Maryland / Baltimore County

Electrical Permit in Baltimore County, Maryland

It depends

Sometimes, depending on the project

Before any electrical work, including extending circuit wiring, low voltage wiring, and connecting replacement equipment to existing wiring. Not needed for ordinary maintenance such as swapping a light fixture or a switch.

Quick answer

Baltimore County requires an electrical permit for essentially all electrical work, including circuit extensions, low voltage wiring, and connecting replacement equipment to existing wiring. The one published exception is ordinary maintenance of existing electrical systems, such as replacing light fixtures and switches. Only a licensed electrical contractor registered with Baltimore County can apply, and working without a permit carries a $1,000 civil penalty.

Issued by
Baltimore County Department of Permits, Approvals and Inspections (PAI)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an electrical permit costs in Baltimore County

Fee schedule in force
Official scheduleRead .
Published in
Electrical Permit Fee Schedule effective 11/26/18:
  • Residential Service (each meter), new, modification, upgrade, replacement or reconnection $34.00;
  • Devices, Renovation or Addition, 1 to 150 devices $68.00;
  • Equipment Only (new or replacement), each piece of equipment $34.00;
  • Swimming Pool $68.00;
  • Solar Photovoltaic System $74.00.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Baltimore County compares in Maryland

JurisdictionPermit needed?Threshold
Anne Arundel CountyIt dependsBefore installing, altering or replacing wiring, circuits, fixtures, panels or services
Baltimore Countythis pageIt dependsBefore any electrical work, including extending circuit wiring, low voltage wiring, and...
Howard CountyPermit requiredAny size
Montgomery CountyPermit requiredDPS lists repairing or replacing electrical plug receptacles in the same location among items that most likely need no permit.
Prince George's CountyPermit requiredAny size

How to apply in Baltimore County

General guide, not specific to this office

What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Baltimore County Department of Permits, Approvals and Inspections (PAI)

  • County Office Building, 111 West Chesapeake Avenue, Towson, Maryland 21204
  • Phone: 410-887-3900

Permitting activity in Baltimore County

In 2025, Baltimore County authorized permits for 1,531 new residential housing units (1,152 single-family, 379 in multi-family buildings), valued at $336M, up from 1,511 the year before. That works out to about 1.8 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 847,650.

What else needs a permit in Baltimore County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsdeck floor area, with a permit also required for any deck more than 16 inches above the lowest gradeBuilding Permit Fee Schedule effective 07/01/26: Decks (Open Deck) (under 600 sf) $105.00
Fence PermitIt dependsfence height measured vertical to ground, including a fence set on top of a wallBuilding Permit Fee Schedule effective 07/01/26 lists Fences, Residential: $35.00 + $0.05 / linear ft, Over 250 linear ft, Minimum $35.00
HVAC PermitIt dependsBefore installing ductwork in a dwelling that has none or adding ductwork not covered by...See schedule
Plumbing PermitPermit requiredAny sizePlumbing Inspection Fee Schedule effective 11/26/18: Inspection, New, for 1st fixture $30.00 plus $6.00 each additional
Pool PermitIt dependsabove-ground pool surface area, where the water depth is 24 inches or more; in-ground pools require a permit at any sizeBuilding Permit Fee Schedule effective 07/01/26: Swimming Pool, Residential, Above Ground $60.00
Roof Replacement PermitIt dependsshare of the sheathing or deck being replaced in a roofing jobA qualifying re-roof is filed as a residential alteration: Additions/Alterations under 600 sf without structural changes $105.00; the schedule has the rest
Shed PermitIt dependsaccessory structure floor areaBuilding Permit Fee Schedule effective 07/01/26: Accessory Structure, Under 1000 sf, $105.00
Solar PermitPermit requiredAny sizeBuilding Permit Fee Schedule effective 07/01/26: Solar Power System, Residential (Roof and Ground Mounted) $100.00; the schedule has the rest

Frequently asked questions

Do you need an electrical permit in Baltimore County?
Sometimes: before any electrical work, including extending circuit wiring, low voltage wiring, and connecting replacement equipment to existing wiring. Not needed for ordinary maintenance such as swapping a light fixture or a switch. If you are unsure how that applies to your project, call the permit office at 410-887-3900 before you start.
How much does an electrical permit cost in Baltimore County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the permit office at 410-887-3900.
Where do you apply for an electrical permit in Baltimore County?
You can apply through the Baltimore County permit portal or contact the Baltimore County Department of Permits, Approvals and Inspections (PAI) directly. The links are listed on this page.
Can a homeowner pull an electrical permit themselves in Baltimore County?
Under Maryland law (Md. Code, Bus. Occ. and Prof. 12-301(b), 6-607(1); Public Safety 12-505): It depends on the trade and the county. Plumbing: state law exempts an individual who personally provides plumbing services in their own residence, but homeowners may not make final connections between the residence and public or private water supply or disposal systems, and Baltimore County plus the WSSC-area counties are largely carved out of the state plumbing title. Electrical: the Maryland Electricians Act prohibits providing electrical services for compensation without a license; it has no express homeowner exemption, so uncompensated work on one's own home falls outside the licensing prohibition, but each county decides whether it will issue an electrical permit to an unlicensed homeowner. Building permits are issued by local jurisdictions, which set their own owner-applicant rules. Confirm how Baltimore County applies this before you apply.

From the Library

Electrical Permit in other Maryland localities

Everything above, sourced

How this electrical permit page for Baltimore County was verified. 2 official sources: baltimorecountymd.gov, baltimorecountymd.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Baltimore County Department of Permits, Approvals and Inspections (PAI). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project