Alabama / Birmingham

Roof Replacement Permit in Birmingham, Alabama

It depends

Sometimes, depending on the project

Before reroofing a home in a historic or design review district, and before any reroof that repairs or replaces roof decking.

Confirmed on official page Verified

Issued byCity of Birmingham Department of Planning, Engineering & Permits (PEP), Permitting & Inspection Division

By Mario Bailey, verified against official sources

Quick answer

Repairing or replacing roof shingles or roof covering, gutters and downspouts on one- and two-family dwellings and townhouses needs no permit in Birmingham, except that homes in historic or design review districts require a building permit. The City's Permitting & Inspection Division also says the shingle-replacement exemption holds only when no decking is being repaired or replaced.

Who is pulling this permit?

Hire it out

Sponsored

Roofers handle the permit in most localities when one is required. Comparing bids before you sign is the useful next step.

Compare roofing quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

When a permit is usually needed

Before reroofing a home in a historic or design review district, and before any reroof that repairs or replaces roof decking.

What a roof replacement permit costs in Birmingham

Line item
roof replacement permitBy formulaTechnical Code of the City of Birmingham, 2024 (effective 10/1/2024), Article V: "Building permit fees shall be determined at a rate of $9.50 per $1000 valuation", with a minimum charge for any permit of $125.00. Work begun before the permit pays a doubled fee (section 104.2).
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Birmingham

In Birmingham, a residential reroof permit application is lighter than for structural work: you state whether the scope is a full tear-off (roof replacement) or an overlay (roof recover), describe the covering material and its manufacturer instructions, and note the condition of the existing deck, since those facts determine which code path applies.

What most roof replacement permit applications include:

  • State on the application whether the job is a roof replacement, which strips all existing layers down to the bare deck, or a roof recover, which leaves the old covering in place under specific conditions, since the two scopes are governed differently (IRC R908.3).
  • For Birmingham, a recover is only an option where the new covering follows the roof covering manufacturer's approved instructions or is a self-supporting system, such as standing-seam metal, that does not rely on the existing roof for support (IRC R908.3.1).
  • Full tear-off must be scoped on the application instead of a recover when the existing roof is water soaked or deteriorated, is slate, clay, cement, or asbestos-cement tile, or already carries two or more layers of roof covering (IRC R908.3.1.1).
  • For Birmingham, the materials and installation methods described on the application must comply with the reroofing requirements of the roof-assemblies chapter (IRC R908.1).
  • If the scope reuses existing slate, clay, or cement tile, damaged or broken pieces cannot be listed for reinstallation, and any rusted or deteriorated flashings, edgings, outlets, or vents uncovered during tear-off must be scoped for replacement (IRC R908.5).

General submittal guidance from IRC Section R908 Reroofing (text as adopted in the 2020 Residential Code of New York State, based on the 2018 IRC). Source. City of Birmingham Department of Planning, Engineering & Permits (PEP), Permitting & Inspection Division sets the exact checklist for Birmingham.

Where to apply in Birmingham:

City of Birmingham Department of Planning, Engineering & Permits (PEP), Permitting & Inspection Division

Inspections and closing out your permit

In Birmingham, most residential reroofs get two to three field inspections keyed to the scope of work: a deck or nailing check when sheathing is exposed or replaced, a final on the completed covering and flashings, and in some high-wind regions a dedicated check of mitigation measures added during tear-off.

  1. In Birmingham: where the covering is fully removed and the sheathing is exposed, replaced, or added, inspectors check the deck and its nailing before any new roofing goes down, since the structural framework must be able to carry the new covering's loads (IRC R908.2).
  2. In Birmingham: an overlay is only approved where it meets one of the code's listed recover conditions, such as installation in accordance with the covering manufacturer's approved instructions (IRC R908.3.1).
  3. In Birmingham: flashings disturbed or replaced during the job are checked against the approved manufacturer's installation instructions, and metal flashing that will receive bituminous material must be primed before installation (IRC R908.6).
  4. In Birmingham: a final inspection confirms the completed roof covering and its fasteners were installed as required for that material and per manufacturer instructions before the permit is closed (IRC R905).
  5. In Birmingham: in some regions with strengthened wind provisions, reroofing an older single-family home also triggers inspection of supplemental deck-nailing and a secondary water barrier added during tear-off, on top of the base reroofing requirements (Florida Building Code, Residential R908.7 Mitigation).
  6. In Birmingham: reinstalled existing slate, clay, or cement tile is checked against reuse limits at inspection, and any rusted, damaged, or deteriorated flashings, edgings, outlets, or vents found during tear-off must be replaced rather than reinstalled (IRC R908.5).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Birmingham permit portal or by phone at (205) 254-2904.

