Sometimes, depending on the project

Before a bathroom remodel that relocates or adds plumbing, adds or alters wiring, or changes walls; finish work and listed fixture swaps need no permit.

Confirmed on official page Verified

Issued byCity of Miami Building Department

By Mario Bailey, verified against official sources

Quick answer

A bathroom remodel in the City of Miami needs a building permit with plumbing, electrical and mechanical review as applicable; the City's residential checklist for kitchen and bathroom repairs covers cabinetry replacement, outlets and plumbing fixtures in existing locations. City Code Sec. 10-5(b) exempts floor finishes, cabinets and countertops, painting and wallpapering, and, by a licensed plumbing contractor, repair or replacement of faucets, toilets, bidets, sinks and lavatories in one- and two-family dwellings.

Typical threshold: Finish work and listed fixture swaps versus a remodel.

Who is pulling this permit?

Hire it out

Sponsored

Remodel contractors usually handle the permits as part of the job. Comparing a few bids before you commit is the useful next step.

Compare bathroom remodel quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

When a permit is usually needed

Before a bathroom remodel that relocates or adds plumbing, adds or alters wiring, or changes walls; finish work and listed fixture swaps need no permit.

What a bathroom remodel permit costs in Miami

Line item
bathroom remodel permitBy formulaResidential (up to 3 units) building, plumbing, mechanical and electrical permits: 0.50% of estimated construction cost; "Residential less than estimated $2,500.00": $45.00; "Minimum Permit Fee": $110.00; "All Permits non-refundable application fee": $40.00; "Dry run/Up-Front per $1,000.00 of estimated construction value": $2.80 (no up-front fee on residential work under $2,500); "Solid Waste Residential Surcharge" $0.22 per $100.00 of estimated cost (minimum $26.00, maximum $600.00). State and Miami-Dade County surcharges are extra. Exhibit C Fee Schedule, Building, Chapters 10, 17, 20, adopted by Resolution R-26-0200 (Ordinance 14456), April 23, 2026.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Miami compares in Florida

JurisdictionPermit needed?Threshold
Martin CountyIt dependsFinish work and fixture repairs versus a remodel
Miamithis pageIt dependsFinish work and listed fixture swaps versus a remodel
TampaIt dependsScope of work: finish-only work is exempt; fixture, plumbing, electrical or wall work is not

How to apply in Miami

In Miami, a bathroom remodel that creates a new bathroom or touches its plumbing, wiring, or walls needs a building permit application, typically filed as separate building, electrical, mechanical, and plumbing permits submitted together and backed by a floor plan showing the fixture layout. A simple like-for-like fixture swap with no other work is often exempt.

What most bathroom remodel permit applications include:

  • Creating a new bathroom or toilet room, or altering, moving, or replacing a plumbing, electrical, gas, or mechanical system as part of the remodel, is regulated work that requires a permit before work starts, usually filed as separate building, electrical, mechanical, and plumbing permit applications submitted together (IRC R105.1).
  • For Miami, the permit application itself must identify and describe the work, describe the site, state the intended use, be accompanied by construction documents, state the valuation of the work, and be signed by the applicant or their agent (IRC R105.3).
  • Those construction documents have to show the location, nature, and extent of the proposed work, which in practice means a scaled existing and proposed floor plan showing every fixture, outlet, switch, and vent fan, including the code-mandated clearances around fixtures such as the water closet (IRC R106.1.1; R307.1 fixture clearances).
  • For Miami, a bathroom needs ventilation: mechanical exhaust ducted to the outside where the required openable window is absent, sized in the range of 50 cubic feet per minute intermittent (IRC R303.3; M1505).
  • New or relocated bathroom receptacles must be ground-fault circuit-interrupter protected (IRC E3902.1 / NEC 210.8(A)(1)).
  • Tub and shower walls have to be finished with a nonabsorbent, waterproof surface extending to a minimum height above the floor (IRC R307.2).
  • Routine maintenance items such as towel bars, mirrors, paint, or floor coverings done alone are commonly permit-exempt, but that exemption ends once the work relocates fixtures or opens up wiring, piping, or walls, so a like-for-like fixture swap should be checked against the local exemption list rather than assumed (IRC R105.2).

General submittal guidance from International Residential Code (IRC), 2021 edition, Sections R105, R106, R303.3, R307, and E3902. Source. City of Miami Building Department sets the exact checklist for Miami.

Where to apply in Miami:

City of Miami Building Department

  • Miami Riverside Center (MRC), 444 SW 2nd Avenue, 4th Floor, Miami, FL 33130
  • Phone: (305) 416-1100
  • Email: building@miamigov.com

Bathroom Remodel Permit in Miami compared with nearby Florida localities

LocalityPermit needed?ThresholdWhat each Florida schedule saysVerified
MiamiIt dependsFinish work and listed fixture swaps versus a remodel"Residential less than estimated $2,500.00": $45.00
Martin CountyIt dependsFinish work and fixture repairs versus a remodelFee schedule effective July 1, 2026: construction costs under $25,000 pay a $75 building...
TampaIt dependsScope of work: finish-only work is exempt; fixture, plumbing, electrical or wall work is notFixture-only work: "Plumbing (general)" $120.00, City of Tampa Trade Permit Fee Schedule...

