Shed Permit in Providence, Rhode Island

Permit required

Yes, a permit is required

Before placing any shed: a zoning certificate for compliance for an accessory structure under 64 sq ft, a building permit above 64 sq ft.

Confirmed on official page Verified

Issued byCity of Providence Department of Inspection and Standards (DIS), Structures and Zoning Division

By Mario Bailey, verified against official sources

Quick answer

Every shed needs a City approval. Rhode Island's current One and Two-Family Dwelling Code exempts from a building permit only one-story detached accessory structures whose floor area does not exceed 64 square feet, so a larger shed needs a building permit; a smaller one still needs a $25.00 zoning certificate for compliance, which the City's portal lists for "Accessory structres under 64 square feet. e.g. Sheds". Sheds are prohibited in front yards under the Zoning Ordinance.

Who is pulling this permit?

Hire it out

Sponsored

If a contractor builds or places your shed, they usually handle any required permit. Compare a few bids before you commit.

Compare contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

When a permit is usually needed

Before placing any shed: a zoning certificate for compliance for an accessory structure under 64 sq ft, a building permit above 64 sq ft.

What a shed permit costs in Providence

Line item
shed permitBy formulaZoning certificate for compliance: $25.00 (Zoning Ordinance: "The fee for a zoning certificate and for a zoning certificate for compliance is $25.00."). Building permit fee by project valuation, from the City of Providence schedule in the state fee rule 510-RICR-00-00-21, section 21.12(A)(28) (amendment effective 12/10/2023): "$1 to $10,000": $23.00 per $1,000; "From $10,001 to $50,000": "$230 +" $21.00 "per $1,000 exceeding $10k"; "From $50,001 to no limit": "$1070 +" $19.00 "per $1,000 exceeding $50k"; "Note: $125 minimum fee". The rule says these fees are exclusive of the state levy under R.I. Gen. Laws 23-27.3-108.2(c)(1). The City's own Permit Fee Calculator (FY19, dated 2018-07-18) uses the same rates but a $50.00 minimum and adds an ADA fee of 0.1 percent of cost; the state rule is the later and governing schedule.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Providence

In Providence, a residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.

What most shed permit applications include:

  • For Providence, a written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
  • For Providence, a scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
  • Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
  • Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
  • Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).

General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. City of Providence Department of Inspection and Standards (DIS), Structures and Zoning Division sets the exact checklist for Providence.

Where to apply in Providence:

City of Providence Department of Inspection and Standards (DIS), Structures and Zoning Division

  • 780 Allens Avenue, Providence, RI 02905
  • Phone: (401) 680-5201

Inspections and closing out your permit

In Providence, a permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.

  1. Foundation or anchor inspection in Providence: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
  2. Frame inspection in Providence: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
  3. Final inspection in Providence: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
  4. In Providence: for a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Providence permit portal or by phone at (401) 680-5201.

Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a shed permit in Providence?
Every shed needs a City approval. Rhode Island's current One and Two-Family Dwelling Code exempts from a building permit only one-story detached accessory structures whose floor area does not exceed 64 square feet, so a larger shed needs a building permit; a smaller one still needs a $25.00 zoning certificate for compliance, which the City's portal lists for "Accessory structres under 64 square feet. e.g. Sheds". Sheds are prohibited in front yards under the Zoning Ordinance. Always confirm with the City of Providence Department of Inspection and Standards (DIS), Structures and Zoning Division before starting.
How much does a shed permit cost in Providence?
Zoning certificate for compliance: $25.00 (Zoning Ordinance: "The fee for a zoning certificate and for a zoning certificate for compliance is $25.00."). Building permit fee by project valuation, from the City of Providence schedule in the state fee rule 510-RICR-00-00-21, section 21.12(A)(28) (amendment effective 12/10/2023): "$1 to $10,000": $23.00 per $1,000; "From $10,001 to $50,000": "$230 +" $21.00 "per $1,000 exceeding $10k"; "From $50,001 to no limit": "$1070 +" $19.00 "per $1,000 exceeding $50k"; "Note: $125 minimum fee". The rule says these fees are exclusive of the state levy under R.I. Gen. Laws 23-27.3-108.2(c)(1). The City's own Permit Fee Calculator (FY19, dated 2018-07-18) uses the same rates but a $50.00 minimum and adds an ADA fee of 0.1 percent of cost; the state rule is the later and governing schedule. See the official fee schedule for current amounts.
Where do you apply for a shed permit in Providence?
You can apply through the Providence permit portal or contact the City of Providence Department of Inspection and Standards (DIS), Structures and Zoning Division directly. The links are listed on this page.
Can a homeowner pull a shed permit themselves in Providence?
Under Rhode Island law (R.I. Gen. Laws 23-27.3-113.3; 23-27.3-113.3.1(b); 23-27.3-113.3.2(b); 5-6-29(c); 28-27-6.1; 5-65-2(a)(1), (5), (6)): Yes. The owner or lessee of a building may apply for the permit (23-27.3-113.3). The owner/occupant of a single-family dwelling is exempt from the state rule that licensed plumbing, mechanical, electrical and fire alarm work be signed for by a licensed person, but must still obtain a permit, be inspected, get approval before using the work, and must do the licensed work without the assistance of others (23-27.3-113.3.1(b)); a parallel exemption from contractor registration requires doing the work without compensated help (23-27.3-113.3.2(b)). The electrical licensing law lets an owner wire a single-family or two-family dwelling they live in or are about to live in (5-6-29(c)), and the mechanical law lets an owner who will occupy a single-family home install pipefitting, refrigeration, sheet metal or sprinkler work after approval and with a permit (28-27-6.1). An owner who builds or arranges construction to sell must register as a contractor, and not occupying the structure for one calendar year after completion is prima facie evidence of intent to sell (5-65-2(a)(5)). Confirm how Providence applies this before you apply.

From the Library

What else needs a permit in Providence

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsFinish work only (painting, tiling, cabinets, counter tops) versus plumbing, electrical or wall changes...rule 510-RICR-00-00-21, section 21.12(A)(28) (amendment effective 12/10/2023): "$1...
Deck PermitPermit requiredAny size...rule 510-RICR-00-00-21, section 21.12(A)(28) (amendment effective 12/10/2023): "$1...
Electrical PermitIt dependsMaintenance exemption for minor repair work such as lamp replacement and plugging in portable equipmentTrade permit fee by project valuation
EV Charger PermitPermit requiredAny sizeTrade permit fee by project valuation
Fence PermitPermit requiredAny sizeZoning certificate for compliance: $25.00 (Zoning Ordinance: "The fee for a zoning...
HVAC PermitIt dependsExempt work list: portable heating, ventilation and cooling units, minor part replacement, small self-contained refrigeration systemsTrade permit fee by project valuation
Patio PermitPermit requiredAny sizeZoning certificate for compliance: $25.00 (Zoning Ordinance: "The fee for a zoning...
Plumbing PermitIt dependsExempt: stopping leaks, clearing stoppages and resetting water closets without replacing or rearranging valves, pipes or fixturesTrade permit fee by project valuation
Pool PermitIt dependsWater a pool or spa is capable of holding...rule 510-RICR-00-00-21, section 21.12(A)(28) (amendment effective 12/10/2023): "$1...
Roof Replacement PermitPermit requiredAny size...rule 510-RICR-00-00-21, section 21.12(A)(28) (amendment effective 12/10/2023): "$1...
Solar PermitPermit requiredAny size...rule 510-RICR-00-00-21, section 21.12(A)(28) (amendment effective 12/10/2023): "$1...
Water Heater PermitIt dependsLike-for-like gas appliance replacement that does not alter the equipment's approval, versus any electric unit or any piping, venting or wiring changeTrade permit fee by project valuation

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Providence documents; the office above sets the local rules.

How this shed permit page for Providence was verified. 2 official sources: providenceri.gov, providenceri.portal.opengov.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Providence Department of Inspection and Standards (DIS), Structures and Zoning Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Shed Permit requirements across Rhode Island localities

Shed permit rules nationwide

Permit required
Get quotes