Shed Permit in Hawaii County, Hawaii
It depends
Sometimes, depending on the project
Before building a shed over 200 square feet on residential land (1,000 square feet on agricultural land), taller than 15 feet, closer than 10 feet to a property line or another structure, or with electrical or plumbing work.
Issued byCounty of Hawaiʻi Department of Public Works, Building Division
By Mario Bailey, verified against official sources
Quick answer
Hawaiʻi County exempts a detached one-story accessory structure (tool shed, storage shed, greenhouse, gazebo, playhouse, animal shed) on residential or agricultural land if its floor area is 200 square feet or less on residential land, or 1,000 square feet or less on agricultural land, it is not more than fifteen feet above finish grade (residential), and it sits at least ten feet from the property line and other structures. Any electrical or plumbing work removes the exemption.
Typical threshold: floor area of a detached one-story accessory structure on residential zoned land; 1,000 sq ft on agricultural zoned land, 15 feet height limit, 10 feet from property line.

Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
If a contractor builds or places your shed, they usually handle any required permit. Compare a few bids before you commit.
Compare contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
When a permit is usually needed
Before building a shed over 200 square feet on residential land (1,000 square feet on agricultural land), taller than 15 feet, closer than 10 feet to a property line or another structure, or with electrical or plumbing work.
What a shed permit costs in Hawaii County
How Hawaii County compares in Hawaii
Closest shed permit thresholds outside Hawaii
Jurisdictions we cover whose limit sits nearest Hawaii County's 200 sq ft.
- Austin, Texas, one-story detached accessory structures used as tool or storage sheds with floor area no greater than 200 sq ft and no more than 15 ft in height and no plumbing and not in a floodplain are exempt
- Baton Rouge, Louisiana, floor area of a detached accessory structure
- Bellevue, Washington, detached storage sheds playhouses or gazebos with a floor area of 200 square feet or less do not require a building permit; structures over 200 square feet require a permit
- Boise, Idaho, floor area of a one-story detached accessory structure
How to apply in Hawaii County
In Hawaii County, a residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.
What most shed permit applications include:
- For Hawaii County, a written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
- For Hawaii County, a scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
- Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
- Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
- Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).
General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. County of Hawaiʻi Department of Public Works, Building Division sets the exact checklist for Hawaii County.
Where to apply in Hawaii County:
County of Hawaiʻi Department of Public Works, Building Division
- 101 Pauahi Street, Suite 7 (Aupuni Center), Hilo, HI 96720; West Hawaii office: 74-5044 Ane Keohokalole Highway, Bldg E1 1st Floor, Kailua-Kona, HI 96740, (808) 323-4720
- Phone: (808) 961-8331
- Email: cohbuild@hawaiicounty.gov
Shed Permit in Hawaii County compared with nearby Hawaii localities
| Locality | Permit needed? | Threshold | What each Hawaii schedule says | Verified |
|---|---|---|---|---|
| Hawaii County | It depends | floor area of a detached one-story accessory structure on residential zoned land; 1,000 sq ft on agricultural zoned land, 15 feet height limit, 10 feet from property line | $10 per 100 sq. ft. or fraction thereof." Plan review fee of twenty percent of the... | |
| Honolulu | It depends | aggregate floor area of one-story detached accessory storage buildings, tool sheds and playhouses | ...are valuation-based under ROH 18-6.2 (plus a 20% plan review fee, maximum $25,000... |
Inspections and closing out your permit
In Hawaii County, a permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.
- Foundation or anchor inspection in Hawaii County: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
- Frame inspection in Hawaii County: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
- Final inspection in Hawaii County: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
- In Hawaii County: for a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Hawaii County permit portal or by phone at (808) 961-8331.
Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Shed Permit checklist for Hawaii County
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: floor area of a detached one-story accessory structure on residential zoned land; 1,000 sq ft on agricultural zoned land, 15 feet height limit, 10 feet from property line. Usually needed: Before building a shed over 200 square feet on residential land (1,000 square feet on agricultural land), taller than 15 feet, closer than 10 feet to a property line or another structure, or with electrical or plumbing work.
- Budget the fee. Hawaiʻi County Code section 5-7-3(b) "Other" line: "Carport, garages, porches, patios or lanais and detached U structures. $10 per 100 sq. ft. or fraction thereof." Plan review fee of twenty percent of the permit fee, minimum $50, is added (section 5-7-1). Official fee schedule.
- Apply. In Hawaii County, a residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing. Start at the Hawaii County permit portal.
- Keep the office details handy. County of Hawaiʻi Department of Public Works, Building Division. Phone: (808) 961-8331. Address: 101 Pauahi Street, Suite 7 (Aupuni Center), Hilo, HI 96720; West Hawaii office: 74-5044 Ane Keohokalole Highway, Bldg E1 1st Floor, Kailua-Kona, HI 96740, (808) 323-4720.
