Bathroom Remodel Permit in Montgomery County, Maryland
By Mario Bailey Last checked 2026-07-12 · 1 official source
Verified against official sources Based on building codeIt depends
Quick answer
Set locally. Maryland adopts the model codes statewide but delegates permitting entirely to local jurisdictions, and local amendments prevail over the state Standards. Whether like-for-like fixture replacement is exempt, and what remodel scope (moving plumbing, wiring, or walls) triggers a permit, is determined by each county's or municipality's adopted code and exemption list, not by a statewide rule.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help
Tell us where your project stands. Free to ask; no obligation.
Where we have a vetted local pro who handles permits in Montgomery County, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.
What bathroom remodel permit costs in Montgomery County
Filed as a residential Alteration Building Permit at $0.78 per sq ft of altered area with a filing fee of 50% of the permit fee or $329.59 whichever is greater, per DPS-Fees-ResConst-FY27.pdf effective 2026-07-01; plumbing fixture work needs a separate WSSC plumbing permit outside county DPS.
How Montgomery County compares in Maryland
No Maryland jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Howard County | It depends | Interior alterations to a single family home need a $25 filing fee plus $50 f... |
| Montgomery Countythis page | It depends | Filed as a residential Alteration Building Permit at $0.78 per sq ft of alter... |
How to apply in Montgomery County
A bathroom remodel that creates a new bathroom or touches its plumbing, wiring, or walls needs a building permit application, typically filed as separate building, electrical, mechanical, and plumbing permits submitted together and backed by a floor plan showing the fixture layout. A simple like-for-like fixture swap with no other work is often exempt.
What most bathroom remodel permit applications include:
- Creating a new bathroom or toilet room, or altering, moving, or replacing a plumbing, electrical, gas, or mechanical system as part of the remodel, is regulated work that requires a permit before work starts, usually filed as separate building, electrical, mechanical, and plumbing permit applications submitted together (IRC R105.1).
- The permit application itself must identify and describe the work, describe the site, state the intended use, be accompanied by construction documents, state the valuation of the work, and be signed by the applicant or their agent (IRC R105.3).
- Those construction documents have to show the location, nature, and extent of the proposed work, which in practice means a scaled existing and proposed floor plan showing every fixture, outlet, switch, and vent fan, including the code-mandated clearances around fixtures such as the water closet (IRC R106.1.1; R307.1 fixture clearances).
- A bathroom needs ventilation: mechanical exhaust ducted to the outside where the required openable window is absent, sized in the range of 50 cubic feet per minute intermittent (IRC R303.3; M1505).
- New or relocated bathroom receptacles must be ground-fault circuit-interrupter protected (IRC E3902.1 / NEC 210.8(A)(1)).
- Tub and shower walls have to be finished with a nonabsorbent, waterproof surface extending to a minimum height above the floor (IRC R307.2).
- Routine maintenance items such as towel bars, mirrors, paint, or floor coverings done alone are commonly permit-exempt, but that exemption ends once the work relocates fixtures or opens up wiring, piping, or walls, so a like-for-like fixture swap should be checked against the local exemption list rather than assumed (IRC R105.2).
General submittal guidance from International Residential Code (IRC), 2021 edition, Sections R105, R106, R303.3, R307, and E3902. Source. Montgomery County Department of Permitting Services sets the exact checklist for Montgomery County.
Where to apply in Montgomery County:
Montgomery County Department of Permitting Services
- 2425 Reedie Drive 7th Floor Wheaton MD 20902
- Phone: 240-777-0311
Inspections and closing out your permit
Once the permit is issued, the work stays subject to inspection at each stage, and the plumbing, mechanical, and electrical rough-in must be inspected and approved before the walls are closed up. A final inspection, made after everything required by the permit is done, closes out the job.
- Any construction or work covered by the permit stays subject to inspection and must remain accessible and exposed until the building official approves it (IRC R109.1).
- The plumbing, mechanical, and electrical rough-in has to be inspected and approved before it is covered or concealed, before fixtures or appliances are installed, and before the framing inspection, so the trade work behind the walls is signed off before drywall closes them up (IRC R109.1.2, R109.1.4).
- Work cannot proceed past the point covered by the last approved inspection without the building official's sign-off (IRC R109.4).
- Scheduling is on the permit holder: it is their duty to notify the building official when work is ready and to provide access for each inspection (IRC R109.3).
- A final inspection, covering everything required by the permit including items such as GFCI protection, closes out the job once all the permitted work is complete (IRC R109.1.6).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Montgomery County permit portal or by phone at 240-777-0311.
Inspection sequence from International Residential Code (IRC), 2021 edition, Section R109 (Inspections). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Bathroom Remodel Permit checklist for Montgomery County
- Confirm the requirement. Sometimes, depending on the project.
- Budget the fee. Filed as a residential Alteration Building Permit at $0.78 per sq ft of altered area with a filing fee of 50% of the permit fee or $329.59 whichever is greater, per DPS-Fees-ResConst-FY27.pdf effective 2026-07-01; plumbing fixture work needs a separate WSSC plumbing permit outside county DPS. Official fee schedule.
- Apply. A bathroom remodel that creates a new bathroom or touches its plumbing, wiring, or walls needs a building permit application, typically filed as separate building, electrical, mechanical, and plumbing permits submitted together and backed by a floor plan showing the fixture layout. A simple like-for-like fixture swap with no other work is often exempt. Start at the Montgomery County permit portal.
- Keep the office details handy. Montgomery County Department of Permitting Services. Phone: 240-777-0311. Address: 2425 Reedie Drive 7th Floor Wheaton MD 20902.
