Plumbing Permit in Baltimore County, Maryland
Permit required
Yes, a permit is required
Before any plumbing or gasfitting work, including a water heater replacement, a fixture set, a repipe or a water service connection.
Issued byBaltimore County Department of Permits, Approvals and Inspections (PAI)
By Mario Bailey, verified against official sources
Quick answer
Baltimore County requires a permit for all plumbing and gasfitting work, with no size or cost threshold. Only a plumbing or gasfitting contractor licensed by Baltimore County can pull the permit, so a homeowner cannot file one for their own house. Narrow exceptions to the licensing requirement exist for propane gasfitters holding an insured-to-work certificate, pump installers, water conditioner installers and well drillers.
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Plumbing permits are usually pulled by the plumber doing the job. If you are still choosing one, compare a few quotes first.
Compare plumber quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
When a permit is usually needed
Before any plumbing or gasfitting work, including a water heater replacement, a fixture set, a repipe or a water service connection.
What a plumbing permit costs in Baltimore County
How Baltimore County compares in Maryland
No Maryland jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Baltimore Countythis page | Permit required | ...Fee Schedule effective 11/26/18: Inspection, New, for 1st fixture $30.00... |
| Howard County | Permit required | $50 non-refundable filing fee (other than Express Plumbing Permit) |
| Montgomery County | Permit required | See schedule |
| Prince George's County | It depends | See schedule |
How to apply in Baltimore County
In Baltimore County, you apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit.
What most plumbing permit applications include:
- For Baltimore County, a permit is required before any owner or authorized agent constructs, alters, repairs, removes, converts, or replaces a plumbing system regulated by the code (IRC R105.1).
- For Baltimore County, the application must identify and describe the work, describe the site, state the intended use and occupancy, and be signed by the applicant or an authorized agent (IRC R105.3).
- Two or more sets of construction documents must accompany the application, drawn with enough clarity to show the location, nature, and extent of the proposed plumbing work and how it will conform to code (IRC R106.1, R106.1.1).
- Minor plumbing repairs, such as clearing a stoppage or removing and resetting a water closet without rearranging pipes or fixtures, are exempt from permit (IRC R105.2).
- Once issued, a permit is only valid for a limited window, commonly 180 days, and becomes invalid if the work is not started or is abandoned within that time, though extensions can be requested (IRC R105.3.2, R105.5).
General submittal guidance from 2021 International Residential Code (IRC), Chapter 1 Scope and Administration, Sections R105 Permits and R106 Construction Documents. Source. Baltimore County Department of Permits, Approvals and Inspections (PAI) sets the exact checklist for Baltimore County.
Where to apply in Baltimore County:
Baltimore County Department of Permits, Approvals and Inspections (PAI)
- County Office Building, 111 West Chesapeake Avenue, Towson, Maryland 21204
- Phone: 410-887-3900
Plumbing Permit in Baltimore County compared with nearby Maryland localities
| Locality | Permit needed? | Threshold | What each Maryland schedule says | Verified |
|---|---|---|---|---|
| Baltimore County | Permit required | Any size | ...Inspection Fee Schedule effective 11/26/18: Inspection, New, for 1st fixture $30.00... | |
| Howard County | Permit required | Any size | $50 non-refundable filing fee (other than Express Plumbing Permit) | |
| Montgomery County | Permit required | Any size | See schedule | |
| Prince George's County | It depends | Before installing new plumbing or natural gas piping, before replacing a water heater... | See schedule |
Inspections and closing out your permit
In Baltimore County, plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.
- In Baltimore County: piping and equipment placed under a slab or floor must be in place and inspected before any concrete is poured or floor sheathing is installed over it (IRC R109.1.1.1).
- In Baltimore County: rough plumbing, along with the mechanical, gas, and electrical rough-in, must be inspected prior to covering or concealment and before fixtures or appliances are set (IRC R109.1.2).
- In Baltimore County: rough drain, waste, and vent (DWV) piping is tested with water, air, or (for plastic piping) a vacuum, and must show no evidence of leakage before it is closed in (IRC P2503.5.1).
- In Baltimore County: the water-distribution piping is tested and must hold tight under the system's working pressure, or under a 50 psi air test for non-plastic piping, before it is concealed (IRC P2503.7).
- In Baltimore County: the framing inspection cannot proceed until the plumbing rough inspection, along with the mechanical and electrical rough inspections, has been approved (IRC R109.1.4).
- In Baltimore County: at the final drainage test, each fixture is filled and then drained, and its traps and fixture connections must prove watertight by visual inspection (IRC P2503.5.2).
- In Baltimore County: final inspection is made after all work required by the permit is complete, and includes confirming backflow protection, such as vacuum breakers on hose bibbs, is installed (IRC R109.1.6, P2902.4.3).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Baltimore County permit portal or by phone at 410-887-3900.
