Guide
Do You Need a Permit for a Shed in Maryland? Size Limits, Setbacks and Fees by County
Maryland has no statewide shed exemption. Your county decides: Montgomery permits every shed, Baltimore County anything over 120 sq ft, Prince George's and Anne Arundel over 150, Howard at 200. Where the shed may sit, the Critical Area rules, wiring, anchoring and the fee, from each county's own pages.
Maryland has no statewide rule for sheds. The state adopts one building code, but the law hands enforcement to the county: “the county in which a building or structure is located shall implement and enforce the Standards,” and where a county amends them, “the local amendment prevails in the local jurisdiction.” So the answer depends on which county you live in, and across five of the state’s largest counties it runs from “every shed needs a permit” to “under 200 square feet needs none.”
- Montgomery County
- Permit for every shedZoning review at any size
- Baltimore County
- Permit over 120 sq ftAny size in a historic district, floodplain or the Critical Area
- Prince George's County
- Permit over 150 sq ftOne small shed per lot without a permit
- Anne Arundel County
- Permit over 150 sq ft or over 10 ft tallAny size in the Critical Area or within 3 ft of the house
- Howard County
- Permit over 200 sq ftExactly 200: ask. No exemption in the floodplain
Even where no building permit is needed, zoning still decides where the shed may sit, and the Chesapeake Bay Critical Area adds its own limits near the water. Both are covered below, county by county, with the fee each office charges today.
The next step: find your county below, measure the shed’s floor area (length times width) and its height, and check whether your lot is within 1,000 feet of tidal water before you order the kit.
First, check whether your town runs its own permits
The county is the default, not the rule everywhere. State law lets a municipality enforce the building code inside its own borders, and a town that already had its own code by October 1, 1992 must do so unless it hands the job back to the county. In practice:
- Montgomery County warns on its own shed page: “You may also need a permit or other permission if you live a Montgomery County municipality that requires it.”
- Prince George’s County says there are 27 municipalities in the county and “Permit requirements vary depending on the municipality.”
- Anne Arundel County contains the City of Annapolis, which takes its own permit applications through the city’s Citizen Self Service portal.
- Baltimore County and Howard County have no incorporated towns, so the county office is the only one. Baltimore City is a separate government with its own permit office, and nothing on this page applies there.
If your address is inside a town, call the town first. Its rules can be stricter than the county’s.
Montgomery County: a permit for every shed
Montgomery County has no size exemption at all. The Department of Permitting Services (DPS) states it plainly: “A building permit is required to install, move or construct any shed in Montgomery County. A Zoning review for the proposed location of the shed is required.”
Size changes the paperwork, not the answer:
- 200 square feet or less, one story: “A one-story shed, with a floor area of 200-square-feet or less, does not require a structural review,” and these applications “may be processed via our Fast Track program.”
- Larger or two-story sheds: “All other sheds require a set of construction plans, drawn to scale,” and “Multi-story sheds and those with a floor area greater than 200 square feet must have footings and floors designed in accordance with the International Residential Code for One- and Two-Family Dwellings, 2021 edition, as amended,” with footing, framing, wall bracing and final inspections. DPS says these take “up to 17 days to issue the permit” when the application is complete.
- Every shed: a site plan or house location survey “showing the location of the shed, along with setback distances,” and, once it is in, “a final inspection to verify the proper location and anchorage.”
Where it can go: “An accessory structure or building on a residential lot must be in the rear yard.” The county’s zone guidance sheets, which DPS marks for guidance only, give these limits for an accessory building in the most common single-family zones:
| Zone | Side setback | Rear setback | Maximum height |
|---|---|---|---|
| R-60 | 5 ft | 5 ft | 20 ft |
| R-90 | 5 ft | 5 ft | 20 ft |
| R-200 | 12 ft | 7 ft | 35 ft |
In R-60 and R-90, two rules push a bigger shed farther from the line. If its side along a rear or side lot line is longer than 24 feet, the setback grows “2 ft. of setback for every 2 ft. that the structure dimension exceeds 24 ft,” and if it is taller than 15 feet, the side and rear setback grows “2 ft. of additional setback for each foot of height over 15 ft.” The footprint of an accessory building “must not exceed 50% of the footprint of the main building (one-family detached dwelling) or 600 sq/ft whichever is greater.” Because those sheets are guidance and date from 2017, confirm your zone’s numbers with DPS before you set the shed.