Inspection sequence from IRC Section R908 Reroofing and Section R905 Roof Coverings (2021 International Residential Code). Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a roof replacement permit in Birmingham?
Repairing or replacing roof shingles or roof covering, gutters and downspouts on one- and two-family dwellings and townhouses needs no permit in Birmingham, except that homes in historic or design review districts require a building permit. The City's Permitting & Inspection Division also says the shingle-replacement exemption holds only when no decking is being repaired or replaced. Always confirm with the City of Birmingham Department of Planning, Engineering & Permits (PEP), Permitting & Inspection Division before starting.
How much does a roof replacement permit cost in Birmingham?
Technical Code of the City of Birmingham, 2024 (effective 10/1/2024), Article V: "Building permit fees shall be determined at a rate of $9.50 per $1000 valuation", with a minimum charge for any permit of $125.00. Work begun before the permit pays a doubled fee (section 104.2). See the official fee schedule for current amounts.
Where do you apply for a roof replacement permit in Birmingham?
You can apply through the Birmingham permit portal or contact the City of Birmingham Department of Planning, Engineering & Permits (PEP), Permitting & Inspection Division directly. The links are listed on this page.
Can a homeowner pull a roof replacement permit themselves in Birmingham?
Under Alabama law (Ala. Code 34-14A-6(5); 34-36-13(a)(5); 34-37-15(a)(5), (b)): Yes. The home builder licensing law does not apply to owners acting as their own contractor and providing all material supervision themselves when building or improving a one- or two-family home on their own property for their own occupancy or use and not offered for sale (34-14A-6(5)a). The exemption cannot be transferred, including through a power of attorney, and selling or offering the home for sale within one year after completion is presumptive evidence it was built for sale (34-14A-6(5)b). Owners may also do their own electrical work on their premises (34-36-13(a)(5)) and their own plumbing in a building they own or occupy (34-37-15), though plumbing work stays subject to inspection under state law and local ordinances. Whether an owner may pull a local building permit is set by the city or county. Confirm how Birmingham applies this before you apply.

From the Library

What else needs a permit in Birmingham

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsBefore any bathroom work beyond painting, papering, flooring, cabinets, countertops and......10/1/2024), Article V: "Building permit fees shall be determined at a rate of $9.50...
Deck PermitPermit requiredAny size...10/1/2024), Article V: "Building permit fees shall be determined at a rate of $9.50...
Electrical PermitPermit requiredAny size$9.50 per $1000.00 valuation for alterations", "Minimum permit fee ..
EV Charger PermitPermit requiredAny size$9.50 per $1000.00 valuation for alterations", "Minimum permit fee ..
Fence PermitPermit requiredAny size...1, Chapter 9, Article VIII, Section 3 (Miscellaneous Fees): "Fence Permit"...
HVAC PermitIt dependsBefore installing, replacing, enlarging or relocating a heating, cooling or ventilation...$9.50 per $1000.00 valuation for alterations", "Minimum permit fee ..
Plumbing PermitIt dependslength of water service repaired or replaced, and no more than 50% of the service$9.50 per $1000.00 valuation for alterations", "Minimum permit fee ..
Pool PermitPermit requiredAny sizeElectrical and plumbing permits: $9.50 per $1,000.00 valuation, minimum $125.00 each...
Shed PermitIt dependsfloor area of an accessory structure for a one- or two-family dwelling; the exemption applies only when the Planning Division approves it...10/1/2024), Article V: "Building permit fees shall be determined at a rate of $9.50...
Solar PermitPermit requiredAny size$9.50 per $1000.00 valuation for alterations", "Minimum permit fee ..
Water Heater PermitPermit requiredAny size$9.50 per $1000.00 valuation for alterations", "Minimum permit fee ..

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Birmingham documents; the office above sets the local rules.

How this roof replacement permit page for Birmingham was verified. 2 official sources: birminghamal.gov, s3.us-east-2.amazonaws.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Birmingham Department of Planning, Engineering & Permits (PEP), Permitting & Inspection Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Roof Replacement Permit requirements across Alabama localities

Roof replacement permit rules nationwide

It depends
Get quotes