West Virginia / Berkeley County

Bathroom Remodel Permit in Berkeley County, West Virginia

Permit required

Yes, a permit is required

Before remodeling a bathroom, including replacing fixtures or moving plumbing or wiring.

Quick answer

Unincorporated Berkeley County treats remodeling as permitted work: its general rule requires a permit to alter or repair a structure or to replace any plumbing, electrical or mechanical system, and the fee schedule prices interior renovations and remodeling at $59.00 plus $0.14 per sq ft. The county publishes no exemption for like-for-like fixture swaps or finish-only work.

Issued by
Berkeley County Building Permits and Inspections
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Remodel contractors usually handle the permits as part of the job. Comparing a few bids before you commit is the useful next step.

Compare bathroom remodel quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a bathroom remodel permit costs in Berkeley County

Fee schedule in force
Official scheduleRead .

Residential: "Interior Renovations/Remodeling" $59.00 plus .14 sq ft. Berkeley County Building Permit/Inspection Fees schedule (Rev: 5/17/12, 6/1/17, 4/18/24).

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Berkeley County

General guide, not specific to this office

What a bathroom remodel permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a bathroom remodel permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Berkeley County Building Permits and Inspections

  • 400 West Stephen Street, Suite 202, Martinsburg, WV 25401
  • Phone: 304-264-1966
  • Email: bross@berkeleywv.org

What else needs a permit in Berkeley County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeSee schedule
Electrical PermitPermit requiredAny sizeSee schedule
EV Charger PermitPermit requiredAny sizeSee schedule
Fence PermitIt dependsfence height above which the county fee schedule lists a permitResidential: "Fences over 7 ft. in Height-Must Provide Plans and Specs" $47.00
HVAC PermitPermit requiredAny sizeResidential: "HVAC Review" $47.00
Plumbing PermitPermit requiredAny sizeCommercial: "Plumbing Review" $24.00 application fee plus $18.00 for 1st $1,000.00 plus $12.00 per each additional $1,000.00
Pool PermitPermit requiredAny sizeResidential: "Above Ground Pool Review" $41.00 Base plus .14 sq. ft
Shed PermitPermit requiredAny sizeResidential: "Storage Building 200 sq. ft. or less (Cannot Be Connected to Any Utilities or be in Floodplain)" $12.00
Solar PermitPermit requiredAny sizeSee schedule
Water Heater PermitPermit requiredAny sizeResidential: "Hot Water Heater Review" $41.00

Frequently asked questions

Do you need a bathroom remodel permit in Berkeley County?
Yes, before remodeling a bathroom, including replacing fixtures or moving plumbing or wiring. If you are unsure how that applies to your project, call the Berkeley County Building Permits and Inspections at 304-264-1966 before you start.
How much does a bathroom remodel permit cost in Berkeley County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 8 Nov 2026. For the figure on your own project, call the Berkeley County Building Permits and Inspections at 304-264-1966.
Where do you apply for a bathroom remodel permit in Berkeley County?
You can apply through the Berkeley County permit portal or contact the Berkeley County Building Permits and Inspections directly. The links are listed on this page.
Can a homeowner pull a bathroom remodel permit themselves in Berkeley County?
Under West Virginia law (W. Va. Code 30-42-6(c)(8); 30-42-3(d)(2); 30-42-10(a); 29-3B-3(a)(1); 21-14-3(c)(1)): The West Virginia Contractor Licensing Act exempts work personally performed on a structure by its owner or occupant, and its definition of contractor excludes a person who personally does construction work on property they own or lease. When an owner applies for a building permit, state law requires the applicant either to show a contractor license or to file a written affidavit that they are not subject to licensure, so a homeowner signs that affidavit instead. Owners may also do their own electrical work on property they or their immediate family own or lease (29-3B-3) and their own plumbing on a single-family home they or their immediate family own or lease (21-14-3). The statutes contain no resale or occupancy waiting period like Florida's; the local permit office still requires permits and inspections where the State Building Code is adopted. Confirm how Berkeley County applies this before you apply.

From the Library

Everything above, sourced

How this bathroom remodel permit page for Berkeley County was verified. 2 official sources: berkeleywv.org, berkeleywv.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Berkeley County Building Permits and Inspections. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project