Permit required

Yes, a permit is required

Before installing an EV charger or the circuit that feeds it.

Quick answer

The City of Miami publishes no EV-charger page; installing a charger means installing or altering an electrical system, which City Code Sec. 10-5 says requires a permit, and no item in the City's electrical exemption list covers a new circuit or charger. An electrical permit from the City Building Department is therefore required.

Issued by
City of Miami Building Department
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

A licensed electrician typically pulls the electrical permit as part of the install. If you have not picked one yet, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an EV charger permit costs in Miami

Fee schedule in force
Official scheduleRead .
  • Residential (up to 3 units) building, plumbing, mechanical and electrical permits: 0.50% of estimated construction cost;
  • "Residential less than estimated $2,500.00": $45.00;
  • "Minimum Permit Fee": $110.00;
  • "All Permits non-refundable application fee": $40.00;
  • "Dry run/Up-Front per $1,000.00 of estimated construction value": $2.80 (no up-front fee on residential work under $2,500);
  • "Solid Waste Residential Surcharge" $0.22 per $100.00 of estimated cost (minimum $26.00, maximum $600.00).
  • State and Miami-Dade County surcharges are extra.
  • Exhibit C Fee Schedule, Building, Chapters 10, 17, 20, adopted by Resolution R-26-0200 (Ordinance 14456), April 23, 2026.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Miami compares in Florida

No Florida jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Martin CountyPermit requiredFee schedule effective July 1, 2026: construction costs under $25,000 pay a $75 building fee, a $25 plan review fee and $75 per inspection
Miamithis pagePermit required"Residential less than estimated $2,500.00": $45.00
TampaPermit required"Electrical (general) for all electrical-related activities not addressed below or any other fee table" $120.00; the schedule has the rest

How to apply in Miami

General guide, not specific to this office

What an EV charger permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an EV charger permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Miami Building Department

  • Miami Riverside Center (MRC), 444 SW 2nd Avenue, 4th Floor, Miami, FL 33130
  • Phone: (305) 416-1100
  • Email: building@miamigov.com

What else needs a permit in Miami

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsFinish work and listed fixture swaps versus a remodel"Residential less than estimated $2,500.00": $45.00
Deck PermitPermit requiredAny size"Residential less than estimated $2,500.00": $45.00
Electrical PermitIt dependsListed repairs and like-for-like device replacements versus new wiring and circuits"Residential less than estimated $2,500.00": $45.00
Fence PermitPermit requiredAny size"Residential less than estimated $2,500.00": $45.00
HVAC PermitIt dependsRepairs and part replacements versus new or replacement equipment"Residential less than estimated $2,500.00": $45.00
Plumbing PermitIt dependsValue of materials and labor for plumbing repair work by a licensed plumbing contractor"Residential less than estimated $2,500.00": $45.00
Pool PermitPermit requiredAny size"Residential less than estimated $2,500.00": $45.00
Roof Replacement PermitPermit requiredAny size"Residential less than estimated $2,500.00": $45.00
Shed PermitPermit requiredAny size"Residential less than estimated $2,500.00": $45.00
Solar PermitPermit requiredAny sizeAll City building permit fees for solar panel installation are waived for residential and commercial properties (Sec. 10-18(b)(5))
Water Heater PermitPermit requiredAny size"Residential less than estimated $2,500.00": $45.00

Frequently asked questions

Do you need an EV charger permit in Miami?
Yes, before installing an EV charger or the circuit that feeds it. If you are unsure how that applies to your project, call the City of Miami Building Department at (305) 416-1100 before you start.
How much does an EV charger permit cost in Miami?
The fee wording from the official schedule is in the cost table on this page, as we read it on 30 Oct 2026. For the figure on your own project, call the City of Miami Building Department at (305) 416-1100.
Where do you apply for an EV charger permit in Miami?
You can apply through the Miami permit portal or contact the City of Miami Building Department directly. The links are listed on this page.
Can a homeowner pull an EV charger permit themselves in Miami?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Miami applies this before you apply.

From the Library

EV Charger Permit in other Florida localities

Everything above, sourced

How this EV charger permit page for Miami was verified. 2 official sources: miami.gov, library.municode.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Miami Building Department. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project