Maryland / Montgomery County

Deck Permit in Montgomery County, Maryland

By Mario Bailey Last checked 2026-06-18 · 2 official sources

Verified against official sources Confirmed on official page

Permit required

Quick answer

A building permit is required for all decks supported by footings in Montgomery County regardless of height above grade. Applications must be submitted electronically through the DPS eServices system. Single-span single-level decks without roofs or hot tubs may use the county Residential Deck Details form in lieu of full construction plans. Fast Track processing is available for eligible projects.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help

Tell us where your project stands. Free to ask; no obligation.

Where we have a vetted local pro who handles permits in Montgomery County, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

When a permit is usually needed

Before constructing any footing-supported deck regardless of height above grade

What your deck permit must meet in Maryland

Maryland requires every local jurisdiction to enforce the same residential code edition statewide, currently the 2021 IRC. The state's own amendments touch only scope, administration, and energy provisions, not the deck-framing chapter, so decks are built to the unmodified national model code as the statewide baseline.

  • The statewide baseline is the model code itself: the 2021 International Residential Code is incorporated by reference in the Maryland Building Performance Standards (COMAR 09.12.51.04).
  • Maryland's amendments to the IRC cover only Chapter 1 (Scope and Administration) and the Chapter 11 energy-efficiency provisions; no structural chapter, including the deck-framing provisions, is modified, so deck construction follows the published 2021 IRC text (COMAR 09.12.51.04).

Based on 2021 IRC, adopted via COMAR 09.12.51 Maryland Building Performance Standards. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.

What deck permit costs in Montgomery County

$223.87 flat for an open unenclosed deck 500 sq ft or less, or $0.8830 per sq ft for decks over 500 sq ft, per DPS-Fees-ResConst-FY27.pdf effective 2026-07-01 to 2027-06-30.

Official fee schedule

How Montgomery County compares in Maryland

No Maryland jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Howard CountyPermit required$50 per structure (Miscellaneous Structures Accessory permit, FY2027 Building...
Montgomery Countythis pagePermit required$223.87 flat for an open unenclosed deck 500 sq ft or less, or $0.8830 per sq...

How to apply in Montgomery County

A residential deck permit application is a set of construction documents that show what will be built and prove it meets the IRC deck provisions. In practice that means a scaled site plan locating the deck and its setbacks, plus deck plans and structural details covering the footings, posts, beams, joists, ledger, guards, and stairs.

What most deck permit applications include:

  • A permit application identifying the work, the deck's size (square footage), and whether electrical work such as lights or receptacles is included, submitted for plan review before construction begins (IRC R106).
  • A scaled site plan (for example 1/4 inch to 1 foot) showing the new deck's location relative to the house, its overall length and width, and dimensioned distances from the deck to all property lines and other structures so required setbacks can be verified (IRC R106.1.1).
  • A deck plan drawn to scale showing overall dimensions and the framing layout: joist size, spacing, span, and species; beam size and span; post size and height; and footing or pier size and depth (IRC R507.4 posts, R507.5 beams, R507.6 joists, R507.3 footings).
  • A section or side elevation with connection details showing the ledger attachment to the house band joist with flashing, the fastener or bolt schedule, joist hangers, post-to-beam and post-to-footing connections, and the required lateral load connection (IRC R507.9 ledger connection, R507.9.2 lateral connection, R507.2.4 flashing).
  • Footing sizing derived from tributary area, the soil bearing value, and design loads per IRC Table R507.3.1, with footings shown bearing on undisturbed soil at the frost depth required by the jurisdiction (IRC R507.3).
  • Details for the guards required where the walking surface is more than 30 inches above grade, and for the stairs and handrails, showing guard height and opening limits, stair riser and tread dimensions, and handrail location (IRC R312 guards, R311.7 stairs and handrails).
  • For designs that fall outside the prescriptive R507 tables (for example multi-story or stacked decks, or a ledger attached to a cantilever), engineered and stamped structural plans are submitted in place of the prescriptive details (IRC R507.1 and R301).

General submittal guidance from IRC R106.1.1 (construction documents) and IRC R507 (exterior decks), 2021 IRC. Source. Montgomery County Department of Permitting Services sets the exact checklist for Montgomery County.

Where to apply in Montgomery County:

Montgomery County Department of Permitting Services

  • 2425 Reedie Drive 7th Floor Wheaton MD 20902
  • Phone: 240-777-0311

Inspections and closing out your permit

Deck work is inspected in sequence as it is built: the footings before concrete is placed, the framing before the decking boards go down, and a final inspection once the deck is complete. Each stage checks the items that would be hidden or unsafe if missed.

  1. Footing or pier inspection: after the holes are dug and any forms or reinforcing are set but before concrete is placed, the inspector checks footing depth and diameter, a flat undisturbed bearing surface, and that the holes are free of water (IRC R109.1.1 foundation inspection; R507.3 footings).
  2. Framing inspection: after the deck is framed but before the decking conceals it, the inspector verifies the ledger attachment and its flashing, the fastener and bolt schedule, joist hangers and metal connectors, post-to-beam and post-to-footing connections, and the lateral load connection; call it before decking is installed (IRC R109.1.4 frame inspection; R507.9 ledger and flashing).
  3. Final inspection: after the deck is complete and before it is used, the inspector confirms guard height and opening limits (a 4 inch sphere must not pass, 4 3/8 inch at stairs), stair riser and tread dimensions, handrail height and graspability where there are 4 or more risers, stair landings, and required stair lighting (IRC R109.1.6 final inspection; R312 guards, R311.7 stairs and handrails).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Montgomery County permit portal or by phone at 240-777-0311.

