Maryland

Building permits in Prince George's County, Maryland

Of the 10 common home projects we have verified in Prince George's County, 3 need a permit outright and 7 depend on size or scope. Click any project for the full rule, fee, and how to apply.

By Mario Bailey Last checked · 2 official sources

Verified against official sources
Project types verified
10
in Prince George's County

Prince George's County Department of Permitting, Inspections and Enforcement (DPIE)

Look up a permit in Prince George's County

Prince George's County runs an online permit portal. Many local portals let you check application status, search permit records, and view inspection results without calling the office.

Search the Prince George's County permit portal

What needs a permit in Prince George's County

Of the 10 common home projects we have verified in Prince George's County, 3 need a permit outright and 7 depend on size or scope. Click any project for the full rule, fee, and how to apply.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedDPIE Fee Schedule, effective March 2, 2025, line item "Deck or Pergola", minimum permit...
Electrical PermitPermit requiredNot specifiedDPIE Fee Schedule, effective March 2, 2025, prices electrical work by item: "Electrical...
Fence PermitIt dependsfence height above grade, with a permit required at any height on a corner lot, in a historic or protected area, or in the 100-year floodplainDPIE Fee Schedule, effective March 2, 2025, line item "Fence - Residential", minimum...
HVAC PermitIt dependsNot specifiedDPIE Fee Schedule, effective March 2, 2025, line item "Mechanical Permit -...
Patio PermitIt dependsarea of an at-grade patio, with a permit required at any size if stairs or ramps are built due to elevation changeDPIE Fee Schedule, effective March 2, 2025, line item "Patio - Residential > 500 Sq Ft"...
Plumbing PermitIt dependsNot specifiedThe DPIE Fee Schedule effective March 2, 2025 carries no residential plumbing permit...
Pool PermitIt dependsprefabricated pools accessory to one- and two-family dwellings that are installed entirely above ground, hold no more than 5,000 gallons, and have a four-foot fence around the pool perimeterDPIE Fee Schedule, effective March 2, 2025: "Swimming Pool (In-ground) - Residential"...
Roof Replacement PermitIt dependsNot specifiedDPIE Fee Schedule, effective March 2, 2025, routes the line item "Roofing - Shingles &...
Shed PermitIt dependsfloor space of a one-story detached accessory structure, and only one such exempt structure is allowed per propertyDPIE Fee Schedule, effective March 2, 2025, line item "Shed > 150 Sq Ft", $1.17 per SF:...
Solar PermitPermit requiredNot specifiedDPIE Fee Schedule, effective March 2, 2025: "Solar Panels (Roof-mounted) - Residential"...

Planning a project in Prince George's County?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

Planning several things at once? Check your whole project

From the Library

Other permit offices in Maryland