Hawaii / Honolulu

Deck Permit in Honolulu, Hawaii

Permit required

Yes, a permit is required

Before building any deck.

Quick answer

DPP's FAQ answers flatly that a deck needs a building permit under ROH Chapter 18, with no size or height exemption stated. Honolulu's exemption list in ROH 18-3.1(b) has no deck item, unlike the model code's 200 square foot, 30 inch low-deck exemption.

Issued by
City and County of Honolulu Department of Planning and Permitting (DPP), Building Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

If a contractor builds your deck, they usually handle the permit as part of the job. Compare a few bids before you commit.

Compare deck contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a deck permit costs in Honolulu

Fee basis
Project valuation
Fee schedule in force
Official scheduleRead .
  • No deck line item.
  • ROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500;
  • $8 + $2.50 per $100 or fraction thereof from $500.01 to $1,000;
  • $12 + $2.20 per $100 or fraction thereof from $1,000.01 to $20,000;
  • $82 + $18 per $1,000 or fraction thereof from $20,000.01 to $50,000;
  • $286 + $14 per $1,000 or fraction thereof from $50,000.01 to $100,000, with lower rates per $1,000 for larger projects.
  • When plans are required, a plan review fee of 20 percent of the tentative building permit fee, not greater than $25,000, is added (ROH 18-6.1(a)).
  • Work started before the permit is obtained is charged triple fees (ROH 18-6.2(d)).

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Honolulu

General guide, not specific to this office

What a deck permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a deck permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City and County of Honolulu Department of Planning and Permitting (DPP), Building Division

  • 650 South King Street, 7th Floor, Honolulu, Hawaii 96813
  • Phone: (808) 768-8000
  • Email: dpp@honolulu.gov

Deck Permit in Honolulu compared with nearby Hawaii localities

LocalityPermit needed?ThresholdWhat each Hawaii schedule saysVerified
HonoluluPermit requiredAny sizeROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500
Hawaii CountyIt dependsheight of a detached deck or platform; an attached deck is not exemptSee schedule

Permitting activity in Honolulu

In 2025, Honolulu authorized permits for 1,446 new residential housing units (607 single-family, 839 in multi-family buildings), valued at $465M, down from 1,638 the year before. That works out to about 2.3 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 622,271.

What else needs a permit in Honolulu

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsinterior remodeling that changes no room count, wall, window location, or electrical, plumbing or mechanical installationROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500
Electrical PermitPermit requiredAny sizeROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500
EV Charger PermitPermit requiredAny sizeROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500
Fence PermitIt dependsfence height at which a building permit is required; the exemption does not apply on a street corner or in a flood zoneROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500
HVAC PermitPermit requiredAny sizeROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500
Patio PermitIt dependsuncovered walkways and outside paving within private property, not on a street corner or in a flood zoneROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500
Plumbing PermitPermit requiredAny sizeROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500
Roof Replacement PermitIt dependsreroofing that does not adversely affect structural components, Group R-3 and U occupanciesROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500
Shed PermitIt dependsaggregate floor area of one-story detached accessory storage buildings, tool sheds and playhousesROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500
Solar PermitPermit requiredAny sizeROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500
Water Heater PermitPermit requiredAny sizeROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500

Frequently asked questions

Do you need a deck permit in Honolulu?
Yes, before building any deck. If you are unsure how that applies to your project, call the permit office at (808) 768-8000 before you start.
How much does a deck permit cost in Honolulu?
The fee wording from the official schedule is in the cost table on this page, as we read it on 17 Nov 2026. For the figure on your own project, call the permit office at (808) 768-8000.
Where do you apply for a deck permit in Honolulu?
You can apply through the Honolulu permit portal or contact the City and County of Honolulu Department of Planning and Permitting (DPP), Building Division directly. The links are listed on this page.
Can a homeowner pull a deck permit themselves in Honolulu?
Under Hawaii law (HRS 444-2(7), 444-2.5, 444-9.1, 444-23(e)): Hawaii lets owners or lessees build or improve residential or farm buildings for their own use, or for use by their grandparents, parents, siblings, or children, without a contractor's license, as long as the building is not offered for sale or lease. The owner must register for the exemption with the county when applying for the building permit, supervise the work, hire licensed subcontractors for any licensed work, and use licensed electricians and plumbers for electrical and plumbing work unless the owner holds that license. Selling or leasing the structure within one year after final county inspection is treated as evidence it was built for sale, unless the permit valuation was under $10,000, the buyer is the owner's employee, or the Contractors License Board finds an unforeseen hardship. A violation carries a fine of up to $5,000 or 50% of the permitted construction value, whichever is greater, for a first offense, and bars the owner from the exemption for three years. Confirm how Honolulu applies this before you apply.

From the Library

Deck Permit in other Hawaii localities

Everything above, sourced

How this deck permit page for Honolulu was verified. 2 official sources: honolulu.gov, honolulu.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City and County of Honolulu Department of Planning and Permitting (DPP), Building Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project