Shed Permit in Honolulu, Hawaii
It depends
Sometimes, depending on the project
Before building a detached shed, playhouse or similar accessory building when the combined floor area of such structures on the lot would exceed 120 square feet, or any shed taller than one story.
Quick answer
DPP's FAQ states that one-story detached buildings accessory to Group R-3 occupancies, used for storage, tools, playhouses or similar, need no building permit when the aggregate floor area of such structures does not exceed 120 square feet. The limit is aggregate, so several small sheds on one lot count together. Exempt work must still comply with the building codes.
- Typical threshold
- aggregate floor area of one-story detached accessory storage buildings, tool sheds and playhouses
- Issued by
- City and County of Honolulu Department of Planning and Permitting (DPP), Building Division
- Phone
- (808) 768-8000
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
If a contractor builds or places your shed, they usually handle any required permit. Compare a few bids before you commit.
Compare contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a shed permit costs in Honolulu
- Fee basis
- Project valuation
- Fee schedule in force
- Official scheduleRead .
- No shed line item.
- Fees are valuation-based under ROH 18-6.2 (plus a 20% plan review fee, maximum $25,000, under ROH 18-6.1(a) when plans are required);
- use DPP's Fee Calculator.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How to apply in Honolulu
General guide, not specific to this office
What a shed permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a shed permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City and County of Honolulu Department of Planning and Permitting (DPP), Building Division
- 650 South King Street, 7th Floor, Honolulu, Hawaii 96813
- Phone: (808) 768-8000
- Email: dpp@honolulu.gov
Shed Permit in Honolulu compared with nearby Hawaii localities
| Locality | Permit needed? | Threshold | What each Hawaii schedule says | Verified |
|---|---|---|---|---|
| Honolulu | It depends | aggregate floor area of one-story detached accessory storage buildings, tool sheds and playhouses | Fees are valuation-based under ROH 18-6.2 (plus a 20% plan review fee, maximum $25,000, under ROH 18-6.1(a) when plans are required) | |
| Hawaii County | It depends | floor area of a detached one-story accessory structure on residential zoned land; 1,000 sq ft on agricultural zoned land, 15 feet height limit, 10 feet from property line | See schedule |
Your Shed Permit checklist for Honolulu
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: aggregate floor area of one-story detached accessory storage buildings, tool sheds and playhouses. Read the rule where we read it: honolulu.gov: building permits home.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Honolulu permit portal.
- Keep the office details handy. City and County of Honolulu Department of Planning and Permitting (DPP), Building Division. Phone: (808) 768-8000. Email: dpp@honolulu.gov. Address: 650 South King Street, 7th Floor, Honolulu, Hawaii 96813.
Compiled from the official sources on this page. Last checked .
Permitting activity in Honolulu
In 2025, Honolulu authorized permits for 1,446 new residential housing units (607 single-family, 839 in multi-family buildings), valued at $465M, down from 1,638 the year before. That works out to about 2.3 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 622,271.
What else needs a permit in Honolulu
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | interior remodeling that changes no room count, wall, window location, or electrical, plumbing or mechanical installation | Valuation-based: ROH 18-6.2 permit fee on the fair market value of labor and materials; the schedule has the rest |
| Deck Permit | Permit required | Any size | Fees are valuation-based under ROH 18-6.2, plus a plan review fee of 20% of the permit fee (maximum $25,000) under ROH 18-6.1(a) when plans are required |
| Electrical Permit | Permit required | Any size | Valuation-based: ROH 18-6.2 permit fee on the fair market value of labor and materials; the schedule has the rest |
| EV Charger Permit | Permit required | Any size | Valuation-based: ROH 18-6.2 permit fee on the fair market value of labor and materials; the schedule has the rest |
| Fence Permit | It depends | fence height at which a building permit is required; the exemption does not apply on a street corner or in a flood zone | Honolulu prices every building permit from project valuation (fair market labor and materials) under ROH 18-6.2; the schedule has the rest |
| HVAC Permit | Permit required | Any size | Valuation-based: ROH 18-6.2 permit fee on the fair market value of labor and materials; the schedule has the rest |
| Patio Permit | It depends | uncovered walkways and outside paving within private property, not on a street corner or in a flood zone | Valuation-based: ROH 18-6.2 permit fee on the fair market value of labor and materials; the schedule has the rest |
| Plumbing Permit | Permit required | Any size | Valuation-based: ROH 18-6.2 permit fee on the fair market value of labor and materials; the schedule has the rest |
| Roof Replacement Permit | It depends | reroofing that does not adversely affect structural components, Group R-3 and U occupancies | Valuation-based: ROH 18-6.2 permit fee on the fair market value of labor and materials; the schedule has the rest |
| Solar Permit | Permit required | Any size | Valuation-based: ROH 18-6.2 permit fee on the fair market value of labor and materials; the schedule has the rest |
| Water Heater Permit | Permit required | Any size | Valuation-based: ROH 18-6.2 permit fee on the fair market value of labor and materials; the schedule has the rest |
Frequently asked questions
- Do you need a shed permit in Honolulu?
- It depends on the project. Aggregate floor area of one-story detached accessory storage buildings, tool sheds and playhouses. If you are unsure how that applies to your project, call the permit office at (808) 768-8000 before you start.
- How much does a shed permit cost in Honolulu?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 3 Oct 2026. For the figure on your own project, call the permit office at (808) 768-8000.
- Where do you apply for a shed permit in Honolulu?
- You can apply through the Honolulu permit portal or contact the City and County of Honolulu Department of Planning and Permitting (DPP), Building Division directly. The links are listed on this page.
- Can a homeowner pull a shed permit themselves in Honolulu?
- Under Hawaii law (HRS 444-2(7), 444-2.5, 444-9.1, 444-23(e)): Hawaii lets owners or lessees build or improve residential or farm buildings for their own use, or for use by their grandparents, parents, siblings, or children, without a contractor's license, as long as the building is not offered for sale or lease. The owner must register for the exemption with the county when applying for the building permit, supervise the work, hire licensed subcontractors for any licensed work, and use licensed electricians and plumbers for electrical and plumbing work unless the owner holds that license. Selling or leasing the structure within one year after final county inspection is treated as evidence it was built for sale, unless the permit valuation was under $10,000, the buyer is the owner's employee, or the Contractors License Board finds an unforeseen hardship. A violation carries a fine of up to $5,000 or 50% of the permitted construction value, whichever is greater, for a first offense, and bars the owner from the exemption for three years. Confirm how Honolulu applies this before you apply.
From the Library
Shed Permit in other Hawaii localities
Everything above, sourced
How this shed permit page for Honolulu was verified. 2 official sources: honolulu.gov, honolulu.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City and County of Honolulu Department of Planning and Permitting (DPP), Building Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page