Alabama / Birmingham

Bathroom Remodel Permit in Birmingham, Alabama

It depends

Sometimes, depending on the project

Before any bathroom work beyond painting, papering, flooring, cabinets, countertops and similar finish work.

Confirmed on official page Verified

Issued byCity of Birmingham Department of Planning, Engineering & Permits (PEP), Permitting & Inspection Division

By Mario Bailey, verified against official sources

Quick answer

In a single-family home, painting, papering, carpeting, cabinets, countertops and similar finish work need no permit in Birmingham. Any other bathroom work needs a building permit, and new or moved plumbing, wiring or ventilation needs the matching trade permits; if plumbing is added or changed, a Jefferson County sewer impact permit copy is also required.

Who is pulling this permit?

Hire it out

Sponsored

Remodel contractors usually handle the permits as part of the job. Comparing a few bids before you commit is the useful next step.

Compare bathroom remodel quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

When a permit is usually needed

Before any bathroom work beyond painting, papering, flooring, cabinets, countertops and similar finish work.

What a bathroom remodel permit costs in Birmingham

Line item
bathroom remodel permitBy formulaTechnical Code of the City of Birmingham, 2024 (effective 10/1/2024), Article V: "Building permit fees shall be determined at a rate of $9.50 per $1000 valuation", with a minimum charge for any permit of $125.00. Work begun before the permit pays a doubled fee (section 104.2). For alterations and repairs, "all trades" pay fees based on the value of their own work (Article V).
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Birmingham

In Birmingham, a bathroom remodel that creates a new bathroom or touches its plumbing, wiring, or walls needs a building permit application, typically filed as separate building, electrical, mechanical, and plumbing permits submitted together and backed by a floor plan showing the fixture layout. A simple like-for-like fixture swap with no other work is often exempt.

What most bathroom remodel permit applications include:

  • Creating a new bathroom or toilet room, or altering, moving, or replacing a plumbing, electrical, gas, or mechanical system as part of the remodel, is regulated work that requires a permit before work starts, usually filed as separate building, electrical, mechanical, and plumbing permit applications submitted together (IRC R105.1).
  • For Birmingham, the permit application itself must identify and describe the work, describe the site, state the intended use, be accompanied by construction documents, state the valuation of the work, and be signed by the applicant or their agent (IRC R105.3).
  • Those construction documents have to show the location, nature, and extent of the proposed work, which in practice means a scaled existing and proposed floor plan showing every fixture, outlet, switch, and vent fan, including the code-mandated clearances around fixtures such as the water closet (IRC R106.1.1; R307.1 fixture clearances).
  • For Birmingham, a bathroom needs ventilation: mechanical exhaust ducted to the outside where the required openable window is absent, sized in the range of 50 cubic feet per minute intermittent (IRC R303.3; M1505).
  • New or relocated bathroom receptacles must be ground-fault circuit-interrupter protected (IRC E3902.1 / NEC 210.8(A)(1)).
  • Tub and shower walls have to be finished with a nonabsorbent, waterproof surface extending to a minimum height above the floor (IRC R307.2).
  • Routine maintenance items such as towel bars, mirrors, paint, or floor coverings done alone are commonly permit-exempt, but that exemption ends once the work relocates fixtures or opens up wiring, piping, or walls, so a like-for-like fixture swap should be checked against the local exemption list rather than assumed (IRC R105.2).

General submittal guidance from International Residential Code (IRC), 2021 edition, Sections R105, R106, R303.3, R307, and E3902. Source. City of Birmingham Department of Planning, Engineering & Permits (PEP), Permitting & Inspection Division sets the exact checklist for Birmingham.

Where to apply in Birmingham:

City of Birmingham Department of Planning, Engineering & Permits (PEP), Permitting & Inspection Division

Inspections and closing out your permit

In Birmingham, once the permit is issued, the work stays subject to inspection at each stage, and the plumbing, mechanical, and electrical rough-in must be inspected and approved before the walls are closed up. A final inspection, made after everything required by the permit is done, closes out the job.

  1. In Birmingham: any construction or work covered by the permit stays subject to inspection and must remain accessible and exposed until the building official approves it (IRC R109.1).
  2. In Birmingham: the plumbing, mechanical, and electrical rough-in has to be inspected and approved before it is covered or concealed, before fixtures or appliances are installed, and before the framing inspection, so the trade work behind the walls is signed off before drywall closes them up (IRC R109.1.2, R109.1.4).
  3. In Birmingham: work cannot proceed past the point covered by the last approved inspection without the building official's sign-off (IRC R109.4).
  4. Scheduling is on the permit holder in Birmingham: it is their duty to notify the building official when work is ready and to provide access for each inspection (IRC R109.3).
  5. In Birmingham: a final inspection, covering everything required by the permit including items such as GFCI protection, closes out the job once all the permitted work is complete (IRC R109.1.6).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Birmingham permit portal or by phone at (205) 254-2904.

