Maryland

Building permits in Howard County, Maryland

Verified against official sources

Of the 13 common home projects we have verified in Howard County, 6 need a permit outright and 6 depend on size or scope. Click any project for the full rule, fee, and how to apply.

Project types verified
13in Howard County

One thing Howard County does not make you permit

Worth knowing before you call anyone. Most jurisdictions we cover require all of these.

  • Patio Permit

    A standard patio installation does not need a permit; a patio that includes a retaining wall over 3 feet high, or is located in a mapped floodplain, may still need a separate permit

What needs a permit in Howard County

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsfinish and cabinet work listed in local Section 105.2 item 14 versus other alterationsAlterations & Repairs to Attached and Detached Single Family Dwellings: Filing Fee (non-refundable) $25; the schedule has the rest
Deck PermitIt dependsa detached freestanding deck that is less than 25 square feet in area and less than 30 inches above grade is exempt from a building permit; every other deck needs one$50 per structure (Miscellaneous Structures Accessory permit, FY2027 Building Permit Fee Schedule)
Electrical PermitPermit requiredAny size$50 non-refundable permit application fee plus a $50 flat fee for residential alterations and additions
EV Charger PermitPermit requiredAny sizeUnder the Electrical Permit Fee Schedule (Howard County Council Resolution #83-2026, Effective July 1, 2026): Permit Application Fee (Non-Refundable) $50
Fence PermitIt dependsfences 7 ft or under, not enclosing a pool and not in the floodplain, are exempt from a building permit at an existing single-family dwelling; over 7 ft or enclosing a pool requires a Miscellaneous Structures building permit$50 per structure for a fence over 7 feet high; the schedule has the rest
HVAC PermitIt dependspermit required for new installations, fuel or energy source conversions, new or altered systems and duct extensions, and replacement with a change of fuel or power source; not required for exact replacement of existing electrical HVAC equipment$50 non-refundable application fee
Patio PermitNo permit neededExemptHoward County's Building Permit Fee Schedule effective July 1, 2026 has no fee line for a patio
Plumbing PermitPermit requiredAny size$50 non-refundable filing fee (other than Express Plumbing Permit)
Pool PermitPermit requiredAny size$100 for above-ground pools
Roof Replacement PermitIt dependsroof covering replacement with no other structural repairs is exempt, including up to 64 sq ft of roof sheathing; replacing more sheathing or any other structural repair requires a building permitNot published
Shed PermitIt dependssheds under 200 sq ft (one-story, non-conditioned, detached) are exempt from a building permit; 200 sq ft or more requires a Miscellaneous Structures building permit$50 per structure for sheds over 200 and up to 400 sq ft (Miscellaneous Structures Accessory permit, FY2027 fee schedule)
Solar PermitPermit requiredAny size$50 per structure for a residential roof- or ground-mounted solar collector (Miscellaneous Structures Accessory permit, FY2027 fee schedule)
Water Heater PermitPermit requiredAny sizeSee schedule

What you can build in Howard County

Planning a project in Howard County?

Hire it out

Sponsored

Licensed contractors usually pull the permit as part of the job. Comparing a few local quotes before you commit is the useful next step.

Compare local contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

Planning several things at once? Check your whole project

Schedule an inspection in Howard County

Permitted work is not finished until it passes inspection. DILP inspections and enforcements page with inspection scheduling instructions.

Schedule or request a Howard County inspection

When the portal will not take the date you need, the office still books by phone: 410-313-2455.

Checked . If the office has changed its process, report it.

Howard County permit fees compared with nearby Maryland localities

Maryland locality Deck PermitHVAC PermitElectrical Permit
Howard County $50 per structure (Miscellaneous Structures Accessory permit, FY2027 Building Permit Fee Schedule) $50 non-refundable application fee $50 non-refundable permit application fee plus a $50 flat fee for residential alterations and additions
Anne Arundel County See schedule Mechanical, residential: "Heating and Air Conditioning | $121.00", "Heating System | $95.00"; the schedule has the rest See schedule
Baltimore County Building Permit Fee Schedule effective 07/01/26: Decks (Open Deck) (under 600 sf) $105.00 See schedule See schedule
Montgomery County $223.87 for an open unenclosed deck 500 SF or less in area; the schedule has the rest Mechanical Permit minimum fee $80.84 for a residential one or two family dwelling; the schedule has the rest $111.94 minimum fee for a residential one or two family dwelling electrical permit; the schedule has the rest

Each cell is taken from that Maryland jurisdiction's own fee schedule; the full wording and source sit on each permit page.

Howard County permit questions, answered from the data

Do you need a permit in Howard County?
It depends on the project. Of the 13 permit types we cover in Howard County, 6 always require a permit (for example an electrical permit), 6 depend on size or scope (a bathroom remodel permit, for instance) and 1 needs no permit at all in Howard County. Each Howard County permit type's page states the exact rule and its source.
How much does a permit cost in Howard County?
Howard County publishes a fee for 12 of the 13 permit types we cover, each quoted on its page from the jurisdiction's own schedule (linked on every page that carries one). Fees are set by Howard County Department of Inspections, Licenses and Permits; we do not estimate or mark them up.
Where do you apply for a permit in Howard County?
Howard County Department of Inspections, Licenses and Permits issues permits in Howard County and has an online permit portal, and takes questions at 410-313-2455. The Howard County official page and portal are linked in the office section above.

How the Howard County pages were verified. 13 permit types, 20 distinct official sources, most recently checked . Every rule is read from Howard County Department of Inspections, Licenses and Permits or the applicable code and cited on its page; anything we could not confirm for Howard County is marked rather than estimated. How we verify.

Permitting activity in Howard County

In 2025, Howard County authorized permits for 728 new residential housing units (329 single-family, 399 in multi-family buildings), valued at $256M , down from 881 the year before. That works out to about 2.1 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 339,183.

From the Library

Other permit offices in Maryland