EV Charger Permit in Miami, Florida
Permit required
Yes, a permit is required
Before installing an EV charger or the circuit that feeds it.
Quick answer
The City of Miami publishes no EV-charger page; installing a charger means installing or altering an electrical system, which City Code Sec. 10-5 says requires a permit, and no item in the City's electrical exemption list covers a new circuit or charger. An electrical permit from the City Building Department is therefore required.
- Issued by
- City of Miami Building Department
- Phone
- (305) 416-1100
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
A licensed electrician typically pulls the electrical permit as part of the install. If you have not picked one yet, compare a few quotes first.
Compare electrician quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What an EV charger permit costs in Miami
- Fee schedule in force
- Official scheduleRead .
- Residential (up to 3 units) building, plumbing, mechanical and electrical permits: 0.50% of estimated construction cost;
- "Residential less than estimated $2,500.00": $45.00;
- "Minimum Permit Fee": $110.00;
- "All Permits non-refundable application fee": $40.00;
- "Dry run/Up-Front per $1,000.00 of estimated construction value": $2.80 (no up-front fee on residential work under $2,500);
- "Solid Waste Residential Surcharge" $0.22 per $100.00 of estimated cost (minimum $26.00, maximum $600.00).
- State and Miami-Dade County surcharges are extra.
- Exhibit C Fee Schedule, Building, Chapters 10, 17, 20, adopted by Resolution R-26-0200 (Ordinance 14456), April 23, 2026.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Miami compares in Florida
No Florida jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Martin County | Permit required | Fee schedule effective July 1, 2026: construction costs under $25,000 pay a $75 building fee, a $25 plan review fee and $75 per inspection |
| Miamithis page | Permit required | "Residential less than estimated $2,500.00": $45.00 |
| Tampa | Permit required | "Electrical (general) for all electrical-related activities not addressed below or any other fee table" $120.00; the schedule has the rest |
How to apply in Miami
General guide, not specific to this office
What an EV charger permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an EV charger permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of Miami Building Department
- Miami Riverside Center (MRC), 444 SW 2nd Avenue, 4th Floor, Miami, FL 33130
- Phone: (305) 416-1100
- Email: building@miamigov.com
Your EV Charger Permit checklist for Miami
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: miami.gov: Building.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Miami permit portal.
- Keep the office details handy. City of Miami Building Department. Phone: (305) 416-1100. Email: building@miamigov.com. Address: Miami Riverside Center (MRC), 444 SW 2nd Avenue, 4th Floor, Miami, FL 33130.
Compiled from the official sources on this page. Last checked .
What else needs a permit in Miami
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | Finish work and listed fixture swaps versus a remodel | "Residential less than estimated $2,500.00": $45.00 |
| Deck Permit | Permit required | Any size | "Residential less than estimated $2,500.00": $45.00 |
| Electrical Permit | It depends | Listed repairs and like-for-like device replacements versus new wiring and circuits | "Residential less than estimated $2,500.00": $45.00 |
| Fence Permit | Permit required | Any size | "Residential less than estimated $2,500.00": $45.00 |
| HVAC Permit | It depends | Repairs and part replacements versus new or replacement equipment | "Residential less than estimated $2,500.00": $45.00 |
| Plumbing Permit | It depends | Value of materials and labor for plumbing repair work by a licensed plumbing contractor | "Residential less than estimated $2,500.00": $45.00 |
| Pool Permit | Permit required | Any size | "Residential less than estimated $2,500.00": $45.00 |
| Roof Replacement Permit | Permit required | Any size | "Residential less than estimated $2,500.00": $45.00 |
| Shed Permit | Permit required | Any size | "Residential less than estimated $2,500.00": $45.00 |
| Solar Permit | Permit required | Any size | All City building permit fees for solar panel installation are waived for residential and commercial properties (Sec. 10-18(b)(5)) |
| Water Heater Permit | Permit required | Any size | "Residential less than estimated $2,500.00": $45.00 |
Frequently asked questions
- Do you need an EV charger permit in Miami?
- Yes, before installing an EV charger or the circuit that feeds it. If you are unsure how that applies to your project, call the City of Miami Building Department at (305) 416-1100 before you start.
- How much does an EV charger permit cost in Miami?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 30 Oct 2026. For the figure on your own project, call the City of Miami Building Department at (305) 416-1100.
- Where do you apply for an EV charger permit in Miami?
- You can apply through the Miami permit portal or contact the City of Miami Building Department directly. The links are listed on this page.
- Can a homeowner pull an EV charger permit themselves in Miami?
- Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Miami applies this before you apply.
From the Library
EV Charger Permit in other Florida localities
Everything above, sourced
How this EV charger permit page for Miami was verified. 2 official sources: miami.gov, library.municode.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Miami Building Department. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page