Playhouses are treated differently: the county’s Home Improvements list names “Swings or other playground equipment, playhouses, treehouses or similar structures” among the work that most likely needs no permit, while sheds sit on the permit side of the same list. Our guide to treehouse, playset and swing set permits covers play structures elsewhere.
The fee is the county’s accessory building line: $136.80 for 200 square feet or less, or $0.88305 per square foot for larger buildings, under the schedule in force from July 1, 2026. The same schedule lists a filing fee for additions and alterations; DPS calculates the final fee when the permit is issued, so ask whether it applies to your shed.
- Fee schedule in force
- Official scheduleRead .
Priced as an Accessory Building: $136.80 for 200 SF or less, or $0.88305 per SF for the line the schedule labels "greater than 201 SF", per the DPS Residential Building Fees schedule effective July 1, 2026 to June 30, 2027.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
Montgomery County shed permit page: the office, the portal and the full rule.
Questions go to MC 311 at 240-777-0311.
Prince George’s County: one small shed per lot
Prince George’s County exempts one shed and only one. The Department of Permitting, Inspections and Enforcement (DPIE) says: “Only one (1) shed that is less than 150 sq. ft. can exist on a property without a permit.” Its permit chart words the same line as a storage shed “that is 150 square feet or less (only one allowed per lot without permit).” The two pages disagree at exactly 150 square feet, so a shed of exactly that size is safest treated as needing a permit, or confirmed with DPIE first.
Beyond that one shed:
- “Sheds over 150 sq. ft. require a permanent foundation and a permit.”
- “Any shed that is attached to a building or carport” needs a building permit at any size.
- A second shed on the same lot needs a permit even if it is small.
- The exemption does not apply on a property classified as a historic site or inside the Chesapeake Bay Critical Area Overlay Zones, according to DPIE’s Homeowner Residential Permitting Guide (section 2.1).
Where it can go, under the county’s zoning ordinance in force since April 1, 2022: “No accessory structure shall be located in a required front yard or corner lot side yard.” A shed may sit in a required side or rear yard, but one “that is more than ten feet in height is set back from the nearest side or rear lot line one foot for every foot (or fraction thereof) the structure’s height exceeds ten feet.” The maximum height for an accessory structure is 15 feet in the RR, RSF-95 and RSF-65 zones. A shed also cannot sit “within any platted or recorded easement or over any known utility.”
Once you have a permit, keep it moving: “Inspections must be requested and conducted at least once every six months until the completion of the shed,” and “Building Permits are valid for six (6) months after initial issuance, or for six (6) months after the latest inspection took place.” Inspections are booked at 301-755-9000.
The fee for a shed over 150 square feet, on the schedule effective October 16, 2026, is “Administrative Fee $66 + Building Permit Fee (SF × $1.17) + $53 Grading Fee + $5 M-NCPPC. Plus Technology Fee 10%.” For a 10 by 16 foot shed (160 square feet) the building permit part is $187.20, before the other fees are added.
- Fee schedule in force
- Official scheduleRead .
DPIE Fee Schedule, effective October 16, 2026, line item "Shed > 150 Sq Ft", $1.17 per SF: "Total Fee = Administrative Fee $66 + Building Permit Fee (SF x $1.17) + $53 Grading Fee + $5 M-NCPPC. Plus Technology Fee 10%."
Fees are the jurisdiction’s; we do not mark them up or estimate them.
Prince George's County shed permit page: the office, the portal and the full rule.
DPIE’s main number is 301-636-2000.
Anne Arundel County: 150 square feet and 10 feet tall
Outside Annapolis, Anne Arundel County’s Department of Inspections and Permits states the exemption in one sentence: “Sheds that do not exceed 10 feet in height and have a floor area of 150 square feet or less do not require a building permit, except that permits are required for all sheds in the critical area.” The 150 square foot figure dates from Bill 14-21, effective May 3, 2021.
