West Virginia / Berkeley County
Solar Permit in Berkeley County, West Virginia
Permit required
Yes, a permit is required
Before installing rooftop or ground-mounted solar.
Quick answer
Unincorporated Berkeley County issues a Solar Energy System permit through its One Stop portal, requiring a site plan and manufacturer specifications, plan review, and final inspections. The county's general rule also requires a permit to install any electrical system, and electrical inspections are done by a county-approved third-party electrical inspector.
- Issued by
- Berkeley County Building Permits and Inspections
- Phone
- 304-264-1966
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your West Virginia Contractor Licensing Board license active, and under which business name? Verify it on wvclboard.wv.gov.
West Virginia's owner-builder rule (W. Va. Code 30-42-6(c)(8); 30-42-3(d)(2); 30-42-10(a); 29-3B-3(a)(1); 21-14-3(c)(1)) sets what you may do on your own home without hiring anyone. Read the statute.
What a solar permit costs in Berkeley County
- Fee schedule in force
- Official scheduleRead .
- No residential solar line item is published;
- the fee schedule's solar fees are for Commercial Solar Farms only (under one acre $295.00; $1,000.00 per acre for the first one to fifty acres).
- Berkeley County Building Permit/Inspection Fees schedule (Rev: 5/17/12, 6/1/17, 4/18/24).
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How to apply in Berkeley County
General guide, not specific to this office
What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Berkeley County Building Permits and Inspections
- 400 West Stephen Street, Suite 202, Martinsburg, WV 25401
- Phone: 304-264-1966
- Email: bross@berkeleywv.org
Your Solar Permit checklist for Berkeley County
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: berkeleywv.org: Engineering.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Berkeley County permit portal.
- Keep the office details handy. Berkeley County Building Permits and Inspections. Phone: 304-264-1966. Email: bross@berkeleywv.org. Address: 400 West Stephen Street, Suite 202, Martinsburg, WV 25401.
Compiled from the official sources on this page. Last checked .
What else needs a permit in Berkeley County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | Permit required | Any size | Residential: "Interior Renovations/Remodeling" $59.00 plus .14 sq ft. Berkeley County Building Permit/Inspection Fees schedule (Rev: 5/17/12, 6/1/17, 4/18/24) |
| Deck Permit | Permit required | Any size | See schedule |
| Electrical Permit | Permit required | Any size | See schedule |
| EV Charger Permit | Permit required | Any size | See schedule |
| Fence Permit | It depends | fence height above which the county fee schedule lists a permit | Residential: "Fences over 7 ft. in Height-Must Provide Plans and Specs" $47.00 |
| HVAC Permit | Permit required | Any size | Residential: "HVAC Review" $47.00 |
| Plumbing Permit | Permit required | Any size | Commercial: "Plumbing Review" $24.00 application fee plus $18.00 for 1st $1,000.00 plus $12.00 per each additional $1,000.00 |
| Pool Permit | Permit required | Any size | Residential: "Above Ground Pool Review" $41.00 Base plus .14 sq. ft |
| Shed Permit | Permit required | Any size | Residential: "Storage Building 200 sq. ft. or less (Cannot Be Connected to Any Utilities or be in Floodplain)" $12.00 |
| Water Heater Permit | Permit required | Any size | Residential: "Hot Water Heater Review" $41.00 |
Frequently asked questions
- Do you need a solar permit in Berkeley County?
- Yes, before installing rooftop or ground-mounted solar. If you are unsure how that applies to your project, call the Berkeley County Building Permits and Inspections at 304-264-1966 before you start.
- How much does a solar permit cost in Berkeley County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 8 Nov 2026. For the figure on your own project, call the Berkeley County Building Permits and Inspections at 304-264-1966.
- Where do you apply for a solar permit in Berkeley County?
- You can apply through the Berkeley County permit portal or contact the Berkeley County Building Permits and Inspections directly. The links are listed on this page.
- Can a homeowner pull a solar permit themselves in Berkeley County?
- Under West Virginia law (W. Va. Code 30-42-6(c)(8); 30-42-3(d)(2); 30-42-10(a); 29-3B-3(a)(1); 21-14-3(c)(1)): The West Virginia Contractor Licensing Act exempts work personally performed on a structure by its owner or occupant, and its definition of contractor excludes a person who personally does construction work on property they own or lease. When an owner applies for a building permit, state law requires the applicant either to show a contractor license or to file a written affidavit that they are not subject to licensure, so a homeowner signs that affidavit instead. Owners may also do their own electrical work on property they or their immediate family own or lease (29-3B-3) and their own plumbing on a single-family home they or their immediate family own or lease (21-14-3). The statutes contain no resale or occupancy waiting period like Florida's; the local permit office still requires permits and inspections where the State Building Code is adopted. Confirm how Berkeley County applies this before you apply.
From the Library
Everything above, sourced
How this solar permit page for Berkeley County was verified. 2 official sources: berkeleywv.org, onestop.berkeleywv.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Berkeley County Building Permits and Inspections. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page