Inspection sequence from 2021 International Residential Code (IRC), Section R109 Inspections and Section P2503 Inspection and Tests. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Plumbing Permit checklist for Baltimore County
- Confirm the requirement. Yes, a permit is required. Usually needed: Before any plumbing or gasfitting work, including a water heater replacement, a fixture set, a repipe or a water service connection.
- Budget the fee. Plumbing Inspection Fee Schedule effective 11/26/18: Inspection, New, for 1st fixture $30.00 plus $6.00 each additional; Hot Water Heater, Oil/Electric $30.00; Water Service (each connection) $30.00; On-Site Water (each) $79.00 plus $14.00 each lateral; Swimming Pool $79.00. Gas Permits start at $30.00 for the 1st appliance plus $14.00 each additional. Work started without a permit adds a $60.00 investigation fee. Official fee schedule.
- Apply. In Baltimore County, you apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit. Start at the Baltimore County permit portal.
- Keep the office details handy. Baltimore County Department of Permits, Approvals and Inspections (PAI). Phone: 410-887-3900. Address: County Office Building, 111 West Chesapeake Avenue, Towson, Maryland 21204.
- Plan for inspections. In Baltimore County, plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need a plumbing permit in Baltimore County?
- Baltimore County requires a permit for all plumbing and gasfitting work, with no size or cost threshold. Only a plumbing or gasfitting contractor licensed by Baltimore County can pull the permit, so a homeowner cannot file one for their own house. Narrow exceptions to the licensing requirement exist for propane gasfitters holding an insured-to-work certificate, pump installers, water conditioner installers and well drillers. Always confirm with the Baltimore County Department of Permits, Approvals and Inspections (PAI) before starting.
- How much does a plumbing permit cost in Baltimore County?
- Plumbing Inspection Fee Schedule effective 11/26/18: Inspection, New, for 1st fixture $30.00 plus $6.00 each additional; Hot Water Heater, Oil/Electric $30.00; Water Service (each connection) $30.00; On-Site Water (each) $79.00 plus $14.00 each lateral; Swimming Pool $79.00. Gas Permits start at $30.00 for the 1st appliance plus $14.00 each additional. Work started without a permit adds a $60.00 investigation fee. See the official fee schedule for current amounts.
- Where do you apply for a plumbing permit in Baltimore County?
- You can apply through the Baltimore County permit portal or contact the Baltimore County Department of Permits, Approvals and Inspections (PAI) directly. The links are listed on this page.
- Can a homeowner pull a plumbing permit themselves in Baltimore County?
- Under Maryland law (Md. Code, Bus. Occ. and Prof. 12-301(b), 6-607(1); Public Safety 12-505): It depends on the trade and the county. Plumbing: state law exempts an individual who personally provides plumbing services in their own residence, but homeowners may not make final connections between the residence and public or private water supply or disposal systems, and Baltimore County plus the WSSC-area counties are largely carved out of the state plumbing title. Electrical: the Maryland Electricians Act prohibits providing electrical services for compensation without a license; it has no express homeowner exemption, so uncompensated work on one's own home falls outside the licensing prohibition, but each county decides whether it will issue an electrical permit to an unlicensed homeowner. Building permits are issued by local jurisdictions, which set their own owner-applicant rules. Confirm how Baltimore County applies this before you apply.
From the Library
What else needs a permit in Baltimore County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | deck floor area, with a permit also required for any deck more than 16 inches above the lowest grade | Building Permit Fee Schedule effective 07/01/26: Decks (Open Deck) (under 600 sf) $105.00 |
| Electrical Permit | It depends | Before any electrical work, including extending circuit wiring, low voltage wiring, and... | ...(each meter), new, modification, upgrade, replacement or reconnection... |
| Fence Permit | It depends | fence height measured vertical to ground, including a fence set on top of a wall | Building Permit Fee Schedule effective 07/01/26 lists Fences, Residential: $35.00 +... |
| HVAC Permit | It depends | Before installing ductwork in a dwelling that has none or adding ductwork not covered by... | ...07/01/26 prices Mechanical, HVAC System Only for commercial work only ($100.00... |
| Pool Permit | It depends | above-ground pool surface area, where the water depth is 24 inches or more; in-ground pools require a permit at any size | ...Fee Schedule effective 07/01/26: Swimming Pool, Residential, Above Ground... |
| Roof Replacement Permit | It depends | share of the sheathing or deck being replaced in a roofing job | ...alteration: Additions/Alterations under 600 sf without structural changes $105.00... |
| Shed Permit | It depends | accessory structure floor area | ...Permit Fee Schedule effective 07/01/26: Accessory Structure, Under 1000 sf... |
| Solar Permit | Permit required | Any size | ...07/01/26: Solar Power System, Residential (Roof and Ground Mounted) $100.00, plus... |
Plumbing Permit in other Maryland localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Baltimore County documents; the office above sets the local rules.
How this plumbing permit page for Baltimore County was verified. 2 official sources: baltimorecountymd.gov, baltimorecountymd.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Baltimore County Department of Permits, Approvals and Inspections (PAI). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Compare Plumbing Permit requirements across Maryland localities