It depends
Sometimes, depending on the project
Before building a shed larger than 150 square feet, before building any second shed on a property even if it is small, and before building any shed attached to a building or carport.
By Mario Bailey, verified against official sources
Quick answer
DPIE exempts one detached accessory structure of less than 150 square feet per property, so the first small shed on a lot needs no building permit but a second one of any size does. Sheds over 150 square feet require a permit and a permanent foundation, and any shed attached to a building or carport needs a building permit regardless of size. The exemption does not apply to property classified as a historic site or inside the Chesapeake Bay Critical Area Overlay Zones. If the shed gets electrical service, a separate Electrical Permit is required and only a licensed Master Electrician can apply for it.
Typical threshold: floor space of a one-story detached accessory structure, and only one such exempt structure is allowed per property.

Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
When a permit is usually needed
Before building a shed larger than 150 square feet, before building any second shed on a property even if it is small, and before building any shed attached to a building or carport.
What a shed permit costs in Prince George's County
How Prince George's County compares in Maryland
Across the Maryland jurisdictions we have verified, the same threshold runs from 120 to 200, so a project that is exempt here may still need a permit one county over.
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Baltimore County | It depends | accessory structure floor area |
| Howard County | It depends | sheds under 200 sq ft (one-story, non-conditioned, detached) are exempt from a building permit; 200 sq ft or more requires a Miscellaneous Structures building permit |
| Montgomery County | Permit required | Not specified |
| Prince George's Countythis page | It depends | floor space of a one-story detached accessory structure, and only one such exempt structure is allowed per property |
Closest shed permit thresholds outside Maryland
Jurisdictions we cover whose limit sits nearest Prince George's County's 150 sq ft.
- Alachua County, Florida, area of a single storage shed, exemption available once per property
- Chicago, Illinois, single-story detached tool or storage shed under 150 sq ft and not more than 15 ft tall with no plumbing does not require a permit
- Hillsborough County, Florida, sheds under 150 sq ft are exempt; 150 sq ft or larger require a building permit
- Madison, Wisconsin, shed or accessory building floor area; heated sheds and sheds within ten feet of dwelling units on the property need a permit at any size
How to apply in Prince George's County
A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.
What most shed permit applications include:
- A written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
- A scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
- Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
- Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
- Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).
General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. Prince George's County Department of Permitting, Inspections and Enforcement (DPIE) sets the exact checklist for Prince George's County.
Where to apply in Prince George's County:
Prince George's County Department of Permitting, Inspections and Enforcement (DPIE)
- 9400 Peppercorn Place, Largo, MD 20774
- Phone: 301-636-2000
- Email: dpiebprd@co.pg.md.us
Inspections and closing out your permit
A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.
- Foundation or anchor inspection: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
- Frame inspection: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
- Final inspection: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
- For a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Prince George's County permit portal or by phone at 301-636-2000.
Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Shed Permit checklist for Prince George's County
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: floor space of a one-story detached accessory structure, and only one such exempt structure is allowed per property. Usually needed: Before building a shed larger than 150 square feet, before building any second shed on a property even if it is small, and before building any shed attached to a building or carport.
- Budget the fee. DPIE Fee Schedule, effective March 2, 2025, line item "Shed > 150 Sq Ft", $1.17 per SF: "Total Fee = Administrative Fee $66 + Building Permit Fee (SF x $1.17) + $53 Grading Fee + $5 M-NCPPC. Plus Technology Fee 10%.". Official fee schedule.
- Apply. A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing. Start at the Prince George's County permit portal.
- Keep the office details handy. Prince George's County Department of Permitting, Inspections and Enforcement (DPIE). Phone: 301-636-2000. Address: 9400 Peppercorn Place, Largo, MD 20774.
- Plan for inspections. A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need a shed permit in Prince George's County?
- DPIE exempts one detached accessory structure of less than 150 square feet per property, so the first small shed on a lot needs no building permit but a second one of any size does. Sheds over 150 square feet require a permit and a permanent foundation, and any shed attached to a building or carport needs a building permit regardless of size. The exemption does not apply to property classified as a historic site or inside the Chesapeake Bay Critical Area Overlay Zones. If the shed gets electrical service, a separate Electrical Permit is required and only a licensed Master Electrician can apply for it. Floor space of a one-story detached accessory structure, and only one such exempt structure is allowed per property. Always confirm with the office before starting.
