Building permits in Honolulu, Hawaii
Of the 12 common home projects we have verified in Honolulu, 7 need a permit outright and 5 depend on size or scope. Click any project for the full rule, fee, and how to apply.
- Project types verified
- 12of 13 we cover in Honolulu
City and County of Honolulu Department of Planning and Permitting (DPP), Building Division
- 650 South King Street, 7th Floor, Honolulu, Hawaii 96813
- Phone: (808) 768-8000
- Email: dpp@honolulu.gov
- Official permit page
- Permit portal
- Official fee schedule
Look up a permit in Honolulu
Honolulu runs an online permit portal. We have not confirmed what its record search covers.
What needs a permit in Honolulu
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | interior remodeling that changes no room count, wall, window location, or electrical, plumbing or mechanical installation | ROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500 |
| Deck Permit | Permit required | Any size | ROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500 |
| Electrical Permit | Permit required | Any size | ROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500 |
| EV Charger Permit | Permit required | Any size | ROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500 |
| Fence Permit | It depends | fence height at which a building permit is required; the exemption does not apply on a street corner or in a flood zone | ROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500 |
| HVAC Permit | Permit required | Any size | ROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500 |
| Patio Permit | It depends | uncovered walkways and outside paving within private property, not on a street corner or in a flood zone | ROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500 |
| Plumbing Permit | Permit required | Any size | ROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500 |
| Pool Permit | Not confirmed | Not confirmed | Not published |
| Roof Replacement Permit | It depends | reroofing that does not adversely affect structural components, Group R-3 and U occupancies | ROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500 |
| Shed Permit | It depends | aggregate floor area of one-story detached accessory storage buildings, tool sheds and playhouses | ROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500 |
| Solar Permit | Permit required | Any size | ROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500 |
| Water Heater Permit | Permit required | Any size | ROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500 |
Planning a project in Honolulu?
Hire it out
Sponsored
Licensed contractors usually pull the permit as part of the job. Comparing a few local quotes before you commit is the useful next step.
Compare local contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
Planning several things at once? Check your whole project
Honolulu permit fees compared with nearby Hawaii localities
| Hawaii locality | Deck Permit | HVAC Permit | Electrical Permit |
|---|---|---|---|
| Honolulu | ROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500 | ROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500 | ROH Chapter 18 Table No. 18-A prices the building permit from the total estimated valuation of work: $20 for $0.01 to $500 |
| Hawaii County | See schedule | See schedule | See schedule |
Each cell is taken from that Hawaii jurisdiction's own fee schedule; the full wording and source sit on each permit page.
Honolulu penalty for work started without a permit
Honolulu publishes what it charges when work begins before the permit, quoted here from the schedule or permit page we verified.
-
Work started before the permit is obtained is charged triple fees (ROH 18-6.2(d)).
Honolulu bathroom remodel permit page · last checked
The Hawaii statute, the after-the-fact permit path and who may pull the permit: building without a permit in Hawaii.
Honolulu permit questions, answered from the data
- Do you need a permit in Honolulu?
- For most projects, yes. Of the 13 permit types we cover in Honolulu, 7 always require a permit (for example a deck permit) and 5 depend on size or scope (a bathroom remodel permit, for instance), and 1 is not confirmed. Each Honolulu permit type's page states the exact rule and its source.
- How much does a permit cost in Honolulu?
- Honolulu publishes a fee for 12 of the 13 permit types we cover, each quoted on its page from the jurisdiction's own schedule (linked on every page that carries one). Fees are set by City and County of Honolulu Department of Planning and Permitting (DPP), Building Division; we do not estimate or mark them up.
- Where do you apply for a permit in Honolulu?
- City and County of Honolulu Department of Planning and Permitting (DPP), Building Division issues permits in Honolulu and has an online permit portal, and takes questions at (808) 768-8000. The Honolulu official page and portal are linked in the office section above.
- What is the penalty for building without a permit in Honolulu?
- Honolulu publishes its own charge for work started before the permit: Work started before the permit is obtained is charged triple fees (ROH 18-6.2(d)). That is the local bill; the Hawaii statute, the after-the-fact permit path and who may pull the permit are on the Hawaii building-without-a-permit page.
How the Honolulu pages were verified. 13 permit types, 5 distinct official sources, most recently checked . Every rule is read from City and County of Honolulu Department of Planning and Permitting (DPP), Building Division or the applicable code and cited on its page; anything we could not confirm for Honolulu is marked rather than estimated. How we verify.
Permitting activity in Honolulu
In 2025, Honolulu authorized permits for 1,446 new residential housing units (607 single-family, 839 in multi-family buildings), valued at $465M , down from 1,638 the year before. That works out to about 2.3 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 622,271.