West Virginia / Berkeley County
Electrical Permit in Berkeley County, West Virginia
Permit required
Yes, a permit is required
Before installing, altering or replacing electrical wiring, circuits or service equipment.
Quick answer
Electrical work in unincorporated Berkeley County is covered by the county building permit, but the inspections are a handoff: county staff do not inspect wiring, and a county-approved third-party electrical inspector does, with a separate fee paid directly to that inspector. Rough and final electrical inspections must be done by the same inspector, and the inspector's sticker must be present at the building inspections.
- Issued by
- Berkeley County Building Permits and Inspections
- Phone
- 304-264-1966
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.
Compare electrician quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What an electrical permit costs in Berkeley County
- Fee schedule in force
- Official scheduleRead .
No separate electrical permit fee appears on the county fee schedule;
the third-party inspector charges a separate fee paid directly to the inspector.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How to apply in Berkeley County
General guide, not specific to this office
What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Berkeley County Building Permits and Inspections
- 400 West Stephen Street, Suite 202, Martinsburg, WV 25401
- Phone: 304-264-1966
- Email: bross@berkeleywv.org
Your Electrical Permit checklist for Berkeley County
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: berkeleywv.org: Engineering.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Berkeley County permit portal.
- Keep the office details handy. Berkeley County Building Permits and Inspections. Phone: 304-264-1966. Email: bross@berkeleywv.org. Address: 400 West Stephen Street, Suite 202, Martinsburg, WV 25401.
Compiled from the official sources on this page. Last checked .
What else needs a permit in Berkeley County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | Permit required | Any size | Residential: "Interior Renovations/Remodeling" $59.00 plus .14 sq ft. Berkeley County Building Permit/Inspection Fees schedule (Rev: 5/17/12, 6/1/17, 4/18/24) |
| Deck Permit | Permit required | Any size | See schedule |
| EV Charger Permit | Permit required | Any size | See schedule |
| Fence Permit | It depends | fence height above which the county fee schedule lists a permit | Residential: "Fences over 7 ft. in Height-Must Provide Plans and Specs" $47.00 |
| HVAC Permit | Permit required | Any size | Residential: "HVAC Review" $47.00 |
| Plumbing Permit | Permit required | Any size | Commercial: "Plumbing Review" $24.00 application fee plus $18.00 for 1st $1,000.00 plus $12.00 per each additional $1,000.00 |
| Pool Permit | Permit required | Any size | Residential: "Above Ground Pool Review" $41.00 Base plus .14 sq. ft |
| Shed Permit | Permit required | Any size | Residential: "Storage Building 200 sq. ft. or less (Cannot Be Connected to Any Utilities or be in Floodplain)" $12.00 |
| Solar Permit | Permit required | Any size | See schedule |
| Water Heater Permit | Permit required | Any size | Residential: "Hot Water Heater Review" $41.00 |
Frequently asked questions
- Do you need an electrical permit in Berkeley County?
- Yes, before installing, altering or replacing electrical wiring, circuits or service equipment. If you are unsure how that applies to your project, call the Berkeley County Building Permits and Inspections at 304-264-1966 before you start.
- How much does an electrical permit cost in Berkeley County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 8 Nov 2026. For the figure on your own project, call the Berkeley County Building Permits and Inspections at 304-264-1966.
- Where do you apply for an electrical permit in Berkeley County?
- You can apply through the Berkeley County permit portal or contact the Berkeley County Building Permits and Inspections directly. The links are listed on this page.
- Can a homeowner pull an electrical permit themselves in Berkeley County?
- Under West Virginia law (W. Va. Code 30-42-6(c)(8); 30-42-3(d)(2); 30-42-10(a); 29-3B-3(a)(1); 21-14-3(c)(1)): The West Virginia Contractor Licensing Act exempts work personally performed on a structure by its owner or occupant, and its definition of contractor excludes a person who personally does construction work on property they own or lease. When an owner applies for a building permit, state law requires the applicant either to show a contractor license or to file a written affidavit that they are not subject to licensure, so a homeowner signs that affidavit instead. Owners may also do their own electrical work on property they or their immediate family own or lease (29-3B-3) and their own plumbing on a single-family home they or their immediate family own or lease (21-14-3). The statutes contain no resale or occupancy waiting period like Florida's; the local permit office still requires permits and inspections where the State Building Code is adopted. Confirm how Berkeley County applies this before you apply.
From the Library
Everything above, sourced
How this electrical permit page for Berkeley County was verified. 2 official sources: berkeleywv.org, berkeleywv.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Berkeley County Building Permits and Inspections. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page