Two catches matter on a typical lot:
- Distance from the house: “A shed within 3’ of the principal structure is considered attached and ALWAYS requires a permit.” A shed tucked against the back wall is reviewed as part of the house.
- The Critical Area: on a lot in the Chesapeake Bay Critical Area, every shed needs a permit, whatever its size. The section on the Critical Area below explains what else changes there.
Setbacks depend on your zoning district, and the county does not publish a single table a homeowner can rely on. Its zoning office asks you to call: “For specific information on your property’s setbacks, please contact the Zoning Administration Section at 410-222-7437.”
Building permits here are priced by the value of the work, starting at an $86 minimum for work valued up to $3,000, plus “A non-refundable application fee of $43.00.”
- Fee basis
- Project valuation
- Fee schedule in force
- Official scheduleRead .
Building permits are valuation-based: "$0-$3,000 | $86.00" rising to "Above $25,000 | $242.00 plus .010 times estimated cost above $25,000.00", plus "A non-refundable application fee of $43.00 will be added to all building permits."
Minimum Building Permit Fee $86.00, effective October 1, 2024 (Permit Fees page).
Fees are the jurisdiction’s; we do not mark them up or estimate them.
Anne Arundel County shed permit page: the office, the portal and the full rule.
Permit questions go to (410) 222-7730.
Baltimore County: anything over 120 square feet
Baltimore County’s Permits, Approvals and Inspections (PAI) office draws the smallest line of the five: “A building permit is required for accessory structures greater than 120 square feet, and for all accessory structures, regardless of size, that are located” in a proposed or designated historic district, in the floodplain, in the Chesapeake Bay Critical Area, or on the Baltimore County Landmarks List. A common 10 by 12 foot shed is exactly 120 square feet and sits right on that line, so measure before you buy.
Where it can go, from the same page:
- “Must be located in the rear yard behind the rear foundation wall line, unless a zoning variance is obtained.” The county’s zoning page adds that side yard placement is allowed only in the RC 6, RC 7 and RC 8 zones.
- “Must be located 2.5 feet from the side and rear property lines, however any side closer than five feet to the property line requires a one-hour fire-rated safety wall and no openings on that side.”
- “There is a height limitation of 15 feet,” and on a corner lot the shed must sit “in the half of the lot furthest from the side street.”
- With an alley behind the lot, “there must be a minimum setback of 15 feet from the centerline.”
Foundations follow size. PAI’s foundation handout: “Accessory storage buildings of lightframe construction* up to 400 sf in area: No permanent foundation is required, but the building must be anchored. Eave height must not exceed 10 feet.” The accessory structure page: “If larger than 400 square feet, it requires frost-line footings.” Construction plans are required at 1,000 square feet and over.
One line on the PAI page reads “A MHIC Licensed Contractor must be used,” with no homeowner exception stated. If you plan to build the shed yourself, ask PAI how that applies to you before you apply.
The fee is $105.00 for an accessory structure under 1,000 square feet on the schedule effective 07/01/26, plus the $75.00 residential application fee.
- Fee schedule in force
- Official scheduleRead .
- Published in
- Building Permit Fee Schedule effective 07/01/26:
Accessory Structure, Under 1000 sf, $105.00;
Accessory Structure, 1000 sf and over, $160.00, plus the $75.00 residential permit application fee.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
Baltimore County shed permit page: the office, the portal and the full rule.
PAI answers at 410-887-3900.
Howard County: the 200 square foot line
Howard County adopted the 2024 codes, with its own amendments, in Council Bill 24-2025. The bill writes the shed exemption twice. It raises the model code’s size to “200 SQUARE FEET WITH A ROOF EAVE HEIGHT OF NOT MORE THAN 10 FT,” and separately exempts “ONE STORY NON-CONDITIONED DETACHED ACCESSORY STRUCTURES LESS THAN 200 SQUARE FEET IN AREA,” naming storage sheds, gazebos and playhouses. The county’s fee schedule starts charging at a “shed over 200 square feet.” A shed under 200 square feet needs no building permit; at exactly 200, the bill’s two lines read differently, so ask the county.
