Bathroom Remodel Permit in Honolulu, Hawaii
It depends
Sometimes, depending on the project
Before a bathroom remodel that adds a bathroom, moves walls, windows or rooms, or involves any electrical, plumbing or mechanical installation.
Issued byCity and County of Honolulu Department of Planning and Permitting (DPP), Building Division
By Mario Bailey, verified against official sources
Quick answer
Ordinance 23-13 rewrote ROH 18-3.1(b)(11) to exempt interior remodeling that does not affect building square footage or the number of rooms or bathrooms, does not move rooms, walls or windows, and does not involve any electrical, plumbing or mechanical installations, including painting, flooring, cabinets, countertops and replacing existing fixtures. A cosmetic bathroom refresh needs no permit; moving a toilet or shower, adding a circuit or fan, or adding a bathroom does. Replacing existing plumbing fixtures like-for-like is also exempt when done by a licensed plumber under the $2,500 repair exemption.
Typical threshold: interior remodeling that changes no room count, wall, window location, or electrical, plumbing or mechanical installation.
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Remodel contractors usually handle the permits as part of the job. Comparing a few bids before you commit is the useful next step.
Compare bathroom remodel quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
When a permit is usually needed
Before a bathroom remodel that adds a bathroom, moves walls, windows or rooms, or involves any electrical, plumbing or mechanical installation.
What a bathroom remodel permit costs in Honolulu
How to apply in Honolulu
In Honolulu, a bathroom remodel that creates a new bathroom or touches its plumbing, wiring, or walls needs a building permit application, typically filed as separate building, electrical, mechanical, and plumbing permits submitted together and backed by a floor plan showing the fixture layout. A simple like-for-like fixture swap with no other work is often exempt.
What most bathroom remodel permit applications include:
- Creating a new bathroom or toilet room, or altering, moving, or replacing a plumbing, electrical, gas, or mechanical system as part of the remodel, is regulated work that requires a permit before work starts, usually filed as separate building, electrical, mechanical, and plumbing permit applications submitted together (IRC R105.1).
- For Honolulu, the permit application itself must identify and describe the work, describe the site, state the intended use, be accompanied by construction documents, state the valuation of the work, and be signed by the applicant or their agent (IRC R105.3).
- Those construction documents have to show the location, nature, and extent of the proposed work, which in practice means a scaled existing and proposed floor plan showing every fixture, outlet, switch, and vent fan, including the code-mandated clearances around fixtures such as the water closet (IRC R106.1.1; R307.1 fixture clearances).
- For Honolulu, a bathroom needs ventilation: mechanical exhaust ducted to the outside where the required openable window is absent, sized in the range of 50 cubic feet per minute intermittent (IRC R303.3; M1505).
- New or relocated bathroom receptacles must be ground-fault circuit-interrupter protected (IRC E3902.1 / NEC 210.8(A)(1)).
- Tub and shower walls have to be finished with a nonabsorbent, waterproof surface extending to a minimum height above the floor (IRC R307.2).
- Routine maintenance items such as towel bars, mirrors, paint, or floor coverings done alone are commonly permit-exempt, but that exemption ends once the work relocates fixtures or opens up wiring, piping, or walls, so a like-for-like fixture swap should be checked against the local exemption list rather than assumed (IRC R105.2).
General submittal guidance from International Residential Code (IRC), 2021 edition, Sections R105, R106, R303.3, R307, and E3902. Source. City and County of Honolulu Department of Planning and Permitting (DPP), Building Division sets the exact checklist for Honolulu.
Where to apply in Honolulu:
City and County of Honolulu Department of Planning and Permitting (DPP), Building Division
- 650 South King Street, 7th Floor, Honolulu, Hawaii 96813
- Phone: (808) 768-8000
- Email: dpp@honolulu.gov
Bathroom Remodel Permit in Honolulu compared with nearby Hawaii localities
| Locality | Permit needed? | Threshold | What each Hawaii schedule says | Verified |
|---|---|---|---|---|
| Honolulu | It depends | interior remodeling that changes no room count, wall, window location, or electrical, plumbing or mechanical installation | ...and materials, plus a plan review fee of 20% of the permit fee (maximum $25,000)... | |
| Hawaii County | It depends | When the remodel moves or replaces pipes or valves, adds wiring, or alters walls or... | ...Code, 2020, ord 20-61): fees are valuation-based under "General Construction": "$0... |
Inspections and closing out your permit
In Honolulu, once the permit is issued, the work stays subject to inspection at each stage, and the plumbing, mechanical, and electrical rough-in must be inspected and approved before the walls are closed up. A final inspection, made after everything required by the permit is done, closes out the job.
- In Honolulu: any construction or work covered by the permit stays subject to inspection and must remain accessible and exposed until the building official approves it (IRC R109.1).
- In Honolulu: the plumbing, mechanical, and electrical rough-in has to be inspected and approved before it is covered or concealed, before fixtures or appliances are installed, and before the framing inspection, so the trade work behind the walls is signed off before drywall closes them up (IRC R109.1.2, R109.1.4).
- In Honolulu: work cannot proceed past the point covered by the last approved inspection without the building official's sign-off (IRC R109.4).
- Scheduling is on the permit holder in Honolulu: it is their duty to notify the building official when work is ready and to provide access for each inspection (IRC R109.3).
- In Honolulu: a final inspection, covering everything required by the permit including items such as GFCI protection, closes out the job once all the permitted work is complete (IRC R109.1.6).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Honolulu permit portal or by phone at (808) 768-8000.
Inspection sequence from International Residential Code (IRC), 2021 edition, Section R109 (Inspections). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Bathroom Remodel Permit checklist for Honolulu
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: interior remodeling that changes no room count, wall, window location, or electrical, plumbing or mechanical installation. Usually needed: Before a bathroom remodel that adds a bathroom, moves walls, windows or rooms, or involves any electrical, plumbing or mechanical installation.