- Plan for inspections. In Hawaii County, a permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need a shed permit in Hawaii County?
- Hawaiʻi County exempts a detached one-story accessory structure (tool shed, storage shed, greenhouse, gazebo, playhouse, animal shed) on residential or agricultural land if its floor area is 200 square feet or less on residential land, or 1,000 square feet or less on agricultural land, it is not more than fifteen feet above finish grade (residential), and it sits at least ten feet from the property line and other structures. Any electrical or plumbing work removes the exemption. Floor area of a detached one-story accessory structure on residential zoned land; 1,000 sq ft on agricultural zoned land, 15 feet height limit, 10 feet from property line. Always confirm with the office before starting.
- How much does a shed permit cost in Hawaii County?
- Hawaiʻi County Code section 5-7-3(b) "Other" line: "Carport, garages, porches, patios or lanais and detached U structures. $10 per 100 sq. ft. or fraction thereof." Plan review fee of twenty percent of the permit fee, minimum $50, is added (section 5-7-1). See the official fee schedule for current amounts.
- Where do you apply for a shed permit in Hawaii County?
- You can apply through the Hawaii County permit portal or contact the County of Hawaiʻi Department of Public Works, Building Division directly. The links are listed on this page.
- Can a homeowner pull a shed permit themselves in Hawaii County?
- Under Hawaii law (HRS 444-2(7), 444-2.5, 444-9.1, 444-23(e)): Hawaii lets owners or lessees build or improve residential or farm buildings for their own use, or for use by their grandparents, parents, siblings, or children, without a contractor's license, as long as the building is not offered for sale or lease. The owner must register for the exemption with the county when applying for the building permit, supervise the work, hire licensed subcontractors for any licensed work, and use licensed electricians and plumbers for electrical and plumbing work unless the owner holds that license. Selling or leasing the structure within one year after final county inspection is treated as evidence it was built for sale, unless the permit valuation was under $10,000, the buyer is the owner's employee, or the Contractors License Board finds an unforeseen hardship. A violation carries a fine of up to $5,000 or 50% of the permitted construction value, whichever is greater, for a first offense, and bars the owner from the exemption for three years. Confirm how Hawaii County applies this before you apply.
From the Library
What else needs a permit in Hawaii County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | When the remodel moves or replaces pipes or valves, adds wiring, or alters walls or... | ...Code, 2020, ord 20-61): fees are valuation-based under "General Construction": "$0... |
| Deck Permit | It depends | height of a detached deck or platform; an attached deck is not exempt | $10 per 100 sq. ft. or fraction thereof." Plan review fee of twenty percent of the... |
| Electrical Permit | It depends | Before any new wiring, circuit, service change or rewiring | ...Code, 2020, ord 20-61): fees are valuation-based under "General Construction": "$0... |
| EV Charger Permit | Permit required | Any size | ...Code, 2020, ord 20-61): fees are valuation-based under "General Construction": "$0... |
| Fence Permit | It depends | height of a fence; retaining walls follow a separate four foot rule | ...Code, 2020, ord 20-61): fees are valuation-based under "General Construction": "$0... |
| HVAC Permit | It depends | Before installing, removing, altering, repairing or converting any heating, ventilation... | ...Code, 2020, ord 20-61): fees are valuation-based under "General Construction": "$0... |
| Plumbing Permit | It depends | Before replacing or rearranging any pipe or valve, adding fixtures, or any gas, water... | ...Code, 2020, ord 20-61): fees are valuation-based under "General Construction": "$0... |
| Pool Permit | It depends | water features and swimming pools at one and two-family dwellings | ...Code, 2020, ord 20-61): fees are valuation-based under "General Construction": "$0... |
| Roof Replacement Permit | It depends | When the new roof uses a different material, or the work affects structural components | ...Code, 2020, ord 20-61): fees are valuation-based under "General Construction": "$0... |
| Solar Permit | Permit required | Any size | ...Code, 2020, ord 20-61): fees are valuation-based under "General Construction": "$0... |
| Water Heater Permit | Permit required | Any size | ...Code, 2020, ord 20-61): fees are valuation-based under "General Construction": "$0... |
Shed Permit in other Hawaii localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Hawaii County documents; the office above sets the local rules.
- IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC
- IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC
How this shed permit page for Hawaii County was verified. 2 official sources: hawaii-county-public-works-hawaiicountygis.hub.arcgis.com, hawaii-county-public-works-hawaiicountygis.hub.arcgis.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with County of Hawaiʻi Department of Public Works, Building Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page