The exemption has one firm limit: “EXEMPTIONS DO NOT APPLY TO STRUCTURES LOCATED IN THE FLOODPLAIN.” In a floodplain, a shed of any size needs a permit.
Howard limits how much shed a lot can hold, not just where it sits. The zoning regulations cap the combined footprint of all accessory structures on a single-family lot at 600 square feet in the planned public water and sewer service area, 1,200 square feet on an RC or RR lot of 2 acres or less, and 2,200 square feet on a larger one. The planning department adds that “Garages/accessory buildings cannot be larger than the principal use building.” Setbacks vary by zoning district; the Department of Planning and Zoning’s Planner of the Day at 410-313-2350 will read yours for you.
A shed over 200 and up to 400 square feet costs $50 per structure on the FY27 schedule, plus the county’s 10 percent technology fee.
- Permit fee
- $50shed permit, from the published schedule
- Fee schedule in force
- Official scheduleRead .
$50 per structure for sheds over 200 and up to 400 sq ft (Miscellaneous Structures Accessory permit, FY2027 fee schedule);
sheds under 200 sq ft need no permit or fee.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
Howard County shed permit page: the office, the portal and the full rule.
The permits division is at 410-313-2455.
The Chesapeake Bay Critical Area changes the answer near the water
If your lot is within 1,000 feet of the landward edge of tidal waters or tidal wetlands, it is probably in the Critical Area, and a shed there is a different project.
- A permit at any size. Anne Arundel County requires a permit “for all sheds in the critical area,” Baltimore County lists the Critical Area among the locations where every accessory structure needs one, and Prince George’s small-shed exemption does not apply inside its Critical Area overlay zones.
- The shed counts against your lot coverage. State law defines lot coverage to include any area “Occupied by a structure, accessory structure, parking area, driveway, walkway, or roadway,” and in the limited development and resource conservation areas “lot coverage is limited to 15% of a parcel or lot.” Older small lots get different limits. If your house, driveway and patio already use your allowance, the shed may not fit without county approval.
- The 100-foot buffer. The Critical Area Commission requires “a minimum 100-foot Buffer adjacent to all tidal waters, tidal wetlands, and tributary streams,” and in it new structures “are not permitted” in general. A shed in the buffer usually needs a variance.
Ask your county’s permit office whether your parcel is mapped in the Critical Area before you pick a spot. The Critical Area Commission says “Most residential building permits do not require review or approval by the Critical Area Commission and can be handled by the local government.”
Running power to the shed
A light and an outlet turn a shed into an electrical permit, even where the shed itself needs none. Prince George’s says it directly: “If electrical service is included with the project, an Electrical Permit is required.” Anne Arundel County requires separate trade permits for electrical work, done by tradesmen licensed in the county. In Montgomery County the electrical permit applicant “must have a valid Masters license issued by the Maryland State Board of Electricians,” although homeowners who meet the county’s criteria “may take an examination to obtain a permit for a limited scope of work.” In Howard and Baltimore counties, call the permit office about the electrical side before the trench is dug.
Anchoring and foundations
Wind is the reason counties care how a shed is held down. Montgomery County: “Sheds must be anchored to resist wind loads (min.15 lb/ft2 lateral load) as required by the building code or using other hardware installed in accordance with the manufacturer’s specifications.” Baltimore County requires a light-frame shed up to 400 square feet to be anchored, and frost-line footings above that size. Prince George’s requires a permanent foundation for any shed over 150 square feet. A shed that sits on blocks with nothing tying it down can fail a final inspection in Montgomery County even if everything else is right.