- Budget the fee. Valuation-based: ROH 18-6.2 permit fee on the fair market value of labor and materials, plus a plan review fee of 20% of the permit fee (maximum $25,000) under ROH 18-6.1(a) only when plans are required. No per-item schedule is published; DPP's Fee Calculator computes the fee from the project value. Official fee schedule.
- Apply. In Honolulu, a bathroom remodel that creates a new bathroom or touches its plumbing, wiring, or walls needs a building permit application, typically filed as separate building, electrical, mechanical, and plumbing permits submitted together and backed by a floor plan showing the fixture layout. A simple like-for-like fixture swap with no other work is often exempt. Start at the Honolulu permit portal.
- Keep the office details handy. City and County of Honolulu Department of Planning and Permitting (DPP), Building Division. Phone: (808) 768-8000. Address: 650 South King Street, 7th Floor, Honolulu, Hawaii 96813.
- Plan for inspections. In Honolulu, once the permit is issued, the work stays subject to inspection at each stage, and the plumbing, mechanical, and electrical rough-in must be inspected and approved before the walls are closed up. A final inspection, made after everything required by the permit is done, closes out the job.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need a bathroom remodel permit in Honolulu?
- Ordinance 23-13 rewrote ROH 18-3.1(b)(11) to exempt interior remodeling that does not affect building square footage or the number of rooms or bathrooms, does not move rooms, walls or windows, and does not involve any electrical, plumbing or mechanical installations, including painting, flooring, cabinets, countertops and replacing existing fixtures. A cosmetic bathroom refresh needs no permit; moving a toilet or shower, adding a circuit or fan, or adding a bathroom does. Replacing existing plumbing fixtures like-for-like is also exempt when done by a licensed plumber under the $2,500 repair exemption. Interior remodeling that changes no room count, wall, window location, or electrical, plumbing or mechanical installation. Always confirm with the office before starting.
- How much does a bathroom remodel permit cost in Honolulu?
- Valuation-based: ROH 18-6.2 permit fee on the fair market value of labor and materials, plus a plan review fee of 20% of the permit fee (maximum $25,000) under ROH 18-6.1(a) only when plans are required. No per-item schedule is published; DPP's Fee Calculator computes the fee from the project value. See the official fee schedule for current amounts.
- Where do you apply for a bathroom remodel permit in Honolulu?
- You can apply through the Honolulu permit portal or contact the City and County of Honolulu Department of Planning and Permitting (DPP), Building Division directly. The links are listed on this page.
- Can a homeowner pull a bathroom remodel permit themselves in Honolulu?
- Under Hawaii law (HRS 444-2(7), 444-2.5, 444-9.1, 444-23(e)): Hawaii lets owners or lessees build or improve residential or farm buildings for their own use, or for use by their grandparents, parents, siblings, or children, without a contractor's license, as long as the building is not offered for sale or lease. The owner must register for the exemption with the county when applying for the building permit, supervise the work, hire licensed subcontractors for any licensed work, and use licensed electricians and plumbers for electrical and plumbing work unless the owner holds that license. Selling or leasing the structure within one year after final county inspection is treated as evidence it was built for sale, unless the permit valuation was under $10,000, the buyer is the owner's employee, or the Contractors License Board finds an unforeseen hardship. A violation carries a fine of up to $5,000 or 50% of the permitted construction value, whichever is greater, for a first offense, and bars the owner from the exemption for three years. Confirm how Honolulu applies this before you apply.
From the Library
What else needs a permit in Honolulu
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Any size | ...under ROH 18-6.2, plus a plan review fee of 20% of the permit fee (maximum $25,000)... |
| Electrical Permit | Permit required | Any size | ...and materials, plus a plan review fee of 20% of the permit fee (maximum $25,000)... |
| EV Charger Permit | Permit required | Any size | ...and materials, plus a plan review fee of 20% of the permit fee (maximum $25,000)... |
| Fence Permit | It depends | fence height at which a building permit is required; the exemption does not apply on a street corner or in a flood zone | ...under ROH 18-6.2, with a plan review fee of 20% of the permit fee (maximum $25,000)... |
| HVAC Permit | Permit required | Any size | ...and materials, plus a plan review fee of 20% of the permit fee (maximum $25,000)... |
| Patio Permit | It depends | uncovered walkways and outside paving within private property, not on a street corner or in a flood zone | ...and materials, plus a plan review fee of 20% of the permit fee (maximum $25,000)... |
| Plumbing Permit | Permit required | Any size | ...and materials, plus a plan review fee of 20% of the permit fee (maximum $25,000)... |
| Roof Replacement Permit | It depends | reroofing that does not adversely affect structural components, Group R-3 and U occupancies | ...and materials, plus a plan review fee of 20% of the permit fee (maximum $25,000)... |
| Shed Permit | It depends | aggregate floor area of one-story detached accessory storage buildings, tool sheds and playhouses | ...are valuation-based under ROH 18-6.2 (plus a 20% plan review fee, maximum $25,000... |
| Solar Permit | Permit required | Any size | ...and materials, plus a plan review fee of 20% of the permit fee (maximum $25,000)... |
| Water Heater Permit | Permit required | Any size | ...and materials, plus a plan review fee of 20% of the permit fee (maximum $25,000)... |
Bathroom Remodel Permit in other Hawaii localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Honolulu documents; the office above sets the local rules.
How this bathroom remodel permit page for Honolulu was verified. 2 official sources: honolulu.gov, hnldoc.ehawaii.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City and County of Honolulu Department of Planning and Permitting (DPP), Building Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Compare Bathroom Remodel Permit requirements across Hawaii localities