- How much does a shed permit cost in Prince George's County?
- DPIE Fee Schedule, effective March 2, 2025, line item "Shed > 150 Sq Ft", $1.17 per SF: "Total Fee = Administrative Fee $66 + Building Permit Fee (SF x $1.17) + $53 Grading Fee + $5 M-NCPPC. Plus Technology Fee 10%.". See the official fee schedule for current amounts.
- How long does a shed permit take in Prince George's County?
- Sheds are on DPIE's Virtual Permit Center eligible list, where a complete application with fees paid can be issued the same day. Times can vary by workload and project scope, so confirm with the office.
- Where do you apply for a shed permit in Prince George's County?
- You can apply through the Prince George's County permit portal or contact the Prince George's County Department of Permitting, Inspections and Enforcement (DPIE) directly. The links are listed on this page.
- Can a homeowner pull a shed permit themselves in Prince George's County?
- Under Maryland law (Md. Code, Bus. Occ. and Prof. 12-301(b), 6-607(1); Public Safety 12-505): It depends on the trade and the county. Plumbing: state law exempts an individual who personally provides plumbing services in their own residence, but homeowners may not make final connections between the residence and public or private water supply or disposal systems, and Baltimore County plus the WSSC-area counties are largely carved out of the state plumbing title. Electrical: the Maryland Electricians Act prohibits providing electrical services for compensation without a license; it has no express homeowner exemption, so uncompensated work on one's own home falls outside the licensing prohibition, but each county decides whether it will issue an electrical permit to an unlicensed homeowner. Building permits are issued by local jurisdictions, which set their own owner-applicant rules. Confirm how Prince George's County applies this before you apply.
From the Library
What else needs a permit in Prince George's County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Not specified | DPIE Fee Schedule, effective March 2, 2025, line item "Deck or Pergola", minimum permit... |
| Electrical Permit | Permit required | Not specified | DPIE Fee Schedule, effective March 2, 2025, prices electrical work by item: "Electrical... |
| Fence Permit | It depends | fence height above grade, with a permit required at any height on a corner lot, in a historic or protected area, or in the 100-year floodplain | DPIE Fee Schedule, effective March 2, 2025, line item "Fence - Residential", minimum... |
| HVAC Permit | It depends | Not specified | DPIE Fee Schedule, effective March 2, 2025, line item "Mechanical Permit -... |
| Patio Permit | It depends | area of an at-grade patio, with a permit required at any size if stairs or ramps are built due to elevation change | DPIE Fee Schedule, effective March 2, 2025, line item "Patio - Residential > 500 Sq Ft"... |
| Plumbing Permit | It depends | Not specified | The DPIE Fee Schedule effective March 2, 2025 carries no residential plumbing permit... |
| Pool Permit | It depends | prefabricated pools accessory to one- and two-family dwellings that are installed entirely above ground, hold no more than 5,000 gallons, and have a four-foot fence around the pool perimeter | DPIE Fee Schedule, effective March 2, 2025: "Swimming Pool (In-ground) - Residential"... |
| Roof Replacement Permit | It depends | Not specified | DPIE Fee Schedule, effective March 2, 2025, routes the line item "Roofing - Shingles &... |
| Solar Permit | Permit required | Not specified | DPIE Fee Schedule, effective March 2, 2025: "Solar Panels (Roof-mounted) - Residential"... |
Shed Permit in other Maryland localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Prince George's County documents; the office above sets the local rules.
- IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC
- IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC
Verified by a person against the sources above on , not confirmed with Prince George's County Department of Permitting, Inspections and Enforcement (DPIE). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Permit office
Prince George's County Department of Permitting, Inspections and Enforcement (DPIE)
301-636-2000Permit portalMaryland rule changes
- Howard County, MD raises shed and fence permit-exemption limits (CB24-2025)
CB24-2025 (Bill No. 24-2025) ·
- Montgomery County, MD FY27 permit fee schedules take effect
FY27 Fee Schedule (Council-approved FY27 Budget) ·
Compare
Shed Permit across Maryland