Who may build it
Maryland’s home improvement law reaches sheds, but only when a contractor installs one. The Maryland Home Improvement Commission: “A home improvement license is required if the shed will be permanently installed by the contractor on land adjacent to residence. If the contractor sells and delivers the shed and simply places it on the ground, or on a non-permanent foundation such as cinder blocks, the contractor is not required to hold an MHIC license.” Montgomery County lets homeowners apply in their own name, and says “A contractor must have a Maryland Home Improvement Commission (MHIC) license to obtain a permit.” You can check a license on the state’s contractor lookup.
Before you order the shed
- Find out whether your address is in an incorporated town, and if it is, call the town.
- Measure the floor area and the height as built, including any loft or overhang the kit adds.
- Ask the county whether your lot is in the Critical Area or a floodplain, or is a historic property. Each of those removes the small-shed exemption in at least one county.
- Pick a spot in the rear yard that clears your county’s side and rear setbacks, any easement and, in Anne Arundel County, the 3 foot line from the house.
- If you want power, plan the electrical permit now.
- Apply before the delivery date. A Montgomery County Fast Track shed permit is quick, but nothing is quicker than not having to remove a shed later. If one is already up without a permit, the Maryland building without a permit guide covers how a county handles it.
Building something bigger than a shed? The detached garage and pole barn guide covers the same five counties, and the Maryland fence permit guide covers the fence around it.
Sources
- Maryland Code, Public Safety 12-505: the county where a building sits enforces the Maryland Building Performance Standards, and a municipality may enforce them inside its own borders. (accessed )
- Maryland Code, Public Safety 12-504(c): where a local amendment conflicts with the state Standards, the local amendment prevails. (accessed )
- COMAR 09.12.51.04: the 2021 International Residential Code is the state baseline residential code. (accessed )
- Maryland Department of Labor building codes news: the June 26, 2026 proposal to adopt the 2024 codes was withdrawn in its entirety (Maryland Register, October 16, 2026). (accessed )
- Maryland Code, Natural Resources 8-1802(a)(21): Critical Area lot coverage includes any area occupied by an accessory structure. (accessed )
- Maryland Code, Natural Resources 8-1808.3(d)(1): lot coverage in the limited development and resource conservation areas is limited to 15% of a parcel or lot. (accessed )
- Critical Area Commission, the Buffer: a minimum 100-foot buffer along tidal waters, tidal wetlands and tributary streams, where new structures are generally not permitted. (accessed )
- Maryland Home Improvement Commission FAQ: a contractor who permanently installs a shed needs an MHIC license; one who delivers it onto the ground or blocks does not. (accessed )
- Montgomery County DPS, Residential Sheds Permit Process: a building permit and a zoning review for any shed, the 200 square foot structural review line, Fast Track, the site plan, the final inspection, the municipality warning and the MHIC rule. (accessed )
- Montgomery County DPS, Building Permit Guidelines for Sheds in Residential Zones (revised 7/14/2026): zoning applies at any size, anchoring to a 15 lb/ft2 lateral load, footings for larger sheds. (accessed )
- Montgomery County DPS, Residential Accessory Structure Permit Process: an accessory building on a residential lot must be in the rear yard. (accessed )
- Montgomery County DPS development standards sheet for the R-90 zone (marked for guidance only): accessory building height, setbacks, the 24 foot and 15 foot setback increases and the footprint cap. (accessed )
- Montgomery County DPS development standards sheet for the R-200 zone (marked for guidance only): accessory building height and setbacks. (accessed )
- Montgomery County DPS Residential Building Fees, effective July 1, 2026 to June 30, 2027: accessory building fees and the filing fee line. (accessed )
- Prince George's County DPIE, Sheds: one shed under 150 square feet per property without a permit, the permanent foundation over 150, the electrical permit, inspections and permit validity. (accessed )
- Prince George's County DPIE, When Is a Permit Required?: the 150 square foot storage shed row, the larger shed row and the attached shed row. (accessed )