Inspection sequence from International Residential Code (IRC), 2021 edition, Section R109 (Inspections). Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a bathroom remodel permit in Birmingham?
In a single-family home, painting, papering, carpeting, cabinets, countertops and similar finish work need no permit in Birmingham. Any other bathroom work needs a building permit, and new or moved plumbing, wiring or ventilation needs the matching trade permits; if plumbing is added or changed, a Jefferson County sewer impact permit copy is also required. Always confirm with the City of Birmingham Department of Planning, Engineering & Permits (PEP), Permitting & Inspection Division before starting.
How much does a bathroom remodel permit cost in Birmingham?
Technical Code of the City of Birmingham, 2024 (effective 10/1/2024), Article V: "Building permit fees shall be determined at a rate of $9.50 per $1000 valuation", with a minimum charge for any permit of $125.00. Work begun before the permit pays a doubled fee (section 104.2). For alterations and repairs, "all trades" pay fees based on the value of their own work (Article V). See the official fee schedule for current amounts.
Where do you apply for a bathroom remodel permit in Birmingham?
You can apply through the Birmingham permit portal or contact the City of Birmingham Department of Planning, Engineering & Permits (PEP), Permitting & Inspection Division directly. The links are listed on this page.
Can a homeowner pull a bathroom remodel permit themselves in Birmingham?
Under Alabama law (Ala. Code 34-14A-6(5); 34-36-13(a)(5); 34-37-15(a)(5), (b)): Yes. The home builder licensing law does not apply to owners acting as their own contractor and providing all material supervision themselves when building or improving a one- or two-family home on their own property for their own occupancy or use and not offered for sale (34-14A-6(5)a). The exemption cannot be transferred, including through a power of attorney, and selling or offering the home for sale within one year after completion is presumptive evidence it was built for sale (34-14A-6(5)b). Owners may also do their own electrical work on their premises (34-36-13(a)(5)) and their own plumbing in a building they own or occupy (34-37-15), though plumbing work stays subject to inspection under state law and local ordinances. Whether an owner may pull a local building permit is set by the city or county. Confirm how Birmingham applies this before you apply.

From the Library

What else needs a permit in Birmingham

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny size...10/1/2024), Article V: "Building permit fees shall be determined at a rate of $9.50...
Electrical PermitPermit requiredAny size$9.50 per $1000.00 valuation for alterations", "Minimum permit fee ..
EV Charger PermitPermit requiredAny size$9.50 per $1000.00 valuation for alterations", "Minimum permit fee ..
Fence PermitPermit requiredAny size...1, Chapter 9, Article VIII, Section 3 (Miscellaneous Fees): "Fence Permit"...
HVAC PermitIt dependsBefore installing, replacing, enlarging or relocating a heating, cooling or ventilation...$9.50 per $1000.00 valuation for alterations", "Minimum permit fee ..
Plumbing PermitIt dependslength of water service repaired or replaced, and no more than 50% of the service$9.50 per $1000.00 valuation for alterations", "Minimum permit fee ..
Pool PermitPermit requiredAny sizeElectrical and plumbing permits: $9.50 per $1,000.00 valuation, minimum $125.00 each...
Roof Replacement PermitIt dependsBefore reroofing a home in a historic or design review district, and before any reroof......10/1/2024), Article V: "Building permit fees shall be determined at a rate of $9.50...
Shed PermitIt dependsfloor area of an accessory structure for a one- or two-family dwelling; the exemption applies only when the Planning Division approves it...10/1/2024), Article V: "Building permit fees shall be determined at a rate of $9.50...
Solar PermitPermit requiredAny size$9.50 per $1000.00 valuation for alterations", "Minimum permit fee ..
Water Heater PermitPermit requiredAny size$9.50 per $1000.00 valuation for alterations", "Minimum permit fee ..

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Birmingham documents; the office above sets the local rules.

How this bathroom remodel permit page for Birmingham was verified. 2 official sources: birminghamal.gov, s3.us-east-2.amazonaws.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Birmingham Department of Planning, Engineering & Permits (PEP), Permitting & Inspection Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Bathroom Remodel Permit requirements across Alabama localities

Bathroom remodel permit rules nationwide

It depends
Get quotes