Maryland / Prince George's County
HVAC Permit in Prince George's County, Maryland
It depends
Sometimes, depending on the project
Before installing or replacing a furnace, boiler, heat pump, central air conditioner, electronic air cleaner, humidifier or attic fan. Portable and window units connected by cord and plug need no permit.
Quick answer
Permanently installed heating and cooling equipment requires a Mechanical Permit in Prince George's County, and the same jobs usually require an Electrical Permit as well, while gas-fired equipment adds a WSSC gasfitting permit. The county's published exemptions are narrow and portability-based: portable heating appliances, portable ventilation equipment, portable cooling units and portable evaporative coolers, plus one-to-one in-kind replacement of household appliances such as a stove, refrigerator, washer or dryer. DPIE's own chart makes the same point from the other side, marking a window air conditioner as needing no permit with the footnote that a cord and plug connection does not require a permit. Only a Maryland-licensed Master HVACR contractor may register for and pull a mechanical permit; homeowners cannot.
- Issued by
- Prince George's County Department of Permitting, Inspections and Enforcement (DPIE)
- Phone
- 301-636-2000
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
HVAC contractors usually pull this permit as part of the job. If you have not picked one yet, compare a few quotes before you commit.
Compare HVAC contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What an HVAC permit costs in Prince George's County
- Fee schedule in force
- Official scheduleRead .
DPIE Fee Schedule, effective October 16, 2026, line item "Mechanical Permit - Commercial/Residential", minimum permit fee $86: "Total Fee = Administrative Fee $66 + Mechanical Fee ($86 or 1.3% of Mechanical Construction Cost, whichever is greater). Plus Technology Fee 10%."
The companion electrical permits are priced separately at "Electrical Permit Fee - Heating Equipment Unit" $50 and "Electrical Permit Fee - A/C Equipment Unit" $50, each plus the $66 administrative fee and the 10% technology fee.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Prince George's County compares in Maryland
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Anne Arundel County | It depends | Before installing or replacing a furnace, heat pump, central air conditioner or ductwork |
| Baltimore County | It depends | Before installing ductwork in a dwelling that has none or adding ductwork not covered by... |
| Howard County | It depends | permit required for new installations, fuel or energy source conversions, new or altered systems and duct extensions, and replacement with a change of fuel or power source; not required for exact replacement of existing electrical HVAC equipment |
| Montgomery County | Permit required | No permit for portable cooling units and portable ventilation equipment, replacement of a minor part that does not alter the approval of the equipment, or replacement of components within a unit such as compressors or burners. |
| Prince George's Countythis page | It depends | Before installing or replacing a furnace, boiler, heat pump, central air conditioner... |
How to apply in Prince George's County
General guide, not specific to this office
What an HVAC permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an HVAC permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Prince George's County Department of Permitting, Inspections and Enforcement (DPIE)
- 9400 Peppercorn Place, Largo, MD 20774
- Phone: 301-636-2000
- Email: dpiebprd@co.pg.md.us
Your HVAC Permit checklist for Prince George's County
- Confirm the requirement. Sometimes, depending on the project. Read the rule where we read it: princegeorgescountymd.gov: permitting inspections and enforcement.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Prince George's County permit portal.
- Keep the office details handy. Prince George's County Department of Permitting, Inspections and Enforcement (DPIE). Phone: 301-636-2000. Email: dpiebprd@co.pg.md.us. Address: 9400 Peppercorn Place, Largo, MD 20774.
Compiled from the official sources on this page. Last checked .
Permitting activity in Prince George's County
In 2025, Prince George's County authorized permits for 2,090 new residential housing units (1,530 single-family, 560 in multi-family buildings), valued at $616M, up from 1,473 the year before. That works out to about 2.2 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 970,374.
What else needs a permit in Prince George's County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Any size | See schedule |
| Electrical Permit | Permit required | Any size | See schedule |
| Fence Permit | It depends | fence height above grade, with a permit required at any height on a corner lot, in a historic or protected area, or in the 100-year floodplain | See schedule |
| Patio Permit | It depends | area of an at-grade patio, with a permit required at any size if stairs or ramps are built due to elevation change | See schedule |
| Plumbing Permit | It depends | Before installing new plumbing or natural gas piping, before replacing a water heater... | See schedule |
| Pool Permit | It depends | prefabricated pools accessory to one- and two-family dwellings that are installed entirely above ground, hold no more than 5,000 gallons, and have a four-foot fence around the pool perimeter | DPIE Fee Schedule, effective October 16, 2026: "Swimming Pool (In-ground) - Residential", minimum permit fee $297; the schedule has the rest |
| Roof Replacement Permit | It depends | Before replacing roof sheathing or plywood, or doing any roof work that involves... | See schedule |
| Shed Permit | It depends | floor space of a one-story detached accessory structure, and only one such exempt structure is allowed per property | See schedule |
| Solar Permit | Permit required | Any size | DPIE Fee Schedule, effective October 16, 2026: "Solar Panels (Roof-mounted) - Residential", minimum permit fee $158; the schedule has the rest |
Frequently asked questions
- Do you need an HVAC permit in Prince George's County?
- Sometimes: before installing or replacing a furnace, boiler, heat pump, central air conditioner, electronic air cleaner, humidifier or attic fan. Portable and window units connected by cord and plug need no permit. If you are unsure how that applies to your project, call the permit office at 301-636-2000 before you start.
- How much does an HVAC permit cost in Prince George's County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 17 Nov 2026. For the figure on your own project, call the permit office at 301-636-2000.
- Where do you apply for an HVAC permit in Prince George's County?
- You can apply through the Prince George's County permit portal or contact the Prince George's County Department of Permitting, Inspections and Enforcement (DPIE) directly. The links are listed on this page.
- Can a homeowner pull an HVAC permit themselves in Prince George's County?
- Under Maryland law (Md. Code, Bus. Occ. and Prof. 12-301(b), 6-607(1); Public Safety 12-505): It depends on the trade and the county. Plumbing: state law exempts an individual who personally provides plumbing services in their own residence, but homeowners may not make final connections between the residence and public or private water supply or disposal systems, and Baltimore County plus the WSSC-area counties are largely carved out of the state plumbing title. Electrical: the Maryland Electricians Act prohibits providing electrical services for compensation without a license; it has no express homeowner exemption, so uncompensated work on one's own home falls outside the licensing prohibition, but each county decides whether it will issue an electrical permit to an unlicensed homeowner. Building permits are issued by local jurisdictions, which set their own owner-applicant rules. Confirm how Prince George's County applies this before you apply.
From the Library
HVAC Permit in other Maryland localities
Everything above, sourced
How this HVAC permit page for Prince George's County was verified. 2 official sources: princegeorgescountymd.gov, princegeorgescountymd.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Prince George's County Department of Permitting, Inspections and Enforcement (DPIE). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page