Deck Permit in Honolulu, Hawaii
Permit required
Yes, a permit is required
Before building any deck.
Issued byCity and County of Honolulu Department of Planning and Permitting (DPP), Building Division
By Mario Bailey, verified against official sources
Quick answer
DPP's FAQ answers flatly that a deck needs a building permit under ROH Chapter 18, with no size or height exemption stated. Honolulu's exemption list in ROH 18-3.1(b) has no deck item, unlike the model code's 200 square foot, 30 inch low-deck exemption.
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
If a contractor builds your deck, they usually handle the permit as part of the job. Compare a few bids before you commit.
Compare deck contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
When a permit is usually needed
Before building any deck.
What a deck permit costs in Honolulu
How to apply in Honolulu
In Honolulu, a residential deck permit application is a set of construction documents that show what will be built and prove it meets the IRC deck provisions. In practice that means a scaled site plan locating the deck and its setbacks, plus deck plans and structural details covering the footings, posts, beams, joists, ledger, guards, and stairs.
What most deck permit applications include:
- For Honolulu, a permit application identifying the work, the deck's size (square footage), and whether electrical work such as lights or receptacles is included, submitted for plan review before construction begins (IRC R106).
- For Honolulu, a scaled site plan (for example 1/4 inch to 1 foot) showing the new deck's location relative to the house, its overall length and width, and dimensioned distances from the deck to all property lines and other structures so required setbacks can be verified (IRC R106.1.1).
- For Honolulu, a deck plan drawn to scale showing overall dimensions and the framing layout: joist size, spacing, span, and species; beam size and span; post size and height; and footing or pier size and depth (IRC R507.4 posts, R507.5 beams, R507.6 joists, R507.3 footings).
- For Honolulu, a section or side elevation with connection details showing the ledger attachment to the house band joist with flashing, the fastener or bolt schedule, joist hangers, post-to-beam and post-to-footing connections, and the required lateral load connection (IRC R507.9 ledger connection, R507.9.2 lateral connection, R507.2.4 flashing).
- Footing sizing derived from tributary area, the soil bearing value, and design loads per IRC Table R507.3.1, with footings shown bearing on undisturbed soil at the frost depth required by the jurisdiction (IRC R507.3).
- Details for the guards required where the walking surface is more than 30 inches above grade, and for the stairs and handrails, showing guard height and opening limits, stair riser and tread dimensions, and handrail location (IRC R312 guards, R311.7 stairs and handrails).
- For designs that fall outside the prescriptive R507 tables (for example multi-story or stacked decks, or a ledger attached to a cantilever), engineered and stamped structural plans are submitted in place of the prescriptive details (IRC R507.1 and R301).
General submittal guidance from IRC R106.1.1 (construction documents) and IRC R507 (exterior decks), 2021 IRC. Source. City and County of Honolulu Department of Planning and Permitting (DPP), Building Division sets the exact checklist for Honolulu.
Where to apply in Honolulu:
City and County of Honolulu Department of Planning and Permitting (DPP), Building Division
- 650 South King Street, 7th Floor, Honolulu, Hawaii 96813
- Phone: (808) 768-8000
- Email: dpp@honolulu.gov
Deck Permit in Honolulu compared with nearby Hawaii localities
| Locality | Permit needed? | Threshold | What each Hawaii schedule says | Verified |
|---|---|---|---|---|
| Honolulu | Permit required | Any size | ...under ROH 18-6.2, plus a plan review fee of 20% of the permit fee (maximum $25,000)... | |
| Hawaii County | It depends | height of a detached deck or platform; an attached deck is not exempt | $10 per 100 sq. ft. or fraction thereof." Plan review fee of twenty percent of the... |
Inspections and closing out your permit
In Honolulu, deck work is inspected in sequence as it is built: the footings before concrete is placed, the framing before the decking boards go down, and a final inspection once the deck is complete. Each stage checks the items that would be hidden or unsafe if missed.
- Footing or pier inspection in Honolulu: after the holes are dug and any forms or reinforcing are set but before concrete is placed, the inspector checks footing depth and diameter, a flat undisturbed bearing surface, and that the holes are free of water (IRC R109.1.1 foundation inspection; R507.3 footings).
- Framing inspection in Honolulu: after the deck is framed but before the decking conceals it, the inspector verifies the ledger attachment and its flashing, the fastener and bolt schedule, joist hangers and metal connectors, post-to-beam and post-to-footing connections, and the lateral load connection; call it before decking is installed (IRC R109.1.4 frame inspection; R507.9 ledger and flashing).
- Final inspection in Honolulu: after the deck is complete and before it is used, the inspector confirms guard height and opening limits (a 4 inch sphere must not pass, 4 3/8 inch at stairs), stair riser and tread dimensions, handrail height and graspability where there are 4 or more risers, stair landings, and required stair lighting (IRC R109.1.6 final inspection; R312 guards, R311.7 stairs and handrails).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Honolulu permit portal or by phone at (808) 768-8000.