- Plan for inspections. Once the permit is issued, the work stays subject to inspection at each stage, and the plumbing, mechanical, and electrical rough-in must be inspected and approved before the walls are closed up. A final inspection, made after everything required by the permit is done, closes out the job.
Compiled from the official sources on this page. Last checked 2026-07-12.
The checklist stays on this page either way. We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.
First-time inspection pass rates in Montgomery County
Measured from Montgomery County's own inspection event log: how often each inspection type passes on the first visit.
- FINAL: 72% pass first time (n=16,764)
- FOOTING,PIERS, FOUNDATION: 85% pass first time (n=8,077)
- FRAMING OR CLOSE IN-ADD&ALTER: 75% pass first time (n=8,057)
- PERMIT NOTIFICATION SIGN: 77% pass first time (n=5,681)
- INSULATION INSPECTION: 91% pass first time (n=5,502)
2023-07-26 to 2026-07-26. Source: Montgomery County permit inspections (open data). Full study.
Permitting activity in Montgomery County
In 2024, Montgomery County authorized permits for 3,656 new residential housing units (1,491 single-family, 2,165 in multi-family buildings), valued at $901M, up from2,860 the year before. That works out to about 3.4 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 1,082,273.
About Montgomery County
Montgomery County has about 405,127 housing units. The median home is valued at $615,200, against a median household income of $128,733. About 65% of homes are owner-occupied, and the typical home was built around 1980.
Source: U.S. Census Bureau, American Community Survey 2023 5-year.
Frequently asked questions
- Do you need a bathroom remodel permit in Montgomery County?
- Set locally. Maryland adopts the model codes statewide but delegates permitting entirely to local jurisdictions, and local amendments prevail over the state Standards. Whether like-for-like fixture replacement is exempt, and what remodel scope (moving plumbing, wiring, or walls) triggers a permit, is determined by each county's or municipality's adopted code and exemption list, not by a statewide rule. Always confirm with the Montgomery County Department of Permitting Services before starting.
- How much does a bathroom remodel permit cost in Montgomery County?
- Filed as a residential Alteration Building Permit at $0.78 per sq ft of altered area with a filing fee of 50% of the permit fee or $329.59 whichever is greater, per DPS-Fees-ResConst-FY27.pdf effective 2026-07-01; plumbing fixture work needs a separate WSSC plumbing permit outside county DPS. See the official fee schedule for current amounts.
- How long does a bathroom remodel permit take in Montgomery County?
- Across 6,440 recent residential permit records in Montgomery County, the median time to issue was 20 days. Individual projects vary with scope and office workload, so confirm with the office.
- Where do you apply for a bathroom remodel permit in Montgomery County?
- You can apply through the Montgomery County permit portal or contact the Montgomery County Department of Permitting Services directly. The links are listed on this page.
- Can a homeowner pull a bathroom remodel permit themselves in Montgomery County?
- Under Maryland law (Md. Code, Bus. Occ. and Prof. 12-301(b), 6-607(1); Public Safety 12-505): It depends on the trade and the county. Plumbing: state law exempts an individual who personally provides plumbing services in their own residence, but homeowners may not make final connections between the residence and public or private water supply or disposal systems, and Baltimore County plus the WSSC-area counties are largely carved out of the state plumbing title. Electrical: the Maryland Electricians Act prohibits providing electrical services for compensation without a license; it has no express homeowner exemption, so uncompensated work on one's own home falls outside the licensing prohibition, but each county decides whether it will issue an electrical permit to an unlicensed homeowner. Building permits are issued by local jurisdictions, which set their own owner-applicant rules. Confirm how Montgomery County applies this before you apply.
From the Library
What else needs a permit in Montgomery County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Not specified | $223.87 flat for an open unenclosed deck 500 sq ft or less, or $0.8830 per sq ft for de... |
| Electrical Permit | Permit required | Not specified | $111.94 minimum fee for a residential one or two family dwelling electrical permit, cha... |
| EV Charger Permit | It depends | Not specified | $62.19 for an Electrical Charging Station under Other Electrical Equipment, charged in... |
| Fence Permit | Permit required | Not specified | $89.54 flat Fence Permit fee per DPS-Fees-ResConst-FY27.pdf effective 2026-07-01; |
| HVAC Permit | Permit required | Not specified | Mechanical Permit minimum fee $80.84 for a residential one or two family dwelling, char... |
| Patio Permit | No permit needed | Not specified | No fee for a ground-level concrete or paver patio since no permit is required; |
| Plumbing Permit | Permit required | Not specified | No county DPS fee for plumbing; |
| Pool Permit | Permit required | Not specified | $360.68 for a private in-ground swimming pool including its fence per DPS-Fees-ResConst... |
| Roof Replacement Permit | No permit needed | Not specified | No fee for replacing only the roof covering since no permit is required; |
| Shed Permit | Permit required | Not specified | Priced as an Accessory Building: $136.80 flat for 200 sq ft or less, or $0.8830 per sq... |
| Solar Permit | Permit required | Not specified | $261.18 flat for rooftop solar panels, with a reduced $130.59 fee for rooftop solar pan... |
| Water Heater Permit | It depends | Not specified | No county DPS fee; |
Bathroom Remodel Permit in other Maryland localities
Official sources
Verified by a person against the sources above on 2026-07-12, not confirmed with Montgomery County Department of Permitting Services. Rules change; confirm before you build. How we verify.
Last checked: 2026-07-12Report an error on this page
Compare Bathroom Remodel Permit requirements across Maryland localities
Maryland rule changes
- Howard County, MD raises shed and fence permit-exemption limits (CB24-2025)
CB24-2025 (Bill No. 24-2025) · 2026-07-25
- Montgomery County, MD FY27 permit fee schedules take effect
FY27 Fee Schedule (Council-approved FY27 Budget) · 2026-07-25