Electrical Permit in Miami, Florida

It depends

Sometimes, depending on the project

Before adding or altering wiring, circuits or service equipment; listed repairs and device replacements need no permit.

Confirmed on official page Verified

Issued byCity of Miami Building Department

By Mario Bailey, verified against official sources

Quick answer

Electrical work in the City of Miami needs an electrical permit, issued as a sub-permit under a master building permit or as a stand-alone or Easy Permit. City Code Sec. 10-5(b) exempts repairs and maintenance, replacement of lamps, replacement of damaged receptacles, switches, lights and circuit breakers by licensed electrical contractors, ceiling fans installed or replaced by a licensed contractor, and several other listed items.

Typical threshold: Listed repairs and like-for-like device replacements versus new wiring and circuits.

Who is pulling this permit?

Hire it out

Sponsored

Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

When a permit is usually needed

Before adding or altering wiring, circuits or service equipment; listed repairs and device replacements need no permit.

What an electrical permit costs in Miami

Line item
electrical permitBy formulaResidential (up to 3 units) building, plumbing, mechanical and electrical permits: 0.50% of estimated construction cost; "Residential less than estimated $2,500.00": $45.00; "Minimum Permit Fee": $110.00; "All Permits non-refundable application fee": $40.00; "Dry run/Up-Front per $1,000.00 of estimated construction value": $2.80 (no up-front fee on residential work under $2,500); "Solid Waste Residential Surcharge" $0.22 per $100.00 of estimated cost (minimum $26.00, maximum $600.00). State and Miami-Dade County surcharges are extra. Exhibit C Fee Schedule, Building, Chapters 10, 17, 20, adopted by Resolution R-26-0200 (Ordinance 14456), April 23, 2026.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Miami compares in Florida

JurisdictionPermit needed?Threshold
Alachua CountyPermit requiredAny size
Brevard CountyIt dependsPermits are required for the installation or replacement of electrical wiring, meter cans, and breaker panels; this does not include changing fixtures that do not require moving or changing wiring.
Broward CountyPermit requiredAny size
Charlotte CountyPermit requiredAny size
Clay CountyPermit requiredAny size
Collier CountyPermit requiredPermits shall not be required for the following: ... Electrical: 1. Repair work performed by licensed electrical contractors that does not exceed $1,500.00 in value of materials and labor. 2. Repair or replace existing light fixtures and ceiling fans. 3. Repair or replace electrical wall switches and wall outlet devices of 20 amps or less and 120 volts. 4. Repair/replace low voltage (under 77 volts) devices.
Miamithis pageIt dependsListed repairs and like-for-like device replacements versus new wiring and circuits

How to apply in Miami

In Miami, in most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.

What most electrical permit applications include:

  • Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
  • For Miami, the written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
  • For Miami, the application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
  • Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
  • Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).

General submittal guidance from International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted). Source. City of Miami Building Department sets the exact checklist for Miami.

Where to apply in Miami:

City of Miami Building Department

  • Miami Riverside Center (MRC), 444 SW 2nd Avenue, 4th Floor, Miami, FL 33130
  • Phone: (305) 416-1100
  • Email: building@miamigov.com

Electrical Permit in Miami compared with nearby Florida localities

LocalityPermit needed?ThresholdWhat each Florida schedule saysVerified
MiamiIt dependsListed repairs and like-for-like device replacements versus new wiring and circuits"Residential less than estimated $2,500.00": $45.00
Alachua CountyPermit requiredAny sizeNo electrical-specific flat fee is published
Brevard CountyIt dependsPermits are required for the installation or replacement of electrical wiring, meter cans, and breaker panels; this does not include changing fixtures that do not require moving or changing wiring....Electrical Permit Application fee table lists a Building Code Review fee of $75.00...
Broward CountyPermit requiredAny sizeElectrical permit is the greater of a $125 minimum base fee or 3.0% of job value, per...
Charlotte CountyPermit requiredAny sizeAt application: flat fee $90, plus a building fee of 0.004 x ICC valuation (if valuation...

Inspections and closing out your permit

In Miami, electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.

  1. In Miami: a rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
  2. In Miami: the framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
  3. In Miami: ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
  4. In Miami: arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
  5. In Miami: panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
  6. In Miami: the service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
  7. In Miami: a final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Miami permit portal or by phone at (305) 416-1100.

Inspection sequence from International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need an electrical permit in Miami?
Electrical work in the City of Miami needs an electrical permit, issued as a sub-permit under a master building permit or as a stand-alone or Easy Permit. City Code Sec. 10-5(b) exempts repairs and maintenance, replacement of lamps, replacement of damaged receptacles, switches, lights and circuit breakers by licensed electrical contractors, ceiling fans installed or replaced by a licensed contractor, and several other listed items. Listed repairs and like-for-like device replacements versus new wiring and circuits. Always confirm with the office before starting.
How much does an electrical permit cost in Miami?
Residential (up to 3 units) building, plumbing, mechanical and electrical permits: 0.50% of estimated construction cost; "Residential less than estimated $2,500.00": $45.00; "Minimum Permit Fee": $110.00; "All Permits non-refundable application fee": $40.00; "Dry run/Up-Front per $1,000.00 of estimated construction value": $2.80 (no up-front fee on residential work under $2,500); "Solid Waste Residential Surcharge" $0.22 per $100.00 of estimated cost (minimum $26.00, maximum $600.00). State and Miami-Dade County surcharges are extra. Exhibit C Fee Schedule, Building, Chapters 10, 17, 20, adopted by Resolution R-26-0200 (Ordinance 14456), April 23, 2026. See the official fee schedule for current amounts.
How long does an electrical permit take in Miami?
Easy Permits are issued immediately by email to a qualified contractor; plan-reviewed permits follow the standard review cycle. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for an electrical permit in Miami?
You can apply through the Miami permit portal or contact the City of Miami Building Department directly. The links are listed on this page.
Can a homeowner pull an electrical permit themselves in Miami?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Miami applies this before you apply.

From the Library

What else needs a permit in Miami

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsFinish work and listed fixture swaps versus a remodel"Residential less than estimated $2,500.00": $45.00
Deck PermitPermit requiredAny size"Residential less than estimated $2,500.00": $45.00
EV Charger PermitPermit requiredAny size"Residential less than estimated $2,500.00": $45.00
Fence PermitPermit requiredAny size"Residential less than estimated $2,500.00": $45.00
HVAC PermitIt dependsRepairs and part replacements versus new or replacement equipment"Residential less than estimated $2,500.00": $45.00
Plumbing PermitIt dependsValue of materials and labor for plumbing repair work by a licensed plumbing contractor"Residential less than estimated $2,500.00": $45.00
Pool PermitPermit requiredAny size"Residential less than estimated $2,500.00": $45.00
Roof Replacement PermitPermit requiredAny size"Residential less than estimated $2,500.00": $45.00
Shed PermitPermit requiredAny size"Residential less than estimated $2,500.00": $45.00
Solar PermitPermit requiredAny sizeAll City building permit fees for solar panel installation are waived for residential...
Water Heater PermitPermit requiredAny size"Residential less than estimated $2,500.00": $45.00

Electrical Permit in other Florida localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Miami documents; the office above sets the local rules.

How this electrical permit page for Miami was verified. 2 official sources: miami.gov, library.municode.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Miami Building Department. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page