Inspections and closing out your permit

In Miami, once the permit is issued, the work stays subject to inspection at each stage, and the plumbing, mechanical, and electrical rough-in must be inspected and approved before the walls are closed up. A final inspection, made after everything required by the permit is done, closes out the job.

  1. In Miami: any construction or work covered by the permit stays subject to inspection and must remain accessible and exposed until the building official approves it (IRC R109.1).
  2. In Miami: the plumbing, mechanical, and electrical rough-in has to be inspected and approved before it is covered or concealed, before fixtures or appliances are installed, and before the framing inspection, so the trade work behind the walls is signed off before drywall closes them up (IRC R109.1.2, R109.1.4).
  3. In Miami: work cannot proceed past the point covered by the last approved inspection without the building official's sign-off (IRC R109.4).
  4. Scheduling is on the permit holder in Miami: it is their duty to notify the building official when work is ready and to provide access for each inspection (IRC R109.3).
  5. In Miami: a final inspection, covering everything required by the permit including items such as GFCI protection, closes out the job once all the permitted work is complete (IRC R109.1.6).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Miami permit portal or by phone at (305) 416-1100.

Inspection sequence from International Residential Code (IRC), 2021 edition, Section R109 (Inspections). Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a bathroom remodel permit in Miami?
A bathroom remodel in the City of Miami needs a building permit with plumbing, electrical and mechanical review as applicable; the City's residential checklist for kitchen and bathroom repairs covers cabinetry replacement, outlets and plumbing fixtures in existing locations. City Code Sec. 10-5(b) exempts floor finishes, cabinets and countertops, painting and wallpapering, and, by a licensed plumbing contractor, repair or replacement of faucets, toilets, bidets, sinks and lavatories in one- and two-family dwellings. Finish work and listed fixture swaps versus a remodel. Always confirm with the office before starting.
How much does a bathroom remodel permit cost in Miami?
Residential (up to 3 units) building, plumbing, mechanical and electrical permits: 0.50% of estimated construction cost; "Residential less than estimated $2,500.00": $45.00; "Minimum Permit Fee": $110.00; "All Permits non-refundable application fee": $40.00; "Dry run/Up-Front per $1,000.00 of estimated construction value": $2.80 (no up-front fee on residential work under $2,500); "Solid Waste Residential Surcharge" $0.22 per $100.00 of estimated cost (minimum $26.00, maximum $600.00). State and Miami-Dade County surcharges are extra. Exhibit C Fee Schedule, Building, Chapters 10, 17, 20, adopted by Resolution R-26-0200 (Ordinance 14456), April 23, 2026. See the official fee schedule for current amounts.
How long does a bathroom remodel permit take in Miami?
Kitchen and bathroom remodels are eligible for same-day Walk-Thru Express and Homeowner's Express Review. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a bathroom remodel permit in Miami?
You can apply through the Miami permit portal or contact the City of Miami Building Department directly. The links are listed on this page.
Can a homeowner pull a bathroom remodel permit themselves in Miami?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Miami applies this before you apply.

From the Library

What else needs a permit in Miami

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny size"Residential less than estimated $2,500.00": $45.00
Electrical PermitIt dependsListed repairs and like-for-like device replacements versus new wiring and circuits"Residential less than estimated $2,500.00": $45.00
EV Charger PermitPermit requiredAny size"Residential less than estimated $2,500.00": $45.00
Fence PermitPermit requiredAny size"Residential less than estimated $2,500.00": $45.00
HVAC PermitIt dependsRepairs and part replacements versus new or replacement equipment"Residential less than estimated $2,500.00": $45.00
Plumbing PermitIt dependsValue of materials and labor for plumbing repair work by a licensed plumbing contractor"Residential less than estimated $2,500.00": $45.00
Pool PermitPermit requiredAny size"Residential less than estimated $2,500.00": $45.00
Roof Replacement PermitPermit requiredAny size"Residential less than estimated $2,500.00": $45.00
Shed PermitPermit requiredAny size"Residential less than estimated $2,500.00": $45.00
Solar PermitPermit requiredAny sizeAll City building permit fees for solar panel installation are waived for residential...
Water Heater PermitPermit requiredAny size"Residential less than estimated $2,500.00": $45.00

Bathroom Remodel Permit in other Florida localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Miami documents; the office above sets the local rules.

How this bathroom remodel permit page for Miami was verified. 2 official sources: miami.gov, library.municode.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Miami Building Department. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Bathroom Remodel Permit requirements across Florida localities

Bathroom remodel permit rules nationwide

It depends