Inspection sequence from IRC R109 (inspections: R109.1.1 footing before concrete, R109.1.4 frame, R109.1.6 final), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.

Real Deck Permit data in Montgomery County

Across 780 recent deck permit records in Montgomery County: median project value $14,000; they typically took 12 days to issue.

Medians of real issued-permit records, not a quote.

Data as of 2026-07-12. Source: Montgomery County residential building permits (open data).

First-time inspection pass rates in Montgomery County

Measured from Montgomery County's own inspection event log: how often each inspection type passes on the first visit.

  • FINAL: 72% pass first time (n=16,764)
  • FOOTING,PIERS, FOUNDATION: 85% pass first time (n=8,077)
  • FRAMING OR CLOSE IN-ADD&ALTER: 75% pass first time (n=8,057)
  • PERMIT NOTIFICATION SIGN: 77% pass first time (n=5,681)
  • INSULATION INSPECTION: 91% pass first time (n=5,502)

2023-07-26 to 2026-07-26. Source: Montgomery County permit inspections (open data). Full study.

Permitting activity in Montgomery County

In 2024, Montgomery County authorized permits for 3,656 new residential housing units (1,491 single-family, 2,165 in multi-family buildings), valued at $901M, up from2,860 the year before. That works out to about 3.4 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 1,082,273.

About Montgomery County

Montgomery County has about 405,127 housing units. The median home is valued at $615,200, against a median household income of $128,733. About 65% of homes are owner-occupied, and the typical home was built around 1980.

Source: U.S. Census Bureau, American Community Survey 2023 5-year.

Frequently asked questions

Do you need a deck permit in Montgomery County?
A building permit is required for all decks supported by footings in Montgomery County regardless of height above grade. Applications must be submitted electronically through the DPS eServices system. Single-span single-level decks without roofs or hot tubs may use the county Residential Deck Details form in lieu of full construction plans. Fast Track processing is available for eligible projects. Always confirm with the Montgomery County Department of Permitting Services before starting.
How much does a deck permit cost in Montgomery County?
$223.87 flat for an open unenclosed deck 500 sq ft or less, or $0.8830 per sq ft for decks over 500 sq ft, per DPS-Fees-ResConst-FY27.pdf effective 2026-07-01 to 2027-06-30. See the official fee schedule for current amounts.
How long does a deck permit take in Montgomery County?
Across 780 recent deck permit records in Montgomery County, the median time to issue was 12 days. Individual projects vary with scope and office workload, so confirm with the office.
Where do you apply for a deck permit in Montgomery County?
You can apply through the Montgomery County permit portal or contact the Montgomery County Department of Permitting Services directly. The links are listed on this page.
Can a homeowner pull a deck permit themselves in Montgomery County?
Under Maryland law (Md. Code, Bus. Occ. and Prof. 12-301(b), 6-607(1); Public Safety 12-505): It depends on the trade and the county. Plumbing: state law exempts an individual who personally provides plumbing services in their own residence, but homeowners may not make final connections between the residence and public or private water supply or disposal systems, and Baltimore County plus the WSSC-area counties are largely carved out of the state plumbing title. Electrical: the Maryland Electricians Act prohibits providing electrical services for compensation without a license; it has no express homeowner exemption, so uncompensated work on one's own home falls outside the licensing prohibition, but each county decides whether it will issue an electrical permit to an unlicensed homeowner. Building permits are issued by local jurisdictions, which set their own owner-applicant rules. Confirm how Montgomery County applies this before you apply.

From the Library

What else needs a permit in Montgomery County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsNot specifiedFiled as a residential Alteration Building Permit at $0.78 per sq ft of altered area wi...
Electrical PermitPermit requiredNot specified$111.94 minimum fee for a residential one or two family dwelling electrical permit, cha...
EV Charger PermitIt dependsNot specified$62.19 for an Electrical Charging Station under Other Electrical Equipment, charged in...
Fence PermitPermit requiredNot specified$89.54 flat Fence Permit fee per DPS-Fees-ResConst-FY27.pdf effective 2026-07-01;
HVAC PermitPermit requiredNot specifiedMechanical Permit minimum fee $80.84 for a residential one or two family dwelling, char...
Patio PermitNo permit neededNot specifiedNo fee for a ground-level concrete or paver patio since no permit is required;
Plumbing PermitPermit requiredNot specifiedNo county DPS fee for plumbing;
Pool PermitPermit requiredNot specified$360.68 for a private in-ground swimming pool including its fence per DPS-Fees-ResConst...
Roof Replacement PermitNo permit neededNot specifiedNo fee for replacing only the roof covering since no permit is required;
Shed PermitPermit requiredNot specifiedPriced as an Accessory Building: $136.80 flat for 200 sq ft or less, or $0.8830 per sq...
Solar PermitPermit requiredNot specified$261.18 flat for rooftop solar panels, with a reduced $130.59 fee for rooftop solar pan...
Water Heater PermitIt dependsNot specifiedNo county DPS fee;

Deck Permit in other Maryland localities

Official sources

Verified by a person against the sources above on 2026-06-18, not confirmed with Montgomery County Department of Permitting Services. Rules change; confirm before you build. How we verify.

Last checked: 2026-06-18Report an error on this page

Compare Deck Permit requirements across Maryland localities