Inspection sequence from IRC R109 (inspections: R109.1.1 footing before concrete, R109.1.4 frame, R109.1.6 final), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Deck Permit checklist for Honolulu
- Confirm the requirement. Yes, a permit is required. Usually needed: Before building any deck.
- Budget the fee. No deck line item. Fees are valuation-based under ROH 18-6.2, plus a plan review fee of 20% of the permit fee (maximum $25,000) under ROH 18-6.1(a) when plans are required. Official fee schedule.
- Apply. In Honolulu, a residential deck permit application is a set of construction documents that show what will be built and prove it meets the IRC deck provisions. In practice that means a scaled site plan locating the deck and its setbacks, plus deck plans and structural details covering the footings, posts, beams, joists, ledger, guards, and stairs. Start at the Honolulu permit portal.
- Keep the office details handy. City and County of Honolulu Department of Planning and Permitting (DPP), Building Division. Phone: (808) 768-8000. Address: 650 South King Street, 7th Floor, Honolulu, Hawaii 96813.
- Plan for inspections. In Honolulu, deck work is inspected in sequence as it is built: the footings before concrete is placed, the framing before the decking boards go down, and a final inspection once the deck is complete. Each stage checks the items that would be hidden or unsafe if missed.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need a deck permit in Honolulu?
- DPP's FAQ answers flatly that a deck needs a building permit under ROH Chapter 18, with no size or height exemption stated. Honolulu's exemption list in ROH 18-3.1(b) has no deck item, unlike the model code's 200 square foot, 30 inch low-deck exemption. Always confirm with the City and County of Honolulu Department of Planning and Permitting (DPP), Building Division before starting.
- How much does a deck permit cost in Honolulu?
- No deck line item. Fees are valuation-based under ROH 18-6.2, plus a plan review fee of 20% of the permit fee (maximum $25,000) under ROH 18-6.1(a) when plans are required. See the official fee schedule for current amounts.
- Where do you apply for a deck permit in Honolulu?
- You can apply through the Honolulu permit portal or contact the City and County of Honolulu Department of Planning and Permitting (DPP), Building Division directly. The links are listed on this page.
- Can a homeowner pull a deck permit themselves in Honolulu?
- Under Hawaii law (HRS 444-2(7), 444-2.5, 444-9.1, 444-23(e)): Hawaii lets owners or lessees build or improve residential or farm buildings for their own use, or for use by their grandparents, parents, siblings, or children, without a contractor's license, as long as the building is not offered for sale or lease. The owner must register for the exemption with the county when applying for the building permit, supervise the work, hire licensed subcontractors for any licensed work, and use licensed electricians and plumbers for electrical and plumbing work unless the owner holds that license. Selling or leasing the structure within one year after final county inspection is treated as evidence it was built for sale, unless the permit valuation was under $10,000, the buyer is the owner's employee, or the Contractors License Board finds an unforeseen hardship. A violation carries a fine of up to $5,000 or 50% of the permitted construction value, whichever is greater, for a first offense, and bars the owner from the exemption for three years. Confirm how Honolulu applies this before you apply.
From the Library
What else needs a permit in Honolulu
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | interior remodeling that changes no room count, wall, window location, or electrical, plumbing or mechanical installation | ...and materials, plus a plan review fee of 20% of the permit fee (maximum $25,000)... |
| Electrical Permit | Permit required | Any size | ...and materials, plus a plan review fee of 20% of the permit fee (maximum $25,000)... |
| EV Charger Permit | Permit required | Any size | ...and materials, plus a plan review fee of 20% of the permit fee (maximum $25,000)... |
| Fence Permit | It depends | fence height at which a building permit is required; the exemption does not apply on a street corner or in a flood zone | ...under ROH 18-6.2, with a plan review fee of 20% of the permit fee (maximum $25,000)... |
| HVAC Permit | Permit required | Any size | ...and materials, plus a plan review fee of 20% of the permit fee (maximum $25,000)... |
| Patio Permit | It depends | uncovered walkways and outside paving within private property, not on a street corner or in a flood zone | ...and materials, plus a plan review fee of 20% of the permit fee (maximum $25,000)... |
| Plumbing Permit | Permit required | Any size | ...and materials, plus a plan review fee of 20% of the permit fee (maximum $25,000)... |
| Roof Replacement Permit | It depends | reroofing that does not adversely affect structural components, Group R-3 and U occupancies | ...and materials, plus a plan review fee of 20% of the permit fee (maximum $25,000)... |
| Shed Permit | It depends | aggregate floor area of one-story detached accessory storage buildings, tool sheds and playhouses | ...are valuation-based under ROH 18-6.2 (plus a 20% plan review fee, maximum $25,000... |
| Solar Permit | Permit required | Any size | ...and materials, plus a plan review fee of 20% of the permit fee (maximum $25,000)... |
| Water Heater Permit | Permit required | Any size | ...and materials, plus a plan review fee of 20% of the permit fee (maximum $25,000)... |
Deck Permit in other Hawaii localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Honolulu documents; the office above sets the local rules.
How this deck permit page for Honolulu was verified. 2 official sources: honolulu.gov, honolulu.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City and County of Honolulu Department of Planning and Permitting (DPP), Building Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page