Maryland

Building permits in Baltimore County, Maryland

Of the 9 common home projects we have verified in Baltimore County, 2 need a permit outright and 7 depend on size or scope. Click any project for the full rule, fee, and how to apply.

Project types verified
9of 10 we cover in Baltimore County

Baltimore County Department of Permits, Approvals and Inspections (PAI)

Look up a permit in Baltimore County

Baltimore County permit records are public, and you can check a property's permit history by address or permit number online.

How to search Baltimore County permit records

What needs a permit in Baltimore County

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsdeck floor area, with a permit also required for any deck more than 16 inches above the lowest gradeBuilding Permit Fee Schedule effective 07/01/26: Decks (Open Deck) (under 600 sf) $105.00
Electrical PermitIt dependsBefore any electrical work, including extending circuit wiring, low voltage wiring, and...Electrical Permit Fee Schedule effective 11/26/18: Residential Service (each meter), new, modification, upgrade, replacement or reconnection $34.00
Fence PermitIt dependsfence height measured vertical to ground, including a fence set on top of a wallBuilding Permit Fee Schedule effective 07/01/26 lists Fences, Residential: $35.00 + $0.05 / linear ft, Over 250 linear ft, Minimum $35.00
HVAC PermitIt dependsBefore installing ductwork in a dwelling that has none or adding ductwork not covered by...See schedule
Patio PermitNot confirmedNot confirmedNot published
Plumbing PermitPermit requiredAny sizePlumbing Inspection Fee Schedule effective 11/26/18: Inspection, New, for 1st fixture $30.00 plus $6.00 each additional
Pool PermitIt dependsabove-ground pool surface area, where the water depth is 24 inches or more; in-ground pools require a permit at any sizeBuilding Permit Fee Schedule effective 07/01/26: Swimming Pool, Residential, Above Ground $60.00
Roof Replacement PermitIt dependsshare of the sheathing or deck being replaced in a roofing jobA qualifying re-roof is filed as a residential alteration: Additions/Alterations under 600 sf without structural changes $105.00; the schedule has the rest
Shed PermitIt dependsaccessory structure floor areaBuilding Permit Fee Schedule effective 07/01/26: Accessory Structure, Under 1000 sf, $105.00
Solar PermitPermit requiredAny sizeBuilding Permit Fee Schedule effective 07/01/26: Solar Power System, Residential (Roof and Ground Mounted) $100.00; the schedule has the rest

What you can build in Baltimore County

Planning a project in Baltimore County?

Hire it out

Sponsored

Licensed contractors usually pull the permit as part of the job. Comparing a few local quotes before you commit is the useful next step.

Compare local contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

Planning several things at once? Check your whole project

Baltimore County permit fees compared with nearby Maryland localities

Maryland locality Deck PermitHVAC PermitElectrical Permit
Baltimore County Building Permit Fee Schedule effective 07/01/26: Decks (Open Deck) (under 600 sf) $105.00 See schedule See schedule
Anne Arundel County See schedule Mechanical, residential: "Heating and Air Conditioning | $121.00", "Heating System | $95.00"; the schedule has the rest See schedule
Howard County $50 per structure (Miscellaneous Structures Accessory permit, FY2027 Building Permit Fee Schedule) $50 non-refundable application fee $50 non-refundable permit application fee plus a $50 flat fee for residential alterations and additions
Montgomery County $223.87 for an open unenclosed deck 500 SF or less in area; the schedule has the rest Mechanical Permit minimum fee $80.84 for a residential one or two family dwelling; the schedule has the rest $111.94 minimum fee for a residential one or two family dwelling electrical permit; the schedule has the rest

Each cell is taken from that Maryland jurisdiction's own fee schedule; the full wording and source sit on each permit page.

Baltimore County penalty for work started without a permit

Baltimore County publishes what it charges when work begins before the permit, quoted here from the schedule or permit page we verified.

  • Only a licensed electrical contractor registered with Baltimore County can apply, and working without a permit carries a $1,000 civil penalty.

    Baltimore County electrical permit page · last checked

The Maryland statute, the after-the-fact permit path and who may pull the permit: building without a permit in Maryland.

Baltimore County permit questions, answered from the data

Do you need a permit in Baltimore County?
It depends on the project. Of the 10 permit types we cover in Baltimore County, 2 always require a permit (for example a plumbing permit) and 7 depend on size or scope (a deck permit, for instance), and 1 is not confirmed. Each Baltimore County permit type's page states the exact rule and its source.
How much does a permit cost in Baltimore County?
Baltimore County publishes a fee for 9 of the 10 permit types we cover, each quoted on its page from the jurisdiction's own schedule (linked on every page that carries one). Fees are set by Baltimore County Department of Permits, Approvals and Inspections (PAI); we do not estimate or mark them up.
Where do you apply for a permit in Baltimore County?
Baltimore County Department of Permits, Approvals and Inspections (PAI) issues permits in Baltimore County and has an online permit portal, and takes questions at 410-887-3900. The Baltimore County official page and portal are linked in the office section above.
What is the penalty for building without a permit in Baltimore County?
Baltimore County publishes its own charge for work started before the permit: Only a licensed electrical contractor registered with Baltimore County can apply, and working without a permit carries a $1,000 civil penalty. That is the local bill; the Maryland statute, the after-the-fact permit path and who may pull the permit are on the Maryland building-without-a-permit page.

How the Baltimore County pages were verified. 10 permit types, 10 distinct official sources, most recently checked . Every rule is read from Baltimore County Department of Permits, Approvals and Inspections (PAI) or the applicable code and cited on its page; anything we could not confirm for Baltimore County is marked rather than estimated. How we verify.

Permitting activity in Baltimore County

In 2025, Baltimore County authorized permits for 1,531 new residential housing units (1,152 single-family, 379 in multi-family buildings), valued at $336M , up from 1,511 the year before. That works out to about 1.8 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 847,650.

From the Library

Other permit offices in Maryland