- Prince George's County Zoning Ordinance (Subtitle 27, effective April 1, 2022): Sec. 27-5202 accessory structure location rules and the 15 foot accessory structure height in the RR, RSF-95 and RSF-65 zones. (accessed )
- Prince George's County DPIE Fee Schedule, effective October 16, 2026: the shed over 150 square feet line and the 10 percent technology fee. (accessed )
- Anne Arundel County Inspections and Permits, Do I Need a Permit?: the 10 foot and 150 square foot shed exemption, the Critical Area rule and the 3 foot attached-shed rule. (accessed )
- Anne Arundel County Bill 14-21 (effective May 3, 2021): Construction Code 105.2.1.1 raised to 150 square feet for a shed accessory to a residence. (accessed )
- Anne Arundel County Office of Planning and Zoning, Zoning FAQs: setbacks for a specific property from the Zoning Administration Section. (accessed )
- Anne Arundel County Permit Fees: valuation-based building permit fees, the $86 minimum and the $43 application fee; trade permits separate; homeowners may apply for their own owner-occupied dwelling. (accessed )
- Baltimore County PAI, Residential Accessory Structure Permit: the 120 square foot threshold, the any-size locations, rear yard placement, 2.5 foot setbacks, the 15 foot height limit, corner lots, plans at 1,000 square feet and the MHIC line. (accessed )
- Baltimore County PAI handout, Sheds and Accessory Storage Structures: Foundation Requirements (Rev 11/25): anchoring up to 400 square feet, a permanent foundation 30 inches below grade above that. (accessed )
- Baltimore County PAI Zoning Review: accessory structures 2.5 feet from rear and side lines, 15 feet tall without a variance, side yard placement only in RC 6, RC 7 and RC 8. (accessed )
- Baltimore County Building Permit Fee Schedule, effective 07/01/26: accessory structure fees and the $75 residential application fee. (accessed )
- Howard County Council Bill 24-2025, amendments to IBC 2024 Section 105.2: the 200 square foot exemption with a 10 foot eave height, the one-story non-conditioned exemption under 200 square feet, and the floodplain exclusion. (accessed )
- Howard County FY27 Building Permit Fee Schedule (Council Resolution 83-2026, effective July 1, 2026): the $50 shed line and the 10 percent technology fee. (accessed )
- Howard County ZRA-218 Technical Staff Report (October 2025), reproducing current Zoning Regulations Sec. 128.0.A.12: the cumulative lot coverage cap for accessory structures. (accessed )
- Howard County Department of Planning and Zoning FAQ: accessory buildings cannot be larger than the house, and detached structures meet accessory setbacks. (accessed )
- Howard County Department of Planning and Zoning, Resident Resources: the Planner of the Day line, 410-313-2350. (accessed )
- Montgomery County DPS, Home Improvements list: playground equipment, playhouses and treehouses among work that most likely needs no permit; sheds on the permit side. (accessed )
- Prince George's County DPIE, information about the permit process: 27 municipalities in the county, whose permit requirements vary, and projects that need both county and town permits. (accessed )
- City of Annapolis, Licenses and Permits: applications through the Citizen Self Service portal. (accessed )
- Maryland Manual On-Line: Baltimore County has no incorporated towns or cities. (accessed )
- Maryland Manual On-Line: Howard County has no incorporated towns or cities. (accessed )
- Montgomery County DPS development standards sheet for the R-60 zone (marked for guidance only): accessory building rear yard, setbacks and height. (accessed )
- Montgomery County DPS electrical permit process: a Maryland master electrician license, and the homeowner examination for a limited scope of work. (accessed )
- Maryland Code, Natural Resources 8-1807: the Critical Area covers land within 1,000 feet beyond the landward boundaries of tidal wetlands and the heads of tides. (accessed )
- Critical Area Commission FAQs: most residential building permits are handled by the local government. (accessed )
- Prince George's County DPIE Contact Us: the main number, 301-636-2000. (accessed )
- Prince George's County DPIE Homeowner Residential Permitting Guide (6-2025), section 2.1: the small-shed exemption does not apply to historic sites or inside the Chesapeake Bay Critical Area Overlay Zones. (accessed )
Get rule-change alerts
We catch permit rule and fee changes in our verification passes and post them to the rule tracker. Get them by email instead.
We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.
Look up your locality
- Maryland permit pages rules by locality