|---|---|---|---|---|
| Overland Park | Permit required | Any size | ...Permit Fees, effective 08/01/2025: for a Building Permit with work value of $19,000... | |
| Wichita | Permit required | Any size | Plumbing permit (UBTC Table H): Waste Openings $4.50 each, plus a Permit Issuance Fee |
Inspections and closing out your permit
In Overland Park, plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.
- In Overland Park: piping and equipment placed under a slab or floor must be in place and inspected before any concrete is poured or floor sheathing is installed over it (IRC R109.1.1.1).
- In Overland Park: rough plumbing, along with the mechanical, gas, and electrical rough-in, must be inspected prior to covering or concealment and before fixtures or appliances are set (IRC R109.1.2).
- In Overland Park: rough drain, waste, and vent (DWV) piping is tested with water, air, or (for plastic piping) a vacuum, and must show no evidence of leakage before it is closed in (IRC P2503.5.1).
- In Overland Park: the water-distribution piping is tested and must hold tight under the system's working pressure, or under a 50 psi air test for non-plastic piping, before it is concealed (IRC P2503.7).
- In Overland Park: the framing inspection cannot proceed until the plumbing rough inspection, along with the mechanical and electrical rough inspections, has been approved (IRC R109.1.4).
- In Overland Park: at the final drainage test, each fixture is filled and then drained, and its traps and fixture connections must prove watertight by visual inspection (IRC P2503.5.2).
- In Overland Park: final inspection is made after all work required by the permit is complete, and includes confirming backflow protection, such as vacuum breakers on hose bibbs, is installed (IRC R109.1.6, P2902.4.3).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Overland Park permit portal or by phone at 913-895-6220.
Inspection sequence from 2021 International Residential Code (IRC), Section R109 Inspections and Section P2503 Inspection and Tests. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Plumbing Permit checklist for Overland Park
- Confirm the requirement. Yes, a permit is required. Usually needed: Before the work starts.
- Budget the fee. Development Approval and Permit Fees, effective 08/01/2025: for a Building Permit with work value of $19,000 or less, a Flat Building Permit Fee of $30 ($1 - $5,000) or $50 ($5,001 - $19,000) plus a Flat Plan Review Fee of $30, "for a Total Plan Review and Permit Fee of $60 for work valued at $1 - $5,000 and $80 for work valued at $5,001 - $19,000"; above $19,000, Fee = Valuation x Permit Fee Multiplier (0.0050). Official fee schedule.
- Apply. In Overland Park, you apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit. Start at the Overland Park permit portal.
- Keep the office details handy. City of Overland Park Planning and Development Services, Building Safety Division. Phone: 913-895-6220. Address: City Hall, 8500 Santa Fe Drive, Overland Park, KS 66212.
- Plan for inspections. In Overland Park, plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need a plumbing permit in Overland Park?
- Overland Park requires a plumbing permit for new or extended water lines, additional fixtures, repairs under floors and repairs that change materials; water heaters and gas lines have their own permits. Replacing existing plumbing fixtures is routine maintenance needing no permit, and general exterior water line replacement needs none (call WaterOne first). Sewer connection permits come from Johnson County Wastewater, and septic permits from the Johnson County Department of Health and Environment. Always confirm with the City of Overland Park Planning and Development Services, Building Safety Division before starting.
- How much does a plumbing permit cost in Overland Park?
- Development Approval and Permit Fees, effective 08/01/2025: for a Building Permit with work value of $19,000 or less, a Flat Building Permit Fee of $30 ($1 - $5,000) or $50 ($5,001 - $19,000) plus a Flat Plan Review Fee of $30, "for a Total Plan Review and Permit Fee of $60 for work valued at $1 - $5,000 and $80 for work valued at $5,001 - $19,000"; above $19,000, Fee = Valuation x Permit Fee Multiplier (0.0050). See the official fee schedule for current amounts.
- Where do you apply for a plumbing permit in Overland Park?
- You can apply through the Overland Park permit portal or contact the City of Overland Park Planning and Development Services, Building Safety Division directly. The links are listed on this page.
- Can a homeowner pull a plumbing permit themselves in Overland Park?
- Under Kansas law (K.S.A. 50-6,129(a)(1), 50-6,135(b)): Kansas has no statewide owner-builder statute because the state does not license general or residential contractors; whether a homeowner may pull permits is set by the local code. The one state contractor registration, for roofers, expressly exempts an owner who personally performs, or has employees perform, roofing work on the owner's own dwelling or other structures on residential or farm property the owner owns (K.S.A. 50-6,129(a)(1)). An owner acting as their own roofing contractor must still give the permit official the registration number of any registered roofing subcontractor working under the permit (K.S.A. 50-6,135(b)). Confirm how Overland Park applies this before you apply.
From the Library
What else needs a permit in Overland Park
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | like-for-like fixture and finish replacement versus new walls, new or extended circuits, or new drains, vents or ductwork | ...Permit Fees, effective 08/01/2025: for a Building Permit with work value of $19,000... |
| Deck Permit | It depends | detached deck area; the deck must also be no more than 30 inches above grade and not serve an egress door | ...Permit Fees, effective 08/01/2025: for a Building Permit with work value of $19,000... |
| Electrical Permit | Permit required | Any size | ...Permit Fees, effective 08/01/2025: for a Building Permit with work value of $19,000... |
| EV Charger Permit | Permit required | Any size | See schedule |
| Fence Permit | It depends | new fence over 16 feet in cumulative length; any fence in the regulatory floodway needs a permit regardless | ...and Permit Fees effective 08/01/2025 that is a Flat Building Permit Fee of $30 ($1... |
| HVAC Permit | Permit required | Any size | ...Permit Fees, effective 08/01/2025: for a Building Permit with work value of $19,000... |
| Patio Permit | It depends | on-grade concrete or brick patio that supports no structure | ...Permit Fees, effective 08/01/2025: for a Building Permit with work value of $19,000... |
| Pool Permit | It depends | pool, spa or hot tub depth; also triggered by more than 5,000 gallons, any in-ground installation, or a heater, lighting or hard-wired filter | ...Permit Fees, effective 08/01/2025: for a Building Permit with work value of $19,000... |
| Roof Replacement Permit | It depends | switching from a light roof covering to a heavy one (tile or slate), or structural roof deck repair | Not published |
| Shed Permit | It depends | floor area of a detached accessory structure | ...Permit Fees, effective 08/01/2025: for a Building Permit with work value of $19,000... |
| Solar Permit | Permit required | Any size | ...Permit Fees, effective 08/01/2025: for a Building Permit with work value of $19,000... |
| Water Heater Permit | Permit required | Any size | ...Permit Fees, effective 08/01/2025: for a Building Permit with work value of $19,000... |
Plumbing Permit in other Kansas localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Overland Park documents; the office above sets the local rules.
How this plumbing permit page for Overland Park was verified. 1 official source: opkansas.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Overland Park Planning and Development Services, Building Safety Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Compare Plumbing Permit requirements across Kansas localities