Maryland / Prince George's County

Shed Permit in Prince George's County, Maryland

It depends

Sometimes, depending on the project

Before building a shed larger than 150 square feet, before building any second shed on a property even if it is small, and before building any shed attached to a building or carport.

Quick answer

DPIE exempts one detached accessory structure of less than 150 square feet per property, so the first small shed on a lot needs no building permit but a second one of any size does. Sheds over 150 square feet require a permit and a permanent foundation, and any shed attached to a building or carport needs a building permit regardless of size. The exemption does not apply to property classified as a historic site or inside the Chesapeake Bay Critical Area Overlay Zones. If the shed gets electrical service, a separate Electrical Permit is required and only a licensed Master Electrician can apply for it.

Diagram of the 150 sq ft footprint area threshold for a shed permit in Prince George's County, Maryland
Threshold illustrated: 150 sq ft. Whether Prince George's County requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-08-16.
Typical threshold
floor space of a one-story detached accessory structure, and only one such exempt structure is allowed per property
Issued by
Prince George's County Department of Permitting, Inspections and Enforcement (DPIE)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

If a contractor builds or places your shed, they usually handle any required permit. Compare a few bids before you commit.

Compare contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

Shed size, height and setback rules in Prince George's County

Height limit
In the RSF-95 zone, an accessory structure such as a shed or detached garage may be at most 15 feet tall. online.encodeplus.com: doc view
Placement
Unless a specific accessory-use standard says otherwise, no accessory structure may be located in a required front yard or a corner lot side yard. online.encodeplus.com: doc view
Setback
An accessory structure may sit in a required side or rear yard, but one taller than ten feet (other than a fence or wall) must be set back from the nearest side or rear lot line one foot for every foot of height above ten feet. online.encodeplus.com: doc view

What a shed permit costs in Prince George's County

Fee schedule in force
Official scheduleRead .

DPIE Fee Schedule, effective October 16, 2026, line item "Shed > 150 Sq Ft", $1.17 per SF: "Total Fee = Administrative Fee $66 + Building Permit Fee (SF x $1.17) + $53 Grading Fee + $5 M-NCPPC. Plus Technology Fee 10%."

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Prince George's County compares in Maryland

Across the Maryland jurisdictions we have verified, the same threshold runs from 120 to 200, so a project that is exempt here may still need a permit one county over.

JurisdictionPermit needed?Threshold
Anne Arundel CountyIt dependsone-story detached shed accessory to a residence, not over 10 feet in height; every shed in the Chesapeake Bay Critical Area and any shed within 3 feet of the house needs a permit
Baltimore CountyIt dependsaccessory structure floor area
Howard CountyIt dependssheds under 200 sq ft (one-story, non-conditioned, detached) are exempt from a building permit; 200 sq ft or more requires a Miscellaneous Structures building permit
Montgomery CountyPermit requiredAny size
Prince George's Countythis pageIt dependsfloor space of a one-story detached accessory structure, and only one such exempt structure is allowed per property

How to apply in Prince George's County

General guide, not specific to this office

What a shed permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a shed permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Prince George's County Department of Permitting, Inspections and Enforcement (DPIE)

Permitting activity in Prince George's County

In 2025, Prince George's County authorized permits for 2,090 new residential housing units (1,530 single-family, 560 in multi-family buildings), valued at $616M, up from 1,473 the year before. That works out to about 2.2 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 970,374.

What else needs a permit in Prince George's County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeSee schedule
Electrical PermitPermit requiredAny sizeDPIE Fee Schedule, effective March 2, 2025, prices electrical work by item: "Electrical Permit Fee - Rough Wire Outlet, Segment of 15" $50
Fence PermitIt dependsfence height above grade, with a permit required at any height on a corner lot, in a historic or protected area, or in the 100-year floodplainSee schedule
HVAC PermitIt dependsBefore installing or replacing a furnace, boiler, heat pump, central air conditioner...See schedule
Patio PermitIt dependsarea of an at-grade patio, with a permit required at any size if stairs or ramps are built due to elevation changeSee schedule
Plumbing PermitIt dependsBefore installing new plumbing or natural gas piping, before replacing a water heater...See schedule
Pool PermitIt dependsprefabricated pools accessory to one- and two-family dwellings that are installed entirely above ground, hold no more than 5,000 gallons, and have a four-foot fence around the pool perimeterDPIE Fee Schedule, effective March 2, 2025: "Swimming Pool (In-ground) - Residential", minimum permit fee $297; the schedule has the rest
Roof Replacement PermitIt dependsBefore replacing roof sheathing or plywood, or doing any roof work that involves...See schedule
Solar PermitPermit requiredAny sizeDPIE Fee Schedule, effective March 2, 2025: "Solar Panels (Roof-mounted) - Residential", minimum permit fee $158; the schedule has the rest

Frequently asked questions

Do you need a shed permit in Prince George's County?
It depends on the project. Floor space of a one-story detached accessory structure, and only one such exempt structure is allowed per property. If you are unsure how that applies to your project, call the permit office at 301-636-2000 before you start.
How much does a shed permit cost in Prince George's County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 13 Nov 2026. For the figure on your own project, call the permit office at 301-636-2000.
How long does a shed permit take in Prince George's County?
Sheds are on DPIE's Virtual Permit Center eligible list, where a complete application with fees paid can be issued the same day. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a shed permit in Prince George's County?
You can apply through the Prince George's County permit portal or contact the Prince George's County Department of Permitting, Inspections and Enforcement (DPIE) directly. The links are listed on this page.
Can a homeowner pull a shed permit themselves in Prince George's County?
Under Maryland law (Md. Code, Bus. Occ. and Prof. 12-301(b), 6-607(1); Public Safety 12-505): It depends on the trade and the county. Plumbing: state law exempts an individual who personally provides plumbing services in their own residence, but homeowners may not make final connections between the residence and public or private water supply or disposal systems, and Baltimore County plus the WSSC-area counties are largely carved out of the state plumbing title. Electrical: the Maryland Electricians Act prohibits providing electrical services for compensation without a license; it has no express homeowner exemption, so uncompensated work on one's own home falls outside the licensing prohibition, but each county decides whether it will issue an electrical permit to an unlicensed homeowner. Building permits are issued by local jurisdictions, which set their own owner-applicant rules. Confirm how Prince George's County applies this before you apply.

From the Library

Shed Permit in other Maryland localities

Everything above, sourced

How this shed permit page for Prince George's County was verified. 2 official sources: princegeorgescountymd.gov, princegeorgescountymd.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Prince George's County Department of Permitting, Inspections and Enforcement (DPIE). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project